Street · 2911 of 8,516 by permit count
Building permits on Talbot Rd, North York
The City of Toronto has 60 building permits on record for Talbot Rd in North York, going back to 1995. Those permits created 5 homes and removed 4, a net change of +1. Declared construction value totals $3.1M. Half of the 55 permits issued here came through within 20 days of the application. The most recent permit was issued Sep 25, 2026 at 42 Talbot Rd.
- Permits on record
- 601995–2026
- Declared construction value
- $3.1Mas filed, not adjusted
- Homes created
- 5dwelling units
- Homes removed
- 4net +1
- Typical wait
- 20 days7 days faster than the city
Permits issued per year
Zoning
- Most common zone
- RD100.0% of permits · by-law 10.20
- In detached-house zones
- 100.0%62.0% above the city’s 38.0%
- Permits with a zone
- 54of 60 on record
The zoning categories the permits on Talbot Rd fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Where this street runs
Other streets in M2M
Looking for one address on Talbot Rd? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 25, 2026 | Deck | Proposed new deck at rear yard with 7 stairs | $1K | Open |
| Aug 11, 2026 | Deck | New deck construction with glass railing | $20K | Closed |
| Jan 21, 2026 | Deck | Permit update for existing conditions only - no new construction, expansion, or structural modification is proposed. | — | Closed |
| Dec 30, 2021 | Second Suite (New) | Revision - new master ensuite washroom to the main floor plan, new LVL to the mainfloor plan, added storage area in basement | — | Open |
| Oct 25, 2021 | Building Permit Related(PS) | Plumbing - Proposed for separate accessory basement from the existing side entrance with consideration of the safety design. | — | Open |
| Oct 25, 2021 | Building Permit Related (DR) | Drain - Proposed for separate accessory basement from the existing side entrance with consideration of the safety design. | — | Open |
| Aug 27, 2021 | Multiple Projects | Proposal to finish the basement to create a secondary suite and construct a rear walkout | $12K | Open |
| Aug 25, 2021 | Building Permit Related(MS) | HVAC - Proposed for separate accessory basement from the existing side entrance with consideration of the safety design. | — | Open |
| Sep 25, 2019 | Walk-Out Stair | Construct new basement walkout, convert an existing window to a door (not other work) | $15K | Closed |
| Oct 17, 2018 | Demolition | demo sfd | — | Demolition |
| Oct 17, 2018 | New Building | construct new sfd | $600K | New build |
| Oct 17, 2018 | Building Permit Related(MS) | HVAC - construct new sfd | — | Closed |
| Jul 18, 2018 | Addition(s) | Proposal to construct second storey addition. | $98K | Open |
| Apr 19, 2018 | Walk-Out Stair | Proposed walkout stairs towards the rear yard. Existing basement unfinished. | $20K | Closed |
| Dec 19, 2016 | Other(SR) | install rooftop solar collector | $32K | Closed |
| Nov 18, 2016 | Accessory Building(s) | Proposal to construct a new carport | $10K | Closed |
| Mar 20, 2015 | Multiple Projects | INTERIOR ALTERATIONS TO EXISTING DWELLING, ADDED BATHROOM, MOVED KITCHEN, ADDED COVERED DECK ON FRONT OF DWELLING. | $10K | Closed |
| Mar 20, 2015 | Building Permit Related(PS) | Plumbing - INTERIOR ALTERATIONS TO EXISTING DWELLING, ADDED BATHROOM, MOVED KITCHEN, ADDED COVERED DECK ON FRONT OF DWELLING. | — | Open |
| Nov 6, 2014 | Back Water Valve (Sewer only) | Installation of one mainline fullport backwater valve. | — | Closed |
| Jul 16, 2014 | MGO Remediation | MGO remediation | — | Closed |
| Jan 2, 2013 | Other(PS) | Full port main water backwater valve | $2K | Closed |
| Dec 5, 2012 | HVAC: SFD/Semi/TH | Convert from electric base board heaters to gas | $10K | Closed |
| Dec 3, 2012 | Interior Alterations | Convert garage to a recreation room in the basement | $10K | Closed |
| Sep 17, 2012 | New Building | Revised interior layout | — | New build |
| Nov 15, 2011 | Demolition | Demolition of a single family dwelling. | — | Demolition |
| Nov 15, 2011 | Building Permit Related (DR) | Drain - Two storey dwelling with attached garage. | — | Closed |
| Nov 15, 2011 | Building Permit Related(PS) | Plumbing - Two storey dwelling with attached garage. | — | Closed |
| Nov 15, 2011 | Building Permit Related(MS) | HVAC - Two storey dwelling with attached garage. | — | Closed |
| Nov 15, 2011 | New Building | Two storey dwelling with attached garage. | $550K | New build |
| Aug 15, 2011 | Building Permit Related (DR) | Drain - Two storey dwelling with attached garage | — | Closed |
| Aug 15, 2011 | Building Permit Related(PS) | Plumbing - Two storey dwelling with attached garage | — | Closed |
| Jun 22, 2011 | Building Permit Related(MS) | HVAC - Two storey dwelling with attached garage | — | Closed |
| Jun 3, 2011 | Demolition | Demolish one storey dwelling | — | Demolition |
| Nov 9, 2010 | Demolition | Demo existing | — | Demolition |
| Nov 9, 2010 | Building Permit Related(PS) | Plumbing - Construct a new two storey | — | Closed |
| Nov 9, 2010 | Building Permit Related(MS) | HVAC - Construct a new two storey | — | Closed |
| Nov 9, 2010 | Building Permit Related (DR) | Drain - Construct a new two storey | — | Closed |
| Nov 9, 2010 | New Building | Construct a new two storey with unfinished basement.. | $500K | New build |
| Nov 7, 2008 | Deck | new rear deck less than 1m from grade | $2K | Closed |
| Aug 22, 2008 | Demolition | 1 1/2-storey dwelling | — | Demolition |
The 40 most recent of 60 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Talbot Rd with a permit on record · 21
- 6 Talbot Rd5 permits · to 2008
- 10 Talbot Rd5 permits · to 2011
- 12 Talbot Rd5 permits · to 2010
- 29 Talbot Rd1 permit · to 1995
- 30 Talbot Rd1 permit · to 2001
- 31 Talbot Rd5 permits · to 2004
- 32 Talbot Rd1 permit · to 2001
- 35 Talbot Rd4 permits · to 2021
- 36 Talbot Rd1 permit · to 2014
- 39 Talbot Rd1 permit · to 2008
- 42 Talbot Rd3 permits · to 2026
- 44 Talbot Rd5 permits · to 2012
- 48 Talbot Rd7 permits · to 2003
- 61 Talbot Rd4 permits · to 2019
- 68 Talbot Rd1 permit · to 2018
- 74 Talbot Rd2 permits · to 2015
- 76 Talbot Rd1 permit · to 2014
- 80 Talbot Rd4 permits · to 2016
- 105 Talbot Rd1 permit · to 2016
- 114 Talbot Rd1 permit · to 2006
- 115 Talbot Rd2 permits · to 2021