Street · 2383 of 8,567 by permit count
Building permits on Sudbury St
The City of Toronto has 79 building permits on record for Sudbury St, going back to 1998. Those permits created 711 homes and removed 0, a net change of +711. Declared construction value totals $81.5M. The most recent permit was issued Feb 5, 2026 at 180 Sudbury St.
- Permits on record
- 791998–2026
- Declared construction value
- $81.5Mas filed, not adjusted
- Homes created
- 711dwelling units
- Homes removed
- 0net +711
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Where this street runs
Little Portugal 41 permits
West Queen West 37 permits
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Feb 5, 2026 | Fire Alarm | Addition of new fire alarm devices & control relays for CSA B44 elevator modernization | $54K | Open |
| Dec 30, 2025 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to change shell unit into a proposed art gallery. Unit M109. | — | Open |
| Dec 30, 2025 | Interior Alterations | Proposal for interior alterations to change shell unit into a proposed art gallery. Unit M109. | $50K | Open |
| Dec 30, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to change shell unit into a proposed art gallery. Unit M109. | — | Open |
| Dec 24, 2025 | Building Permit Related(MS) | HVAC - Proposal to alter the floor structure to infill the pool. | — | Open |
| Oct 24, 2025 | Other(FS) | Proposal to install a new fire alarm system and control relays for elevatior modernization. | $54K | Closed |
| Aug 7, 2025 | Interior Alterations | Proposal to alter the floor structure to infill the pool. | $50K | Open |
| Jun 17, 2025 | Other(PS) | Proposal to replace kitec plumbing. | $6K | Closed |
| Dec 9, 2022 | Other(PS) | Replacement of insuite kitec domestic piping | $4K | Closed |
| Sep 7, 2022 | Piping: Other Buildings | REPLACEMENT OF IN-SUITE KITEC DOMESTIC WATER PIPING | $5K | Closed |
| Aug 15, 2022 | Electromagnetic Locks | Proposal to install one electromagnetic lock in the existing apartment building. | $5K | Open |
| Feb 17, 2022 | Other(PS) | Proposal to remove and replace the existing kitec plumbing including all existing fixtures. | $20K | Closed |
| Nov 30, 2021 | Demolition | Demolition of a two-storey building to the topside of the foundation. Disconnection of watermain and sewers at property line. For future pedestrian access tower for King-Liberty SmartTrack Station | — | Demolition |
| Mar 17, 2021 | Other(PS) | Proposal to replace the Kitec water distribution piping in an existing townhouse unit within a larger complex - UNIT 1801 | $9K | Closed |
| Dec 8, 2020 | Fire Damage | STRUCTURAL REPAIRS TO ROOF TOP TERRANCE AND INTERIOR DRYWALL FINISHES, VAPOUR BARRIER AND INSULATION (INCLUDING FIRE SEPARATION THAT WAS REMOVED. ALL BUILDING MATERIAL REPLACEMENT TO MATCH EXISTING IN ACCORDANCE WITH PART 11 OF OBC. | — | Closed |
| Dec 8, 2020 | Fire Damage | STRUCTURAL REPAIRS TO ROOF TOP TERRANCE AND INTERIOR DRYWALL FINISHES, VAPOUR BARRIER AND INSULATION (INCLUDING FIRE SEPARATION THAT WAS REMOVED. ALL BUILDING MATERIAL REPLACEMENT TO MATCH EXISTING IN ACCORDANCE WITH PART 11 OF OBC. | — | Open |
| Dec 8, 2020 | Fire Damage | STRUCTURAL REPAIRS TO ROOF TOP TERRANCE AND INTERIOR DRYWALL FINISHES, VAPOUR BARRIER AND INSULATION (INCLUDING FIRE SEPARATION THAT WAS REMOVED. ALL BUILDING MATERIAL REPLACEMENT TO MATCH EXISTING IN ACCORDANCE WITH PART 11 OF OBC. | — | Open |
