thepermitmap

Street · 3521 of 8,516 by permit count

Building permits on Vansco Rd, Etobicoke

The City of Toronto has 45 building permits on record for Vansco Rd in Etobicoke, going back to 1998. Declared construction value totals $5.0M. Half of the 42 permits issued here came through within 52 days of the application. The most recent permit was applied for Oct 23, 2026 at 34 Vansco Rd.

Permits on record
451998–2026
Declared construction value
$5.0Mas filed, not adjusted
Homes created
0dwelling units
Homes removed
0net +0
Typical wait
52 days25 days slower than the city

Permits issued per year

20002026 (part year)

Other streets in M8Z

Medulla Ave50 permits
Coney Rd47 permits
San Remo Ter46 permits
Lady Bank Rd44 permits
Bradfield Ave40 permits
Smith Cres40 permits
Zorra St40 permits

Looking for one address on Vansco Rd? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Oct 23, 2026 Interior Alterations Proposal for separation wall to create a dry storage area, minor plumbing modifications to support equipment, electrical rework to facilitate equipment. $500K Open
Jun 25, 2026 Sign Building Permit Related 2 Wall Sign — Closed
Oct 4, 2024 Interior Alterations Proposal to construct structural floor repairs $100K Closed
Sep 20, 2023 Backflow Prevention Devices (Water only) Install RP backflow preventer $6K Open
Sep 1, 2023 Building Permit Related(MS) HVAC - Proposed openings on exterior wall and foundation for mechanical equipment. — Closed
Jun 22, 2023 Other(BA) Proposed openings on exterior wall and foundation for mechanical equipment. $35K Closed
May 8, 2023 Interior Alterations Revision 01: Interior and Structural revisions to create offices and racking system Interior alterations for a new tenant - Unit 300 — Closed
Apr 13, 2023 Building Permit Related(PS) Revision 01; Proposal to revise plumbing.Plumbing - Interior alterations for a new tenant — Closed
Mar 2, 2023 Building Permit Related(MS) Revision 01: revision to mechanicalHVAC - Interior alterations for a new tenant — Closed
Aug 9, 2022 Backflow Prevention Devices (Water only) Replacement of 3/4" backflow preventer $2K Open
Jun 22, 2022 Building Permit Related(PS) Revision 01. Plumbing - iinterior alterations for new tenant — Closed
May 31, 2022 Site Service Proposal to upgrade water service line from 1in to 2in at Industrial Food Manufacturing Building(52 feet / 15.8 meters) $20K Closed
May 19, 2022 Building Permit Related(MS) HVAC - iinterior alterations for new tenant — Closed
Mar 18, 2022 Building Permit Related(PS) Plumbing - Interior alterations for new catering facility "Mintz Catering", new partitions, walk-in coolers, kitchen exhaust, make-up air systems, HVAC system, plumbing fixtures and lines, life safety equipment. — Closed
Mar 18, 2022 Building Permit Related(MS) HVAC - Interior alterations for new catering facility "Mintz Catering", new partitions, walk-in coolers, kitchen exhaust, make-up air systems, HVAC system, plumbing fixtures and lines, life safety equipment. — Closed
Mar 18, 2022 Interior Alterations Interior alterations for new catering facility "Mintz Catering", new partitions, walk-in coolers, kitchen exhaust, make-up air systems, HVAC system, plumbing fixtures and lines, life safety equipment. $750K Closed
Feb 25, 2022 Interior Alterations iinterior alterations for new tenant $3.0M Closed
Dec 6, 2021 Building Permit Related(PS) REVISION - roof drainage for the addition is discharged to grade, See drawing MSK1-Part Floor PlanPlumbing - Construct (1) storey addition and canopy to existing industrial printing plant and warehouse. Interior alterations. Washrooms — Closed
Jul 14, 2021 Sprinklers Proposal to install a CO2 fire suppression system in existing industrial warehouse - Man Roland Printing Press $250K Closed
