Type of work · 83 of 103 by permit count
HVAC: Other Group C Buildings permits in Toronto
The City of Toronto has 208 hvac: other group c buildings permits on record for Toronto, going back to 2001. Declared construction value totals $63.6M. The most recent permit was issued Sep 10, 2026 at 575 Adelaide St W.
- Permits on record
- 2082001–2026
- Declared construction value
- $63.6Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20012026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Sep 10, 2026 | 575 Adelaide St W | HVAC: Other Group C Buildings | Proposal for replacement of the existing make-up air unit on the roof with a similar-sized unit, replacement of the garbage room and electrical room exhaust fans with similar-sized units, and replacement of two vestibule pressurization fans with similar-sized units. | $400K | Open |
| Aug 27, 2026 | 316 Brunswick Ave | HVAC: Other Group C Buildings | Proposal to replace aging electric heating system with new mini-split system to provide heating and cooling. | $30K | Open |
| Aug 21, 2026 | 620 Dundas St E | HVAC: Other Group C Buildings | The installation of two 5500 MBH condensing gas-fired boilers, one 1500 ton chiller and cooling towers, and ancillary equipment in the penthouse mechanical room. Additionally, the installation of pressure break heat exchangers in the P1 level, as well as distribution pumps and piping to interconnect | — | Open |
| Jul 24, 2026 | 49 Thorncliffe Park Dr | HVAC: Other Group C Buildings | Proposed construction of a new boiler plant within the existing mechanical room. As part of the project, new boiler exhaust venting will be routed vertically through the parking garage and discharged at ground level. Coring work will be required through the parking garage roof slab to accommodate th | $1.2M | Open |
| Jul 9, 2026 | 2 Basking Ridge | HVAC: Other Group C Buildings | Proposal for alterations to exhaust system in suites 205, 206, 305, 307. | $4K | Open |
| May 4, 2026 | 494 Huron St | HVAC: Other Group C Buildings | Proposal for HVAC upgrade, replacement of hydronic heating system, ameliorated ventilation | $250K | Open |
| May 4, 2026 | 34-36 ROSECLIFFE AVE | HVAC: Other Group C Buildings | Proposal for bathroom interior alterations HVAC drawings. | $100K | Open |
| Apr 30, 2026 | 960 St Clair Ave W | HVAC: Other Group C Buildings | Proposal for modification to existing HVAC ducting with returns and supply grilles. | $15K | Open |
| Mar 31, 2026 | 411 Duplex Ave | HVAC: Other Group C Buildings | Proposal to Installation of a new Split Unit System for all the Suites in the Building to replace the in-floor radiant heating | $4.0M | Open |
| Jan 12, 2026 | 6 Hoskin Ave | HVAC: Other Group C Buildings | Proposal for Revised connections of kitchen exhaust ecology units (ECU-01A / ECU-01B) to have two separate inlet connections and two separate outlet connections. | $1K | Closed |
| Jan 9, 2026 | 1884 Davenport Rd | HVAC: Other Group C Buildings | REV 01:Fire dampers are no longer to be replaced. They shall be serviced and provided with new fusible links. They will also be operated for shutter performance and repaired if required. Proposal for a make-up air unit 12/0 | — | Open |
| Dec 29, 2025 | 200 Victoria St | HVAC: Other Group C Buildings | Proposal to remove 2 Fluid Coolers, and replace with 4 Fluid Coolers, Heat Exchangers, Pumps, Expansion Tanks | $4.5M | Open |
| Dec 15, 2025 | 18 Fourteenth St | HVAC: Other Group C Buildings | Proposal to install HRV system throughout existing apartment building. | $10K | Closed |
| Aug 25, 2025 | 30 Livonia Pl | HVAC: Other Group C Buildings | - Replacement of 3 MUA units on roof (4000 cfm with glycol coil) and air-source heat pump (lifted by crane)- Glycol network expansion in mechanical room on roof.- Work on roof: demolition, plumbing, ductwork, insulation, roofing, electrical, control, crane- Work in rooftop mechanical room: light dem | $1.1M | Closed |
| Jun 20, 2025 | 2050 Avenue Rd | HVAC: Other Group C Buildings | Proposal to install a kitchen exhaust system within restaurant space. | $25K | Closed |
| Apr 30, 2025 | 33 Empress Ave | HVAC: Other Group C Buildings | Replacing like-for-like roof mounted make-up air units. | $650K | Open |
| Apr 24, 2025 | 75 Dowling Ave | HVAC: Other Group C Buildings | Proposal for a makeup air unit replacement | $505K | Open |
| Apr 16, 2025 | 102 Tyndall Ave | HVAC: Other Group C Buildings | Proposal to replace ex gas-fired make-up air unit with new, and associated supply air grilles. Provide new building automation system. Add new dom hw tempering valve | $250K | Open |
| Sep 27, 2024 | 155 Antibes Dr | HVAC: Other Group C Buildings | Mechanical systems replacement | $735K | Closed |
| Sep 13, 2024 | 731 Runnymede Rd | HVAC: Other Group C Buildings | Proposal for ventilation system upgrades for shower room | $100K | Open |