| Dec 4, 2020 | Fire Damage | STRUCTURAL REPAIRS TO ROOF TOP TERRANCE AND INTERIOR DRYWALL FINISHES, VAPOUR BARRIER AND INSULATION (INCLUDING FIRE SEPARATION THAT WAS REMOVED. ALL BUILDING MATERIAL REPLACEMENT TO MATCH EXISTING IN ACCORDANCE WITH PART 11 OF OBC. | — | Open |
| Aug 13, 2020 | Building Permit Related(PS) | Plumbing - NEW PARTITION WALL CREATING TWO BEDROOMS FROM EXISTING ONE BEDROOM. RENOVATION OF EXISTING MASTER BATHROOM. | — | Closed |
| Aug 10, 2020 | Interior Alterations | NEW PARTITION WALL CREATING TWO BEDROOMS FROM EXISTING ONE BEDROOM. RENOVATION OF EXISTING MASTER BATHROOM. | $40K | Closed |
| Nov 29, 2019 | Piping: Other Buildings | New plumbing layout for an exisitng bathroom - drain added for new shower. | $2K | Closed |
| Aug 12, 2019 | Piping: SFD/Semi | replace kitec watermains with 1" Uponor Pex pipe | $263K | Closed |
| Feb 23, 2018 | Piping: SFD/Semi | Proposal to replace KITEC Piping within townhouse units on properties 1-47 Sudbury Street. | $510K | Open |
| Nov 10, 2017 | Interior Alterations | Interior alterations 1-INTERIOR RENO TO HAIR SALON (Personal Grooming Establishment)2-HVAC PLAN3-PLUMBING-ADD 6 FIXTURES | $40K | Open |
| Nov 9, 2017 | Building Permit Related(PS) | Plumbing - Interior alterations 1-INTERIOR RENO TO HAIR SALON2-HVAC PLAN3-PLUMBING-ADD 6 FIXTURES | — | Open |
| Nov 9, 2017 | Building Permit Related(MS) | HVAC - Interior alterations 1-INTERIOR RENO TO HAIR SALON2-HVAC PLAN3-PLUMBING-ADD 6 FIXTURES | — | Open |
| Aug 24, 2017 | Other(PS) | In suite kitec plumbing replacement. | $5K | Closed |
| Mar 14, 2017 | Temporary Structures | Proposal to erect a temporary structure at the front of exiting commerical building for "House of Vans" event. Mar 28-April 2/2017. | — | Closed |
| Jan 30, 2017 | Building Permit Related(PS) | Plumbing - Construct washroom enlargement on thrid floor | — | Closed |
| Dec 28, 2016 | Interior Alterations | Construct washroom enlargement on thrid floor | $25K | Closed |
| Nov 3, 2016 | Building Permit Related(PS) | Plumbing - Interior alterations to drycleaners - Nicee Drycleaner | — | Closed |
| Nov 3, 2016 | Building Permit Related(MS) | HVAC - Interior alterations to drycleaners - Nicee Drycleaner | — | Closed |
| Oct 26, 2016 | Interior Alterations | Interior alterations to drycleaners - Nicee Drycleaner | $150K | Closed |
| Sep 23, 2015 | Interior Alterations | Proposal to open existing concrete firewall on ground floor and install new vertical platform lift with fire door installed in firewall. | $63K | Open |
| Sep 23, 2015 | Building Permit Related(PS) | Plumbing - Proposal to open existing concrete firewall on ground floor and install new vertical platform lift with fire door installed in firewall. | — | Open |
| Apr 27, 2015 | Backflow Prevention Devices (Water only) | Backflow preventor installation | $15K | Open |
| Sep 9, 2014 | Sprinklers | add sprinkler system to basement, first and second floors | $28K | Closed |
| Dec 19, 2013 | New Building | PHASE 2 - Proposal to construct a 8 sty tower with 135 residential units. See PHASE 1 - 08 183862. | $11.0M | New build |
| Jul 19, 2012 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to add a washroom in the basement of existing SFD-townhouse (unit 2807). | — | Open |
| Jul 19, 2012 | Interior Alterations | Proposal for interior alterations to add a washroom in the basement of existing SFD-townhouse (unit 2807). | $5K | Open |
The 40 most recent of 79 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.