Street · 4421 of 8,516 by permit count
Building permits on Arbor Dell Rd, Etobicoke
The City of Toronto has 30 building permits on record for Arbor Dell Rd in Etobicoke, going back to 2004. Declared construction value totals $2.6M. Half of the 30 permits issued here came through within 51 days of the application. The most recent permit was issued Apr 12, 2022 at 9-15 ARBOR DELL RD.
- Permits on record
- 302004–2022
- Declared construction value
- $2.6Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 51 days24 days slower than the city
Permits issued per year
Most common work
Structures worked on
Postal areas
Other streets in M9W
Looking for one address on Arbor Dell Rd? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Apr 12, 2022 | Other(PS) | Proposal to replace the existing sanitary lines within the dwellings - UNITS 9, 10, 11, 12, and 15 | $192K | Closed |
| Apr 12, 2022 | Other(PS) | Proposal to replace the existing sanitary lines within the dwellings - UNITS 1, 3, 5, 6 7 and 8 | $192K | Closed |
| Sep 8, 2020 | Piping: Other Buildings | Replacing three kitchen sanitary lines on the first floor and adding floor drains in basement | $45K | Open |
| Oct 17, 2019 | Balcony/Guard Repairs | Proposed replacement/repair of 58 balconies for an existing 2-storey apartment building. | $620K | Closed |
| Jul 26, 2019 | Alter: Boiler/Furnace/AC Replacement | Proposal to replace the boiler in an existing apartment building. | $180K | Open |
| Nov 6, 2018 | Balcony/Guard Repairs | Proposed balcony repairs at Unit 12. | $60K | Closed |
| Nov 6, 2018 | Balcony/Guard Repairs | Balcony repairs at Unit 12 and 16. | $60K | Closed |
| Aug 16, 2018 | Backflow Prevention Devices (Water only) | Replace existing 1 1/2" DCVA with new device | $10K | Closed |
| Apr 6, 2018 | Fire Alarm | Proposal to install a new FACP at the ground floor entrance of apartment buildings. | $250K | Closed |
| Mar 22, 2018 | Fire Alarm | Proposal to install a new FACP at the ground floor entrance of 8 existing seniors apartment buildings. | $250K | Closed |
| Dec 21, 2015 | Piping: Other Buildings | re route hydronic piping and domestic water service | $80K | Open |
| Dec 21, 2015 | Other(MS) | re route hydronic piping and domestic water service | $80K | Open |
| Jun 21, 2013 | HVAC: Other Group C Buildings | New HVAC System to an existing Apartment Buliding. | $200K | Closed |
| Jun 21, 2013 | HVAC: Other Group C Buildings | New HVAC System to an existing Apartment Buliding. | $200K | Closed |
| Jul 6, 2012 | HVAC: Other Group C Buildings | Revision 01: Conversion of heating to include 6 more units( 16 intotal when project finished).(Conversion of heating system from water boiler to gas for a total of (10) units on the ground and second floors, Units 1, 5 - 9, and 13 - 16) | — | Open |
| Jun 14, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device. | $5K | Closed |
| Jun 14, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device. | $5K | Closed |
| Jun 14, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device. | $5K | Closed |
| Jun 14, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device. | $5K | Closed |
| Jun 14, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device. | $5K | Closed |
| Jun 14, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device. | $5K | Closed |
| Jun 13, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device. | $5K | Closed |
| Jun 13, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device. | $5K | Closed |
| Jun 13, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device. | $5K | Closed |
| Jun 13, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device. | $5K | Closed |
| Jun 13, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device. | $5K | Closed |
| Jun 12, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device. | $5K | Closed |
| May 28, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device. | $5K | Closed |
| May 28, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device. | $5K | Closed |
| Nov 3, 2004 | Site Service | Water Main upgrade/replacement for buildings 9,10,11,12,14,15 at Westacres | $100K | Closed |
The 30 most recent of 30 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Arbor Dell Rd with a permit on record · 15
- 1 Arbor Dell Rd7 permits · to 2022
- 2 Arbor Dell Rd7 permits · to 2022
- 3 Arbor Dell Rd8 permits · to 2022
- 4 Arbor Dell Rd7 permits · to 2022
- 5 Arbor Dell Rd7 permits · to 2022
- 6 Arbor Dell Rd7 permits · to 2022
- 7 Arbor Dell Rd7 permits · to 2022
- 8 Arbor Dell Rd8 permits · to 2022
- 9 Arbor Dell Rd6 permits · to 2022
- 10 Arbor Dell Rd5 permits · to 2022
- 11 Arbor Dell Rd6 permits · to 2022
- 12 Arbor Dell Rd5 permits · to 2022
- 13 Arbor Dell Rd4 permits · to 2022
- 14 Arbor Dell Rd6 permits · to 2022
- 15 Arbor Dell Rd6 permits · to 2022