Street · 947 of 8,565 by permit count
Building permits on Pembroke St
The City of Toronto has 194 building permits on record for Pembroke St, going back to 1970. Those permits created 29 homes and removed 0, a net change of +29. Declared construction value totals $9.2M. The most recent permit was applied for Jul 2, 2026 at 93 Pembroke St.
- Permits on record
- 1941970–2026
- Declared construction value
- $9.2Mas filed, not adjusted
- Homes created
- 29dwelling units
- Homes removed
- 0net +29
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jul 2, 2026 | Building Permit Related(MS) | HVAC - Proposal for change of use to convert existing house into a 12 room multi tenant house which includes a third floor addition and interior alterations. | — | Open |
| Jul 2, 2026 | Change of Use | Proposal for change of use to convert existing house into a 12 room multi tenant house which includes a third floor addition and interior alterations. | $150K | Open |
| Jul 2, 2026 | Building Permit Related(PS) | Plumbing - Proposal for change of use to convert existing house into a 12 room multi tenant house which includes a third floor addition and interior alterations. | — | Open |
| Jul 2, 2026 | Other(BA) | PROPOSED REMOVAL AND REPLACEMENT OF ROOFING MEMBRANE ON ALL EXISTING CONCRETE ROOF DECKS (EXISITNG CONCRETE ROOF DECK TO REMAIN) ON ROOFS R6, R7, R17 AND R18. RAAC ROOF PANELS TO BE REMOVED AND REPLACED WITH NEW METAL DECK ON ROOFS R2, R3 WITH NEW ROOF ASSEMBLY AS PER DRAWINGS. | $430K | Open |
| May 28, 2026 | Building Permit Related(PS) | Plumbing - Proposal to renovate existing rooms, provide central HVAC system and new washrooms. | — | Open |
| May 28, 2026 | Multiple Projects | Proposal to renovate existing rooms, provide central HVAC system and new washrooms. | $900K | Open |
| May 28, 2026 | Building Permit Related(MS) | HVAC - Proposal to renovate existing rooms, provide central HVAC system and new washrooms. | — | Open |
| May 27, 2026 | Other(BA) | Proposal for alterations to exterior doors and canopies. | $1K | Open |
| May 27, 2026 | Other(BA) | Proposal to construct pedestrian ramp. | $10K | Open |
| Apr 17, 2026 | Fire Alarm | FIRE ALARM PANEL UPGRADE, INDICATION DEVICE UPGRADES. | $100K | Open |
| Feb 19, 2026 | Interior Alterations | Restoring drywall and fire rating insulation. | $40K | Open |
| Jan 22, 2026 | Interior Alterations | 3rd floor window conversion to provide 2nd means of egress for an existing and proposed 2 units rental building | $35K | Open |
| Sep 5, 2025 | Interior Alterations | OUT OF SCOPE FOR EXPRESS SERVICES - Heritage3rd floor window conversion to provide 2nd means of egress for an existing and proposed 2 units rental building | $35K | Closed |
| Sep 5, 2025 | Party Wall Admin Permits | Administration permit for work on shared property line with 69 Pembroke St. - New entry steps. | — | Closed |
| Sep 5, 2025 | Interior Alterations | 3rd floor window conversion to provide 2nd means of egress for an existing and proposed 2 units rental building | $35K | Open |
| Aug 22, 2025 | Porch | Proposal to reconstruct the front door entry steps and landing. | $20K | Closed |
| Jul 10, 2025 | Sprinklers | Fire Protection work consists of installing a new fire sprinkler system, and consists of installing new heat detectors in all suites in accordance with the approved alternative solution proposal dated November 5th 2024 and accepted by Toronto Fire November 25th 2024. The objective of the work is to | $120K | Open |
| May 23, 2025 | Other(BA) | Proposal to repair roof panels and copper roofing, provide a new roofing composition to meet current energy efficiency standards, and repair/replace localized areas of spalling brick. The roof deck is being removed and replaced along with the copper roofing assembly. The new roofing assembly is to b | $300K | Closed |
| Apr 15, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior renovations of the existing third floor to accommodate sleeping rooms. | — | Closed |
| Apr 15, 2025 | Building Permit Related(MS) | HVAC - Proposal for interior renovations of the existing third floor to accommodate sleeping rooms. | — | