Neighbourhood · 46 of 158 by permit count
Building permits in Newtonbrook West
The City of Toronto has 6,918 building permits on record for the Newtonbrook West neighbourhood, going back to 1985. Those permits created 3,595 homes and removed 371, a net change of +3,224. Declared construction value totals $2.3B. Half of the 6,350 permits issued here came through within 31 days of the application. The most recent permit was issued Oct 30, 2026 at 269 Moore Park Ave.
- Permits on record
- 6,9181985–2026
- Declared construction value
- $2.3Bas filed, not adjusted
- Homes created
- 3,595dwelling units
- Homes removed
- 371net +3,224
- Typical wait
- 31 days4 days slower than the city
Permits issued per year
Zoning
- Most common zone
- RD80.5% of permits · by-law 10.20
- In detached-house zones
- 80.5%42.6% above the city’s 38.0%
- Permits with a zone
- 4,729of 6,918 on record
The zoning categories the permits in Newtonbrook West fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Minor variances at the Committee of Adjustment
- Applications on record
- 324since 2016
- Approved
- 81.4%9.4% below the city · 280 decided
- Median time to a decision
- 91 days29 days faster than the city
Some projects in Newtonbrook West need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. Back to back, that is about 122 days, not the 31 days the permit figure alone suggests. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Oct 30, 2026 | 269 Moore Park Ave | Back Water Valve (Sewer only) | Proposed Back Water Valve | — | Open |
| Oct 30, 2026 | 238 Hendon Ave | Back Water Valve (Sewer only) | back water valve installation | — | Open |
| Oct 29, 2026 | 260 Connaught Ave | New Building | Proposed new fourplex dwelling | $1.6M | New build |
| Oct 29, 2026 | 260 Connaught Ave | Building Permit Related(MS) | HVAC - Proposed new fourplex dwelling | — | Open |
| Oct 29, 2026 | 260 Connaught Ave | Building Permit Related (DR) | Drain - Proposal to construct a two-storey garden suite.See also 26-163522 ZAP 00 ZR | — | Open |
| Oct 29, 2026 | 133 Moore Park Ave | New Building | Revision 1: Change the interior layout for the proposed fourplexProposal for a 3-storey fourplex dwelling with a finished basment. The existing house and attached garage on site. | — | New build |
| Oct 29, 2026 | 260 Connaught Ave | Building Permit Related (DR) | Drain - Proposed new fourplex dwelling | — | Open |
| Oct 29, 2026 | 260 Connaught Ave | Building Permit Related(PS) | Plumbing - Proposed new fourplex dwelling | — | Open |
| Oct 29, 2026 | 260 Connaught Ave | Building Permit Related(MS) | HVAC - Proposal to construct a two-storey garden suite.See also 26-163522 ZAP 00 ZR | — | Open |
| Oct 29, 2026 | 260 Connaught Ave | Demolition | Proposed to demolish existing 1-storey dwelling and construct a new fourplex dwelling | — | Demolition |
| Oct 28, 2026 | 260 Connaught Ave | New Laneway / Rear Yard Suite | Proposal to construct a two-storey garden suite.See also 26-163522 ZAP 00 ZR | $600K | Open |
| Oct 26, 2026 | 160 Pleasant Ave | New Laneway / Rear Yard Suite | Proposal for a garden suite with a garage on the main level | $20K | Open |
| Oct 26, 2026 | 97 Drewry Ave | Second Suite (New) | Proposed basement apartment | $30K | Open |
| Oct 23, 2026 | 50 Altamont Rd | Building Permit Related(PS) | Plumbing - Proposal to demolish existing SFD to construct new three storey detached houseplex (4 units) | — | Open |
| Oct 23, 2026 | 5650 Yonge St | Interior Alterations | Proposal of interior alterations of existing office spaces. | $1K | Open |
| Oct 23, 2026 | 50 Altamont Rd | Building Permit Related (DR) | Drain - Proposal to demolish existing SFD to construct new three storey detached houseplex (4 units) | — | Open |