| May 9, 2024 | 2900 Yonge St | HVAC: Other Group C Buildings | Interior renovation of condo unit including alterations to plumbing and HVAC only | — | Open |
| Nov 28, 2023 | 65 Raglan Ave | HVAC: Other Group C Buildings | Proposed: Standalone Geothermal Permit in association with 22-147261 | $10.0M | Open |
| Nov 13, 2023 | 893 Bloor St W | HVAC: Other Group C Buildings | REV01 - revision to the HVAC system designProposed HVAC alterations to multiple use building | — | Open |
| Oct 10, 2023 | 436B Markham St | HVAC: Other Group C Buildings | Proposal to install new heating system on ground floor and basement. | $12K | Closed |
| Sep 28, 2023 | 300-304 THE EAST MALL | HVAC: Other Group C Buildings | Proposed: Standalone Geothermal Permit in association with 21-193930 (300-304 THE EAST MALL- EAST TOWER D -PHASE 1)and 21-243797 (300-304 THE EAST MALL - WEST TOWER A-PHASE 1) | $50K | Open |
| Sep 15, 2023 | 1950 Kennedy Rd | HVAC: Other Group C Buildings | Proposed installation of new HVAC system for the Recreational Room. | $10K | Open |
| Aug 21, 2023 | 496 Carlaw Ave | HVAC: Other Group C Buildings | PROPOSED: Removal of old, out-dated single heating/cooling system and ducts. Provide new heating, cooling system, separated between commercial and residential uses. Replace existing ductwork (all existing ducts to second level apartment can be accessed from retail areas below) | $55K | Closed |
| Jun 22, 2023 | 6201-6255 BATHURST ST | HVAC: Other Group C Buildings | Supply and install (2) replacement HVAC roof top units | $47K | Closed |
| May 12, 2023 | 805 Dovercourt Rd | HVAC: Other Group C Buildings | propose to replace existing system into rooft top unit | $150K | Closed |
| May 11, 2023 | 170 Galloway Rd | HVAC: Other Group C Buildings | Proposal to provide and Install new one (1) 4 Ton AHU to serve office and recreation room and increased performance, heating/cooling of space, new ventilation air and long¿term reliability. | $135K | Open |
| Apr 24, 2023 | 72 Fulton Ave | HVAC: Other Group C Buildings | ALL NEW HVAC (stand alone) - existing property | — | Open |
| Mar 1, 2023 | 140 The Esplanade | HVAC: Other Group C Buildings | Replacement of 2 makeup air units all located on the roof. New exterior ductwork including carbonmonoxide detectors. New GFI receptacle per makeup air unit. Replacement of all supply grillesincluding balancing dampers. Cleaning on existing supply air and exhaust air ductwork. | $310K | Open |
| Mar 1, 2023 | 80 Danforth Ave | HVAC: Other Group C Buildings | Replacement of 2 makeup air units located on roof. New exterior ductwork including carbon monoxide detectors. New GFI receptacle per makeup air unit. Replacement of all supply grilles including balancing dampers. Cleaning on existing supply air and exhaust air ductwork. | $170K | Open |
| Mar 1, 2023 | 28 Broadway Ave | HVAC: Other Group C Buildings | Replacement of 2 makeup air units and 4 exhaust fans all located on the roof. New exterior ductworkincluding carbon monoxide detectors. New GFI receptacle per makeup air unit. Replacement of allsupply grilles including balancing dampers. Cleaning on existing supply air and exhaust air ductwork.New b | $230K | Open |
| Feb 22, 2023 | 319 Palmerston Blvd | HVAC: Other Group C Buildings | Addition of in-floor heating in basement and heat pump for ground and 2nd-floor. In addition to work scope associated with #22-203952 | $30K | Open |
| Jan 23, 2023 | 1492 Dundas St E | HVAC: Other Group C Buildings | Proposed HVAC upgrades to basement level. | $10K | Open |
| Jan 13, 2023 | 133 Wilton St | HVAC: Other Group C Buildings | Proposal for HVAC and plumbing work in the existing apartment building. The Work to be performed includes two parts (22 236372 PSA 00 PS):- HVAC: Retrofit of the Ventilation System of the 194 Units of the Complex (Includes installation of new exhaust fans, range hoods and ductwork)- Plumbing: Instal | $2.2M | Closed |
| Dec 12, 2022 | 38 Elm St | HVAC: Other Group C Buildings | Proposed replacement of one cooling tower, one make-up air unit, two air handling units, and two chillers | $2.0M | Open |
| Nov 22, 2022 | 15 Devonshire Pl | HVAC: Other Group C Buildings | Proposed Construction of ground heat exchanger consisting of 60 vertical boreholes. Each borehole to be 182.9m in net depth with 32mm HDPE SDR11 PE4710 pip for a total of 10,974m vertical drilling of piping. Boreholes are connected by 4 pairs of 100mm runout pipes, with 15 boreholes per circuit and | $1.4M | Open |
| Oct 27, 2022 | 1987 Yonge St | HVAC: Other Group C Buildings | Proposed installation of HVAC system for 8 units. Unit 201-204 & 301-304 | $80K | Closed |
The 40 most recent of 208 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.