Street · 3576 of 8,516 by permit count
Building permits on Sears St
The City of Toronto has 44 building permits on record for Sears St, going back to 1993. Those permits created 20 homes and removed 1, a net change of +19. Declared construction value totals $1.2M. Half of the 44 permits issued here came through within 56 days of the application. The most recent permit was issued Oct 1, 2026 at 137 Sears St.
- Permits on record
- 441993–2026
- Declared construction value
- $1.2Mas filed, not adjusted
- Homes created
- 20dwelling units
- Homes removed
- 1net +19
- Typical wait
- 56 days29 days slower than the city
Permits issued per year
Minor variances at the Committee of Adjustment
- Applications on record
- 20since 2016
Some projects on Sears St need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Other streets in M4L
Looking for one address on Sears St? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 1, 2026 | Fire Alarm | Proposed fire alarm system upgrade | $45K | Open |
| Nov 5, 2021 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to exisitng townhouse | — | Open |
| Nov 5, 2021 | Interior Alterations | Proposal for interior alterations to exisitng townhouse | $50K | Open |
| Aug 18, 2020 | Carport | Propose 1 storey carport structure with rooftop terrace addition to existing 3 storey building. | $75K | Open |
| Mar 2, 2020 | Addition(s) | Proposal for a third floor addition to the existing detached single family dwelling | $80K | Open |
| Mar 2, 2020 | Building Permit Related(MS) | HVAC - Proposal for a third floor addition to the existing detached single family dwelling | — | Open |
| Jan 25, 2018 | Demolition | Proposal to demolish existing single family dwelling-detached (2-storey metal clad building). | — | Demolition |
| Dec 20, 2017 | Demolition | Proposal to demolish 3 existing industrial buildings. Bldg A - 2-storey concrete block building. Bldg B - 1-storey frame insulation. Bldg C - 1-storey metal clad building. | — | Demolition |
| Apr 30, 2013 | Back Water Valve (Sewer only) | Proposal to install back water valve and sump pump in existing detached single family dwelling. | $5K | Closed |
| May 26, 2011 | Other(BA) | Revision to existing building permit - revision to roof structure of existing building permit Proposal to construct a 2nd storey rear deck with partially enclsed sunroom(no plumbing or heating). Note: Application dwgs do not include elevations or floor plans of 1st, 2nd or 3rd floors. | — | Closed |
| Apr 28, 2010 | New Building | Revision to interior layout to all floors for proposed SFD townhouse. | — | New build |
| Apr 28, 2010 | New Building | Revision to interior layout to all floors for proposed SFD townhouse. | — | New build |
| Apr 28, 2010 | New Building | Revision to interior layout to all floors for proposed SFD townhouse. | — | New build |
| Apr 28, 2010 | New Building | Revision to interior layout to all floors for proposed SFD townhouse. | — | New build |
| Apr 28, 2010 | New Building | Revision to interior layout to all floors for proposed SFD townhouse. | — | New build |
| Apr 8, 2010 | Building Permit Related(MS) | Revise HVAC for dwelling. Also see revisions for 101, 103, 105, 107, 109 Sears St. See LEAD FILE 09 165545-01 for drawings. | — | Closed |
| Apr 8, 2010 | Building Permit Related(MS) | Revise HVAC for dwelling. Also see revisions for 101, 103, 105, 107, 109 Sears St. See LEAD FILE 09 165545-01 for drawings. | — | Closed |
| Apr 8, 2010 | Building Permit Related(MS) | Revise HVAC for dwelling. Also see revisions for 101, 103, 105, 107, 109 Sears St. See LEAD FILE 09 165545-01 for drawings. | — | Closed |
| Apr 8, 2010 | Building Permit Related(MS) | Revise HVAC for dwelling. Also see revisions for 101, 103, 105, 107, 109 Sears St. See LEAD FILE 09 165545-01 for drawings. | — | Closed |
| Apr 8, 2010 | Building Permit Related(MS) | LEAD FILE - Revise HVAC for dwelling. Also see revisions for 101, 103, 105, 107, 109 Sears St. | — | Closed |
| Jan 28, 2010 | Building Permit Related(MS) | HVAC - Interior alterations to ground and 2nd floor to convert building back to all residential use, now single family dwelling unit. | — | Closed |
| Jan 14, 2010 | Sprinklers | Sprinklers in connection to BLD 09 165573. | $5K | Closed |
| Jan 14, 2010 | Sprinklers | Sprinklers in connection with BLD 09 165565. | $5K | Closed |
| Jan 14, 2010 | Sprinklers | Sprinklers in connection with BLD 09 165561 | $5K | Closed |
| Jan 14, 2010 | Sprinklers | Sprinklers in connection with 09 165555. | $5K | Closed |
| Jan 14, 2010 | Sprinklers | Sprinklers in connection with BLD 09 165545. | $5K | Closed |