Jun 2, 2021 Interior Alterations Interior alterations to demo interior partition walls, no structural walls. Future tenant to apply for permit $22K Closed
Sep 28, 2020 Backflow Prevention Devices (Water only) 2 inch backflow preventer replacement $1K Closed
Sep 28, 2020 Sprinklers Proposed installation of two backflow preventers on two separate sprinkler risers, installation of two dust collector sprinkler systems including all duct work, and upgrade to existing west side of the building sprinkler system. $122K Closed
Jun 26, 2017 Backflow Prevention Devices (Water only) Proposal to install a backflow prevention device in an existing office building. $3K Closed
Jun 13, 2017 Back Water Valve (Sewer only) Back Water Valve (Sewer only) — Closed
Nov 20, 2015 Backflow Prevention Devices (Water only) install backflow preventer $2K Closed
Jul 29, 2015 Backflow Prevention Devices (Water only) To install (1) Backflow Prevention Devices (Water only). $2K Closed
Sep 13, 2012 Backflow Prevention Devices (Water only) To install 1 Backflow Prevention Device to an industrial building at ground floor by the water meter room. $2K Closed
Sep 4, 2012 Building Permit Related(MS) HVAC - Construct (1) storey addition and canopy to existing industrial printing plant and warehouse. Interior alterations. Install roof vent. — Closed
Aug 31, 2012 Multiple Projects Construct (1) storey addition and canopy to existing industrial printing plant and warehouse. Interior alterations. $145K Closed
Dec 9, 2011 Backflow Prevention Devices (Water only) Installation of one backflow prevention device (RPP ZONE) for industrial process equipment. $4K Closed
Mar 28, 2011 Backflow Prevention Devices (Water only) Proposed installation of backflow prevention device in existing office and warehouse building. $1K Closed
Feb 19, 2010 Backflow Prevention Devices (Water only) To install two backflow prevention devices. $1K Closed
Feb 19, 2010 Backflow Prevention Devices (Water only) installation of one backflow prevention device $2K Closed
Jan 14, 2010 Backflow Prevention Devices (Water only) installation of two back flow prevention devices $5K Closed
Sep 29, 2008 Multiple Projects Second revision to 08-119224 re; Add 3 skylights. (Addition - enclosure of loading dock, new enlosed entrance, interior alterations to industrial-wood working plant.) — Closed
Sep 19, 2008 Building Permit Related(MS) HVAC - Addition - enclosure of loading dock, new enlosed entrance, interior alterations to industrial-wood working plant. — Closed
Aug 22, 2008 Building Permit Related(PS) Plumbing - Addition - enclosure of loading dock, new enlosed entrance, interior alterations to industrial-wood working plant. — Closed
Feb 16, 2007 Other(PS) To install water line and sump pump for new printing press $12K Closed
Jun 8, 2005 Building Permit Related(MS) HVAC - install 3 new doors, fresh aair opening, blind sump drain, 4 tetention tanks, exhaust fan to existing room of chemical storage for printing company - Interior Alterations — Closed
Jun 8, 2005 Interior Alterations install 3 new doors, fresh air opening, blind sump drain, 4 retention tanks, exhaust fan to existing room of chemical storage for printing company $2K Closed

The 40 most recent of 45 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Vansco Rd with a permit on record · 9

  • 6 Vansco Rd3 permits · to 2022
  • 10 Vansco Rd3 permits · to 2024
  • 12 Vansco Rd2 permits · to 2017
  • 14 Vansco Rd21 permits · to 2026
  • 28 Vansco Rd7 permits · to 2022
  • 30 Vansco Rd1 permit · to 2012
  • 34 Vansco Rd5 permits · to 2026
  • 45 Vansco Rd1 permit · to 2020
  • 55 Vansco Rd2 permits · to 2010
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
45
Data through
2026-10-23
Refresh
Daily from the City
Sheet
STR-547