Street · 5111 of 8,567 by permit count
Building permits on Arleta Ave
The City of Toronto has 23 building permits on record for Arleta Ave, going back to 1997. Those permits created 1 homes and removed 0, a net change of +1. Declared construction value totals $3.9M. The most recent permit was issued Dec 30, 2025 at 7-11 ARLETA AVE.
- Permits on record
- 231997–2025
- Declared construction value
- $3.9Mas filed, not adjusted
- Homes created
- 1dwelling units
- Homes removed
- 0net +1
Permits issued per year
20102025 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Dec 30, 2025 | Other(BA) | REV 01: Construct 3 new pergolas in the front yard. See MV decision A0346/25EYK.Proposal for modifications to improve accessibility around residential buildings, including new sidewalks, upgraded and new parking/driving/pedestrian areas, new drop-off parking, a new fenced garbage area, new shared ga | — | Open |
| Oct 27, 2022 | Interior Alterations | Proposed interior alterations to common corridor in existing apartment building | $1.0M | Open |
| Oct 27, 2022 | Interior Alterations | Proposed interior alterations to common corridor in existing apartment building | $1.0M | Open |
| Aug 22, 2022 | Fire Damage | The subject fire loss occurrence resulted in localized damages to the main-floor frame and to the affected adjoining exterior wall framing members and wall assembly. Reconstruction of the damaged wall assembly will be required, with repairs to the adversely affected floor system. | — | Closed |
| Aug 24, 2021 | Interior Alterations | Construct slab on grade repairs in unit 108 at 11 Arleta Ave | $150K | Open |
| Jan 27, 2020 | Building Permit Related(MS) | HVAC - Fire repairs to roof and sunroom | — | Closed |
| Jan 17, 2020 | Fire Damage | Fire repairs to roof and sunroom | — | Closed |
| Dec 2, 2019 | Backflow Prevention Devices (Water only) | Proposal to install new premise isolation backflow prevention device. | $10K | Closed |
| Oct 21, 2016 | Alter: Add on /Ductwork | remove existing make up air units (total of 6) and exhaust units (total of 10), install 2 central make up air units (one per building) and ductwork on rooftops to connect to existing ductwork | $300K | Closed |
| Oct 14, 2016 | Other(BA) | permit for structural roof work for new make up air units | $300K | Open |
| Aug 26, 2016 | Building Permit Related (DR) | Drain - SECOND UNIT IN EXISTING 1 STOREY SEMI DETACHED HOUSE | — | Closed |
| Aug 26, 2016 | Building Permit Related(PS) | Plumbing - SECOND UNIT IN EXISTING 1 STOREY SEMI DETACHED HOUSE | — | Open |
| Aug 26, 2016 | Second Suite (New) | SECOND UNIT IN EXISTING 1 STOREY SEMI DETACHED HOUSE | $25K | Open |
| Apr 21, 2016 | Alter: Boiler/Furnace/AC Replacement | Retrofit of boiler room to install natural gas fired heat pumps, exterior to the building, for domestic hot water heating. Additional boilers to be installed for space and domestic hot water heating. Installation of variable frequency drives on domestic cold water pumps. | $400K | Closed |
| May 29, 2014 | Other(BA) | Installation of door opening between office and dwelling unit. | $1K | Open |
| Aug 7, 2012 | Solar Collector | Install roof top solar panels. | $250K | Closed |
| Aug 7, 2012 | Solar Collector | Install roof top solar panels. | $250K | Closed |
| Oct 17, 2011 | Fire Alarm | Fire alarm, Building A | $100K | Closed |
| Oct 17, 2011 | Fire Alarm | Fire alarm, Building B, includes recreational area | $100K | Closed |
| May 12, 2011 | Fire Damage | Partial reroofing and interior alteration to the rear of the dwelling due to fire damage | — | Open |
| Mar 29, 2010 | MGO Remediation | MGO Remediation | $43K | Closed |
| Mar 2, 2010 | MGO Remediation | Remediation only - for marijuana grow operation | $1K | Closed |
| Dec 11, 1997 | Alteration to Existing Building | TELECOMMUNICATIONS | — | Closed |
The 23 most recent of 23 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.