| Nov 4, 2009 | Site Service | Site Servicing in connection to new 5 townhouse development. (See demo 09 165536 and seperate permits for 101, 103, 105, 107, & 109 Sears St., Site Servicing permit under 101 Sears St, and seperate FSU sprinkler permits under each address as required by fire deptarment). | $15K | Closed |
| Oct 30, 2009 | Building Permit Related(PS) | Plumbing - Proposal to construct 5 three storey SFD townhomes. (See demo 09 165536 and seperate permits for 101, 103, 105, 107, & 109 Sears St., Site Servicing permit under 101 Sears St, and seperate FSU sprinkler permits under each address as required by fire deptarment). | — | Closed |
| Oct 30, 2009 | Building Permit Related (DR) | Drain - Proposal to construct 5 three storey SFD townhomes. (See demo 09 165536 and seperate permits for 101, 103, 105, 107, & 109 Sears St., Site Servicing permit under 101 Sears St, and seperate FSU sprinkler permits under each address as required by fire deptarment). | — | Closed |
| Oct 29, 2009 | Building Permit Related(PS) | Plumbing - Proposal to construct 5 three storey SFD townhomes. (See demo 09 165536 and seperate permits for 101, 103, 105, 107, & 109 Sears St., Site Servicing permit under 101 Sears St, and seperate FSU sprinkler permits under each address as required by fire deptarment). | — | Closed |
| Oct 29, 2009 | Building Permit Related (DR) | Drain - Proposal to construct 5 three storey SFD townhomes. (See demo 09 165536 and seperate permits for 101, 103, 105, 107, & 109 Sears St., Site Servicing permit under 101 Sears St, and seperate FSU sprinkler permits under each address as required by fire deptarment). | — | Closed |
| Oct 29, 2009 | Building Permit Related(PS) | Plumbing - Proposal to construct 5 three storey SFD townhomes. (See demo 09 165536 and seperate permits for 101, 103, 105, 107, & 109 Sears St., Site Servicing permit under 101 Sears St, and seperate FSU sprinkler permits under each address as required by fire deptarment). | — | Closed |
| Oct 29, 2009 | Building Permit Related (DR) | Drain - Proposal to construct 5 three storey SFD townhomes. (See demo 09 165536 and seperate permits for 101, 103, 105, 107, & 109 Sears St., Site Servicing permit under 101 Sears St, and seperate FSU sprinkler permits under each address as required by fire deptarment). | — | Closed |
| Oct 29, 2009 | Building Permit Related(PS) | Plumbing - Proposal to construct 5 three storey SFD townhomes. (See demo 09 165536 and seperate permits for 101, 103, 105, 107, & 109 Sears St., Site Servicing permit under 101 Sears St, and seperate FSU sprinkler permits under each address as required by fire deptarment). | — | Closed |
| Oct 29, 2009 | Building Permit Related (DR) | Drain - Proposal to construct 5 three storey SFD townhomes. (See demo 09 165536 and seperate permits for 101, 103, 105, 107, & 109 Sears St., Site Servicing permit under 101 Sears St, and seperate FSU sprinkler permits under each address as required by fire deptarment). | — | Closed |
| Oct 29, 2009 | Building Permit Related(PS) | Plumbing - Proposal to construct 5 three storey SFD townhomes. (See demo 09 165536 and seperate permits for 101, 103, 105, 107, & 109 Sears St., Site Servicing permit under 101 Sears St, and seperate FSU sprinkler permits under each address as required by fire deptarment). | — | Closed |
| Oct 29, 2009 | Building Permit Related (DR) | Drain - Proposal to construct 5 three storey SFD townhomes. (See demo 09 165536 and seperate permits for 101, 103, 105, 107, & 109 Sears St., Site Servicing permit under 101 Sears St, and seperate FSU sprinkler permits under each address as required by fire deptarment). | — | Closed |
| Aug 28, 2009 | Building Permit Related(PS) | Plumbing - Interior alterations to ground and 2nd floor and maintain use as studio & 1 dwelling unit. | — | Closed |
| Aug 28, 2009 | Interior Alterations | Interior alterations to ground and 2nd floor to convert building back to all residential use, now single family dwelling unit. | $100K | Closed |
| Jul 24, 2009 | Backflow Prevention Devices (Water only) | permit for backflow preventor valve for existing apartment building | $2K | Closed |
The 40 most recent of 44 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Sears St with a permit on record · 13
- 101 Sears St6 permits · to 2010
- 103 Sears St5 permits · to 2010
- 105 Sears St5 permits · to 2010
- 107 Sears St5 permits · to 2010
- 109 Sears St5 permits · to 2010
- 126 Sears St7 permits · to 2020
- 127 Sears St1 permit · to 2011
- 130 Sears St1 permit · to 2018
- 132 Sears St1 permit · to 2017
- 137 Sears St4 permits · to 2026
- 139 Sears St1 permit · to 1993
- 143 Sears St1 permit · to 2013
- 154 Sears St2 permits · to 2021