Street · 2386 of 8,567 by permit count
Building permits on Southport St
The City of Toronto has 79 building permits on record for Southport St, going back to 1992. Those permits created 662 homes and removed 0, a net change of +662. Declared construction value totals $41.3M. The most recent permit was applied for Aug 18, 2026 at 60 Southport St.
- Permits on record
- 791992–2026
- Declared construction value
- $41.3Mas filed, not adjusted
- Homes created
- 662dwelling units
- Homes removed
- 0net +662
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 18, 2026 | Balcony/Guard Repairs | RESTORE THE BALCONIES, SEALANTS AND ASSOCIATED EXTERIOR BUILDING COMPONENTS TO A STRUCTURALLY SOUND AND SERVICEABLE CONDITION. | $2.7M | Open |
| Jun 1, 2026 | Building Permit Related(PS) | Plumbing - Construct new tower A, 26 stories with 4 level parking garage below grade | — | Open |
| Jun 1, 2026 | Building Permit Related(MS) | HVAC - Construct new tower A, 26 stories with 4 level parking garage below grade | — | Open |
| Jun 1, 2026 | New Building | Construct new tower A, 27 stories with 3 levels of underground parking, retail at-grade & 345 dwelling units.**** below grade reduced to 3 levels in the latest re-submission drawings of Jan 5th, 2024 shoring permit to be revised - soil report / geohydrology report to be revised **** | — | New build |
| Mar 25, 2026 | Other(BA) | Proposal for entrance exit ramp repair | $200K | Open |
| Nov 27, 2025 | Partial Permit - Foundation | Part Permit - Construct new tower A, 27 stories with 3 levels of underground parking, retail at-grade & 345 dwelling units.**** below grade reduced to 3 levels in the latest re-submission drawings of Jan 5th, 2024 shoring permit to be revised - soil report / geohydrology report to be revised **** | — | Closed |
| Nov 24, 2025 | Unspecified | Deferred Fees from folder 21 238928 (RSN-5025534) ZoningProcess RSN 69470719 | — | Open |
| Oct 20, 2025 | Fire Alarm | Proposal to replace the fire alarm system in an existing apartment building. | $200K | Open |
| Oct 16, 2025 | Inside and Outside Drains | Drain - Construct new tower A, 26 stories with 4 level parking garage below grade | $300K | Open |
| Mar 3, 2025 | Garage Repair/Reconstruction | Proposed rehabilitation of parking garage | $1.0M | Open |
| Jul 31, 2024 | Sign Building Permit Related | 2 SINGLE FACED GROUND SIGNS**20 22 24 SOUTHPORT ST** | — | Closed |
| Jun 14, 2024 | Sign Building Permit Related | 2 GROUND SIGNS **20-22-24 SOUTHPORT ST** | — | Closed |
| May 14, 2024 | Shoring | Proposal for shoring and excavation for the purpose of soil remediation. | $50K | Open |
| Apr 10, 2024 | Alternative Solution | Alternative Solution Application- Waiver of combination smoke/fire dampers in air ducts | — | Closed |
| Aug 5, 2023 | Alternative Solution | Alternative Solution to permit t the use of 65mm standpipe hose valves in exit stairs in lieu of fire hose cabinets containing 65mm and 38mm hose valves with 38mm fire hoses within the floors having Group C (residential), Group D (office) and Group E (retail) occupancies | — | Closed |
| Apr 20, 2023 | Partial Permit - Shoring | Conditional Permit - Part Permit - Construct new tower A, 26 stories with 4 level parking garage below grade | — | Closed |
| Dec 13, 2021 | Site Service | Proposed installation of catch basin in east courtyard. | $40K | Open |
| Dec 3, 2021 | Multiple Projects | Localized repairs to parking garage emergency stairwells including localized concrete replacement, guardrail repairs and door replacement | $200K | Open |
| Nov 17, 2021 | Building Permit Related(MS) | HVAC - Construct new residential condominium tower B, 30 stories | — | Open |
| Nov 17, 2021 | New Building | Construct new residential condominium tower B, 30 stories**** below grade reduced to 3 levels in the latest re-submission drawings of Jan 5th, 2024 shoring permit to be revised - soil report / geohydrology report to be revised **** | $25.0M | New build |
| Nov 17, 2021 | Inside and Outside Drains | Drain - Construct new residential condominium tower B, 30 stories | $200K | Open |
| Nov 17, 2021 | Building Permit Related(PS) | Plumbing - Construct new residential condominium tower B, 30 stories | — | Open |
| Jul 5, 2021 | Sign Building Permit Related | To erect and display one non-illuminated ground sign.*****SOUTHPORT IN SWANSEA***** | — | Closed |
| May 19, 2021 | Site Service | Revision 01 - changes as per highlighted drawings. Class 5 Holding tank is being installed and shall be for temporary use not exceeding 12 months in duration. | — | Closed |
| May 19, 2021 | Sales Pavilions | Construct a temporary condominium sales office | — | Closed |
| May 19, 2021 | Building Permit Related(PS) | Plumbing - Construct a temporary condominium sales office with Class 5 Holding Tank for Sanitary Sewage | — | Closed |
| May 19, 2021 | Building Permit Related(MS) | HVAC - Construct a temporary condominium sales office | — | Closed |
| Feb 17, 2021 | Other(MS) | Replace 2 roof mounted and 1 floor mounted air units | $100K | Closed |
| Jan 5, 2021 | Garage Repair/Reconstruction | Localized slab-on-grade repairs within parking garage, and installation of weeping tile system to address water leakage. | $700K | Closed |
| Sep 25, 2020 | Building Permit Related(PS) | Plumbing - Installation of a backflow preventer related to replacement of 2 roof mounted and 1 floor mounted air units | — | Open |
| Sep 23, 2020 | Interior Alterations | Replace 2 roof mounted and 1 floor mounted air units | $20K | Open |
| Jul 16, 2020 | Other(BA) | Podium deck tennis court rehabilitation | $150K | Closed |
| Feb 13, 2019 | Other(BA) | Proposed hydro vault repair at existing apartment building. | $100K | Closed |
| Feb 12, 2019 | Garage Repair/Reconstruction | Proposal to repair existing asphalt on ramp leading to shared underground parking garage. | $300K | Open |
| Feb 23, 2018 | Garage Repair/Reconstruction | Proposal to construct underground garage repairs. | $500K | Closed |
| Aug 4, 2017 | Electromagnetic Locks | Proposal to install 1 electromagnetic lock to the existing condo building. | $5K | Closed |
| Mar 14, 2017 | Garage Repair/Reconstruction | Garage Repair/Reconstruction at slabs and podium level | $750K | Closed |
| Sep 29, 2016 | Building Permit Related(MS) | HVAC - Proposal for concrete repairs, install structural support steel, remove and replace the mechanical piping and insulation on interior piping, install louvers at wall openings, install motorized dampers, install carbon monoxide system controller and sensors, interconnected to the C.O. system an | — | Open |
| Sep 2, 2016 | Garage Repair/Reconstruction | Proposal for concrete repairs, install structural support steel, remove and replace the mechanical piping and insulation on interior piping, install louvers at wall openings, install motorized dampers, install carbon monoxide system controller and sensors, interconnected to the C.O. system and exhau | $147K | Open |
| Aug 22, 2016 | Garage Repair/Reconstruction | Applicant propose Garage repair on level p1 and p2 of the existing apartment building. | $100K | Closed |
The 40 most recent of 79 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.