Street · 2807 of 8,516 by permit count
Building permits on Tuxedo Crt, Scarborough
The City of Toronto has 63 building permits on record for Tuxedo Crt in Scarborough, going back to 1998. Declared construction value totals $11.0M. Half of the 60 permits issued here came through within 31 days of the application. The most recent permit was applied for Oct 1, 2026 at 40 Tuxedo Crt.
- Permits on record
- 631998–2026
- Declared construction value
- $11.0Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 31 days4 days slower than the city
Permits issued per year
Zoning
- Most common zone
- RAC55.6% of permits · by-law 15.20
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 63of 63 on record
The zoning categories the permits on Tuxedo Crt fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M1G
Looking for one address on Tuxedo Crt? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 1, 2026 | Garage Repair/Reconstruction | Proposal for existing P1 underground parking garage structural restoration. | $650K | Open |
| Jul 28, 2026 | Other(MS) | Garage exhust system installation | $45K | Open |
| Jun 3, 2026 | Interior Alterations | Proposal for make-up air unit replacement | $350K | Open |
| Jun 3, 2026 | Building Permit Related(MS) | HVAC - Proposal for make-up air unit replacement | — | Open |
| Nov 14, 2025 | Interior Alterations | Alterations to relocate entrances to the laundry rooms on floors 3-14 and modify security hardware for two existing doors at the ground floor. | $250K | Open |
| Nov 13, 2025 | Alter: Boiler/Furnace/AC Replacement | Proposal for boiler replacement | $800K | Open |
| May 30, 2024 | Other(BA) | ADDITIONAL DEVICES IN CORRIDORS | $52K | Closed |
| Jul 25, 2022 | Fire Alarm | REPLACEMENT OF EXISITNG FIRE ALARM CONTROL PANEL | $100K | Open |
| May 27, 2022 | Interior Alterations | interior alterations to 16th floor mechanical room for new electrical feeders | $230K | Open |
| Dec 14, 2021 | Balcony/Guard Repairs | Balcony slab concrete repairs and balcony guards to be replaced to existing building | $644K | Closed |
| Jul 15, 2021 | Sign Building Permit Related | To erect andi display two illuminated ground signs*** TIM HORTON*** | — | Closed |
| May 11, 2021 | Other(FS) | Proposal for the replacement of the fire pump | $25K | Closed |
| Aug 25, 2020 | Other(MS) | Replacement of a existing diesel emergency generator for a natural gas emergency generator for existing apartment building | $300K | Closed |
| Apr 28, 2020 | Interior Alterations | Rev 01: Proposed revision to add ramps to existing doors as per bubbled drawingsINTERIOR ALTERATIONS RECREATION/PARTY HALL | — | Closed |
| Mar 13, 2020 | Building Permit Related(MS) | HVAC - Proposal for the installation of a combined heat and power unit on the roof and modifications to the existing heating and domestic hot water networks to reject its heat in the building. | — | Closed |
| Mar 13, 2020 | Other(BA) | Proposal for the installation of a combined heat and power unit on the roof and modifications to the existing heating and domestic hot water networks to reject its heat in the building. | $500K | Closed |
| Jul 2, 2019 | Fire Alarm | Proposal to replace the fire alarm control panel | $50K | Closed |
| Jul 2, 2019 | Fire Alarm | Proposal to replace the fire alarm control panel | $50K | Closed |
| Sep 27, 2018 | Re-Roofing/Re-Cladding | Proposal for exterior re-cladding, stain and paint to existing restaurant. Tim Hortons #103667 | $70K | Closed |
