Street · 270 of 8,516 by permit count
Building permits on Silver Birch Ave
The City of Toronto has 525 building permits on record for Silver Birch Ave, going back to 1987. Those permits created 18 homes and removed 7, a net change of +11. Declared construction value totals $15.2M. Half of the 500 permits issued here came through within 12 days of the application. The most recent permit was applied for Oct 29, 2026 at 168 Silver Birch Ave.
- Permits on record
- 5251987–2026
- Declared construction value
- $15.2Mas filed, not adjusted
- Homes created
- 18dwelling units
- Homes removed
- 7net +11
- Typical wait
- 12 days15 days faster than the city
Permits issued per year
Zoning
- Most common zone
- R99.0% of permits · by-law 10.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 521of 525 on record
The zoning categories the permits on Silver Birch Ave fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Minor variances at the Committee of Adjustment
- Applications on record
- 30since 2016
- Approved
- 82.8%8.0% below the city · 29 decided
- Median time to a decision
- 194 days74 days slower than the city
Some projects on Silver Birch Ave need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. Back to back, that is about 206 days, not the 12 days the permit figure alone suggests. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Other streets in M4E
Looking for one address on Silver Birch Ave? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 29, 2026 | Underpinning | Proposed underpinning of the existing basement foundation along the front portion of the dwelling. | $150K | Open |
| Oct 29, 2026 | Building Permit Related (DR) | Drain - Proposed underpinning of the existing basement foundation along the front portion of the dwelling. | — | Open |
| Oct 29, 2026 | Building Permit Related(PS) | Plumbing - Proposed underpinning of the existing basement foundation along the front portion of the dwelling. | — | Open |
| Oct 28, 2026 | Building Permit Related (DR) | Drain - Interior alterations, including structural modifications, basement walkout and underpinning | — | Open |
| Oct 28, 2026 | Building Permit Related(PS) | Plumbing - Interior alterations, including structural modifications, basement walkout and underpinning | — | Open |
| Oct 28, 2026 | Multiple Projects | Proposal to alter the existing house by constructing a new 3rd floor, a new 1-storey side addition, alterations to the interior layout and construction of 4 exterior porches. new roof deck, enlarged bay window | $250K | Open |
| Oct 27, 2026 | Building Permit Related(PS) | Plumbing - Proposal to demolish existing garage and construct a new two-storey garden suite.See alsi 26-155978 ZAP 00 ZR & 26-212171 STE 19 MV | — | Open |
| Oct 27, 2026 | Building Permit Related(MS) | HVAC - Proposal to demolish existing garage and construct a new two-storey garden suite.See alsi 26-155978 ZAP 00 ZR & 26-212171 STE 19 MV | — | Open |
| Oct 27, 2026 | New Laneway / Rear Yard Suite | Proposal to demolish existing garage and construct a new two-storey garden suite.See alsi 26-155978 ZAP 00 ZR & 26-212171 STE 19 MV | $500K | Open |
| Oct 27, 2026 | Building Permit Related (DR) | Drain - Proposal to demolish existing garage and construct a new two-storey garden suite.See alsi 26-155978 ZAP 00 ZR & 26-212171 STE 19 MV | — | Open |
| Oct 7, 2026 | Building Permit Related(MS) | HVAC - Proposal to demolish the existing garage and to construct a 2 storey Garden Suite. | — | Open |
| Sep 30, 2026 | New Laneway / Rear Yard Suite | Revision 1 - Reviosn to add 2 skylights and to increase insulation value of exterior walls Proposal to demolish the existing garage and to construct a 2 storey Garden Suite. | — | Open |