| Oct 23, 2026 | 12 Altamont Rd | Back Water Valve (Sewer only) | INSTALL A BACK WATER VALVE AND SUMP PUMP | — | Open |
| Oct 23, 2026 | 87 Connaught Ave | Building Permit Related (DR) | Drain - PROPOSED NEW CONSTRUCTION OF A FOURPLEX DWELLING IN EXISTING PROPERTY | — | Open |
| Oct 23, 2026 | 87 Connaught Ave | Building Permit Related(PS) | Plumbing - PROPOSED NEW CONSTRUCTION OF A FOURPLEX DWELLING IN EXISTING PROPERTY | — | Open |
| Oct 23, 2026 | 87 Connaught Ave | Building Permit Related(MS) | HVAC - PROPOSED NEW CONSTRUCTION OF A FOURPLEX DWELLING IN EXISTING PROPERTY | — | Open |
| Oct 22, 2026 | 41 Hendon Ave | Partial Permit - Shoring | Conditional Permit - Part Permit - Construction of a 35-storey residential rental building with 355 dwelling units, 4.5 levels of underground parking and a mechanical penthouse. | — | Open |
| Oct 21, 2026 | 87 Connaught Ave | Building Permit Related (DR) | Drain - Proposal to construct a new garden suite. | — | Open |
| Oct 21, 2026 | 87 Connaught Ave | Building Permit Related(PS) | Plumbing - Proposal to construct a new garden suite. | — | Open |
| Oct 21, 2026 | 87 Connaught Ave | Building Permit Related(MS) | HVAC - Proposal to construct a new garden suite. | — | Open |
| Oct 21, 2026 | 50 Altamont Rd | Building Permit Related(PS) | Plumbing - Proposal to construct a two storey Garden Suite with one (1) housekeeping unit. | — | Open |
| Oct 21, 2026 | 50 Altamont Rd | Building Permit Related (DR) | Drain - Proposal to construct a two storey Garden Suite with one (1) housekeeping unit. | — | Open |
| Oct 21, 2026 | 221 Patricia Ave | Building Permit Related(MS) | HVAC - Proposed 3 storey for duplex | — | Open |
| Oct 20, 2026 | 26 Ancona St | Building Permit Related(PS) | Plumbing - Proposal for demolishing existing 1 storey detached dwelling and construct a new 3-storey fourplex dwelling | — | Open |
| Oct 20, 2026 | 66 Patricia Ave | New Laneway / Rear Yard Suite | Proposal for a two storey garden suite | $600K | Open |
| Oct 20, 2026 | 87 Connaught Ave | New Laneway / Rear Yard Suite | Proposal to construct a new garden suite. | $400K | Open |
| Oct 20, 2026 | 26 Ancona St | Building Permit Related (DR) | Drain - Proposal for demolishing existing 1 storey detached dwelling and construct a new 3-storey fourplex dwelling | — | Open |
| Oct 20, 2026 | 247 Drewry Ave | Building Permit Related(MS) | HVAC - Proposal to demolish existing 1-storey dwelling and garage and construct a 3-storey fourplex and a garden suite | — | Open |
| Oct 20, 2026 | 207 Connaught Ave | Demolition | Proposal to demolish existing dwelling and construct a new four unit dwelling. | — | Demolition |
| Oct 19, 2026 | 55 Hendon Ave | Back Water Valve (Sewer only) | INSTALL BACK WATER VALVE | — | Open |
| Oct 16, 2026 | 52 Altamont Rd | New Building | Proposed demolishing existing detached SFD and new construction of 3 storey fourplex | $200K | New build |
| Oct 16, 2026 | 52 Altamont Rd | Demolition | Proposed demolishing existing detached SFD and new construction of 3 storey fourplex | — | Demolition |
| Oct 15, 2026 | 1 Dromore Cres | New Laneway / Rear Yard Suite | Proposed 1-stoprey rear yard ADU (Garden Suite)See also 26 165303 ZAP | $100K | Open |
| Oct 15, 2026 | 1 Dromore Cres | Building Permit Related (DR) | Drain - Proposed 1-stoprey rear yard ADU (Garden Suite) | — | Open |
| Oct 15, 2026 | 1 Dromore Cres | Building Permit Related(PS) | Plumbing - Proposed 1-stoprey rear yard ADU (Garden Suite) | — | Open |
| Oct 14, 2026 | 178 Patricia Ave | New Laneway / Rear Yard Suite | REV 01: Revision to permit for the addition of a basement walk outProposal to construct a new 2 storey garden suite in the rear yard of an existing SFD-detached dwelling. | — | Open |
The 40 most recent of 6,918 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.