| Apr 26, 2017 | Other(BA) | isolated roof slab and roof parapet wall repairs | $250K | Closed |
| Apr 11, 2017 | Window Replacement | Proposal to replace all (570) windows in existing apartment building. | $1.0M | Open |
| Sep 20, 2016 | Building Permit Related(PS) | Plumbing - ADD NEW CONCRETE RAMP & STAIR, CANOPY TO EXTERIOR FRONT ELEVATION, INTERIOR ALTERATIONS AT REAR ENTRANCE, LOBBY, LAUNDRY ROOMS, 16FLR W/C & KITCHENETTE | — | Closed |
| Sep 20, 2016 | Building Permit Related(MS) | HVAC - ADD NEW CONCRETE RAMP & STAIR, CANOPY TO EXTERIOR FRONT ELEVATION, INTERIOR ALTERATIONS AT REAR ENTRANCE, LOBBY, LAUNDRY ROOMS, 16FLR W/C & KITCHENETTE | — | Closed |
| Aug 24, 2016 | Multiple Projects | ADD NEW CONCRETE RAMP & STAIR, CANOPY TO EXTERIOR FRONT ELEVATION, INTERIOR ALTERATIONS AT REAR ENTRANCE, LOBBY, LAUNDRY ROOMS, 16FLR W/C & KITCHENETTE | $100K | Closed |
| Aug 5, 2016 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - ADD NEW CONCRETE RAMP & STAIR, CANOPY TO EXTERIOR FRONT ELEVATION, INTERIOR ALTERATIONS AT REAR ENTRANCE, LOBBY, LAUNDRY ROOMS, 16FLR W/C & KITCHENETTE | — | Open |
| Mar 1, 2016 | Fire Alarm | Retrofit of existing fire alarm- detection devices and new signaling devices. | $250K | Open |
| Aug 27, 2015 | Garage Repair/Reconstruction | Localized concrete repairs to roof slab of parking garage - South Side | $600K | Closed |
| Apr 20, 2015 | Backflow Prevention Devices (Water only) | Proposal to install a back flow prevention device in the basement of the existing apartment building. | $5K | Closed |
| Apr 20, 2015 | Backflow Prevention Devices (Water only) | Proposal to install a back flow prevention device in the basement of the existing apartment building. | $5K | Closed |
| Dec 9, 2014 | Backflow Prevention Devices (Water only) | Proposal to install 1 premise isolation backflow preventor in existing apartment, | $10K | Closed |
| Dec 9, 2014 | Backflow Prevention Devices (Water only) | Proposal to install 1 premise isolation backflow preventor in existing apartment. | $10K | Closed |
| Oct 29, 2014 | Garage Repair/Reconstruction | concrete slab repair in parking garage | $400K | Closed |
| Oct 27, 2014 | Solar Collector | Construction of rooftop solar PV modules | $225K | Closed |
| Oct 17, 2014 | Solar Collector | Construction of roof top solar PV modules | $270K | Closed |
| Jul 31, 2014 | Balcony/Guard Repairs | repair 56 balconies | $440K | Closed |
| May 27, 2014 | Garage Repair/Reconstruction | 300m2 of roof slab repair to 1 storey underground parking garage. | $250K | Closed |
| May 27, 2014 | Garage Repair/Reconstruction | 200m2 of roof slab repair to 1 storey underground parking garage. | $220K | Closed |
| Feb 27, 2014 | Sign Building Permit Related | To erect and display two drive-thru ground signs.**Tim Hortons** | — | Closed |
| Sep 27, 2013 | Solar Collector | Installation of solar panels on roof | $720K | Closed |
| Sep 12, 2013 | Site Service | Watermain Re-route and replacement, and one backflow preventor device. | $100K | Closed |
The 40 most recent of 63 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Tuxedo Crt with a permit on record · 7
- 10 Tuxedo Crt5 permits · to 2015
- 20 Tuxedo Crt10 permits · to 2026
- 30 Tuxedo Crt5 permits · to 2022
- 40 Tuxedo Crt14 permits · to 2026
- 42 Tuxedo Crt1 permit · to 2014
- 50 Tuxedo Crt20 permits · to 2026
- 60 Tuxedo Crt8 permits · to 2021