| Aug 27, 2026 | Building Permit Related(PS) | Plumbing - Proposal to demolish the existing garage and to construct a 2 storey Garden Suite. | — | Open |
| Aug 27, 2026 | Building Permit Related (DR) | Drain - Proposal to demolish the existing garage and to construct a 2 storey Garden Suite. | — | Open |
| Aug 17, 2026 | Multiple Projects | Interior alterations, including structural modifications, basement walkout and underpinning | $100K | Open |
| Jul 23, 2026 | Demolition | To demolish existing dwelling, sever lot and portion to be added to adjacent properties (see 26-129431 STE 19 CO and 26-129428 STE 19 CO) | — | Demolition |
| Jun 5, 2026 | Multiple Projects | Revision: Front window in addition has been changed along with some of the strutural elements in that area of work | — | Open |
| Jun 4, 2026 | Other(SR) | To demolish existing detached garage and maintain parking space | $5K | Closed |
| Jun 1, 2026 | Deck | Proposed front yard landscaping (retaining walls and stairs) and rear yard deck. | $100K | Open |
| May 19, 2026 | Deck | Front yard landscaping(retaining walls and stairs) and proposed rear yard deck. | $100K | Closed |
| Apr 27, 2026 | Building Permit Related (DR) | Drain - Proposed multiple projects including basement underpinning, interior alterations for new basement layout and closet revision on second-floor. | — | Open |
| Apr 27, 2026 | Multiple Projects | Proposed multiple projects including basement underpinning, interior alterations for new basement layout and closet revision on second-floor. | $50K | Open |
| Apr 22, 2026 | Building Permit Related(MS) | HVAC - Interior Alteration proposed basement underpinning and finished basment, new stairs, new main floor rear door. | — | Open |
| Mar 20, 2026 | Back Water Valve (Sewer only) | Outside Back Water Valve Installation | — | Closed |
| Mar 5, 2026 | Building Permit Related (DR) | Drain - Interior Alteration proposed basement underpinning and finished basment, new stairs, new main floor rear door. | — | Open |
| Feb 9, 2026 | Interior Alterations | Revision: Ground floor rear bedroom and framing | — | Closed |
| Jan 21, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to existing 2-units detached | — | Closed |
| Dec 19, 2025 | Back Water Valve (Sewer only) | Proposed backwater valve install | — | Open |
| Nov 27, 2025 | Multiple Projects | Proposal for load bearing wall modification, relocating stove and new powder room. | $5K | Open |
| Nov 27, 2025 | Building Permit Related(PS) | Plumbing - Proposal for load bearing wall modification, relocating stove and new powder room. | — | Open |
| Nov 19, 2025 | Addition(s) | Proposal for a rear one storey addition. | $50K | Closed |
| Aug 21, 2025 | Building Permit Related(PS) | Revision: scope of work has been increased to include a small front entry addition that encloses a portion of the existing front porch. | — | Open |
| Aug 6, 2025 | Building Permit Related(MS) | HVAC - Proposal for third floor addition, 1 storey front addition for enclosed porch, new front porch, convert existing second floor roof to deck, interior alterations to all floors of existing 2 storey SFD | — | Closed |
| Aug 1, 2025 | Building Permit Related (DR) | Drain - Proposal for third floor addition, 1 storey front addition for enclosed porch, new front porch, convert existing second floor roof to deck, interior alterations to all floors of existing 2 storey SFD | — | Closed |
| Aug 1, 2025 | Building Permit Related(PS) | Plumbing - Proposal for third floor addition, 1 storey front addition for enclosed porch, new front porch, convert existing second floor roof to deck, interior alterations to all floors of existing 2 storey SFD | — | Closed |
| Aug 1, 2025 | Multiple Projects | Proposal for third floor addition, 1 storey front addition for enclosed porch, new front porch, convert existing second floor roof to deck, interior alterations to all floors of existing 2 storey SFD | $500K | Open |
| Jul 2, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to the second floor (bathroom and windows). | — | Open |
| Jul 2, 2025 | Interior Alterations | Proposal for interior alterations to the second floor (bathroom and windows). | $50K | Open |
| May 15, 2025 | Back Water Valve (Sewer only) | Proposal to install a backwater valve. | — | Closed |
| Mar 6, 2025 | Interior Alterations | Proposal to perform interior alterations. | $50K | Closed |
The 40 most recent of 525 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Silver Birch Ave with a permit on record · 152
- 1 Silver Birch Ave4 permits · to 2020
- 2 Silver Birch Ave1 permit · to 2021
- 4 Silver Birch Ave4 permits · to 2015
- 8 Silver Birch Ave6 permits · to 2025
- 9 Silver Birch Ave1 permit · to 2026
- 10 Silver Birch Ave11 permits · to 2022
- 15 Silver Birch Ave9 permits · to 2026
- 16 Silver Birch Ave8 permits · to 2015
- 18 Silver Birch Ave4 permits · to 2006
- 19 Silver Birch Ave3 permits · to 2019
- 20 Silver Birch Ave8 permits · to 2022
- 21 Silver Birch Ave3 permits · to 2012
- 22 Silver Birch Ave4 permits · to 2020
- 24 Silver Birch Ave3 permits · to 2003
- 26 Silver Birch Ave5 permits · to 2011
- 28 Silver Birch Ave1 permit · to 2011
- 30 Silver Birch Ave1 permit · to 2013
- 37 Silver Birch Ave3 permits · to 2005
- 49 Silver Birch Ave7 permits · to 2026
- 51 Silver Birch Ave3 permits · to 1999
- 55 Silver Birch Ave1 permit · to 1998
- 58 Silver Birch Ave3 permits · to 2026
- 60 Silver Birch Ave2 permits · to 2017
- 64 Silver Birch Ave2 permits · to 2014
- 66 Silver Birch Ave4 permits · to 2024
- 70 Silver Birch Ave2 permits · to 2019
- 77 Silver Birch Ave4 permits · to 2011
- 79 Silver Birch Ave5 permits · to 2017
- 83 Silver Birch Ave4 permits · to 2023
- 86 Silver Birch Ave4 permits · to 2025
- 91 Silver Birch Ave6 permits · to 2022
- 93 Silver Birch Ave4 permits · to 2026
- 95 Silver Birch Ave1 permit · to 2005
- 100 Silver Birch Ave4 permits · to 2008
- 103 Silver Birch Ave7 permits · to 2008
- 104 Silver Birch Ave5 permits · to 2026
- 105 Silver Birch Ave2 permits · to 2006
- 106 Silver Birch Ave1 permit · to 2001
- 107 Silver Birch Ave1 permit · to 2015
- 108 Silver Birch Ave5 permits · to 2002
- 111 Silver Birch Ave2 permits · to 2022
- 112 Silver Birch Ave3 permits · to 2011
- 113 Silver Birch Ave1 permit · to 1998
- 115 Silver Birch Ave1 permit · to 2015
- 118 Silver Birch Ave1 permit · to 2003
- 120 Silver Birch Ave3 permits · to 2015
- 121 Silver Birch Ave8 permits · to 2022
- 122 Silver Birch Ave1 permit · to 2013
- 125 Silver Birch Ave3 permits · to 2003
- 126 Silver Birch Ave1 permit · to 2015
- 127 Silver Birch Ave4 permits · to 2023
- 129 Silver Birch Ave3 permits · to 2011
- 131 Silver Birch Ave1 permit · to 2025
- 132 Silver Birch Ave3 permits · to 2026
- 136 Silver Birch Ave9 permits · to 2003
- 138 Silver Birch Ave1 permit · to 2009
- 140 Silver Birch Ave5 permits · to 2020
- 142 Silver Birch Ave2 permits · to 2006
- 143 Silver Birch Ave14 permits · to 2013
- 144 Silver Birch Ave1 permit · to 2006
- 146 Silver Birch Ave10 permits · to 2017
- 147 Silver Birch Ave2 permits · to 2022
- 149 Silver Birch Ave3 permits · to 2022
- 150 Silver Birch Ave4 permits · to 2002
- 153 Silver Birch Ave3 permits · to 2005
- 154 Silver Birch Ave2 permits · to 2000
- 155 Silver Birch Ave1 permit · to 2013
- 157 Silver Birch Ave1 permit · to 2021
- 158 Silver Birch Ave4 permits · to 2021
- 160 Silver Birch Ave3 permits · to 2024
- 162 Silver Birch Ave3 permits · to 2017
- 163 Silver Birch Ave3 permits · to 2001
- 167 Silver Birch Ave8 permits · to 2002
- 168 Silver Birch Ave3 permits · to 2026
- 169 Silver Birch Ave1 permit · to 2018
- 170 Silver Birch Ave3 permits · to 2007
- 172 Silver Birch Ave7 permits · to 2024
- 173 Silver Birch Ave1 permit · to 2019
- 174 Silver Birch Ave2 permits · to 2009
- 181 Silver Birch Ave1 permit · to 2015
- 185 Silver Birch Ave1 permit · to 2019
- 188 Silver Birch Ave2 permits · to 2016
- 190 Silver Birch Ave2 permits · to 2015
- 192 Silver Birch Ave4 permits · to 2014
- 193 Silver Birch Ave5 permits · to 2018
- 194 Silver Birch Ave2 permits · to 2016
- 195 Silver Birch Ave5 permits · to 2018
- 196 Silver Birch Ave4 permits · to 2021
- 199 Silver Birch Ave4 permits · to 2022
- 200 Silver Birch Ave2 permits · to 2014
- 204 Silver Birch Ave3 permits · to 2001
- 205 Silver Birch Ave1 permit · to 2021
- 206 Silver Birch Ave8 permits · to 2025
- 207 Silver Birch Ave1 permit · to 2022
- 210 Silver Birch Ave5 permits · to 2009
- 211 Silver Birch Ave1 permit · to 2001
- 213 Silver Birch Ave5 permits · to 2025
- 217 Silver Birch Ave1 permit · to 2025
- 218 Silver Birch Ave5 permits · to 2014
- 219 Silver Birch Ave8 permits · to 2024
- 220 Silver Birch Ave1 permit · to 2024
- 221 Silver Birch Ave6 permits · to 2016
- 224 Silver Birch Ave5 permits · to 2022
- 225 Silver Birch Ave1 permit · to 2018
- 226 Silver Birch Ave1 permit · to 2014
- 227 Silver Birch Ave1 permit · to 2018
- 228 Silver Birch Ave3 permits · to 2014
- 232 Silver Birch Ave3 permits · to 2018
- 233 Silver Birch Ave2 permits · to 2006
- 237 Silver Birch Ave1 permit · to 2020
- 241 Silver Birch Ave12 permits · to 2016
- 242 Silver Birch Ave2 permits · to 2003
- 244 Silver Birch Ave5 permits · to 2023
- 246 Silver Birch Ave8 permits · to 2023
- 247 Silver Birch Ave2 permits · to 1999
- 249 Silver Birch Ave3 permits · to 2008
- 250 Silver Birch Ave9 permits · to 2020
- 254 Silver Birch Ave7 permits · to 2017
- 255 Silver Birch Ave5 permits · to 2014
- 256 Silver Birch Ave7 permits · to 2021
- 258 Silver Birch Ave2 permits · to 2014
- 259 Silver Birch Ave1 permit · to 2021
- 261 Silver Birch Ave1 permit · to 2025
- 263 Silver Birch Ave3 permits · to 2016
- 265 Silver Birch Ave1 permit · to 2023
- 266 Silver Birch Ave1 permit · to 2016
- 268 Silver Birch Ave1 permit · to 2005
- 269 Silver Birch Ave2 permits · to 2014
- 270 Silver Birch Ave1 permit · to 2016
- 271 Silver Birch Ave2 permits · to 2011
- 273 Silver Birch Ave2 permits · to 2011
- 276 Silver Birch Ave4 permits · to 2020
- 277 Silver Birch Ave7 permits · to 2019
- 279 Silver Birch Ave1 permit · to 2019
- 280 Silver Birch Ave2 permits · to 2023
- 281 Silver Birch Ave2 permits · to 2001
- 282 Silver Birch Ave6 permits · to 2022
- 283 Silver Birch Ave1 permit · to 2026
- 284 Silver Birch Ave1 permit · to 2017
- 285 Silver Birch Ave3 permits · to 2021
- 287 Silver Birch Ave4 permits · to 2012
- 289 Silver Birch Ave6 permits · to 2025
- 293 Silver Birch Ave5 permits · to 2020
- 296 Silver Birch Ave2 permits · to 2023
- 299 Silver Birch Ave1 permit · to 1987
- 301 Silver Birch Ave7 permits · to 2019
- 304 Silver Birch Ave2 permits · to 2015
- 305 Silver Birch Ave1 permit · to 2007
- 306 Silver Birch Ave1 permit · to 2010
- 308 Silver Birch Ave5 permits · to 2024
- 312 Silver Birch Ave2 permits · to 2016
- 313 Silver Birch Ave4 permits · to 2025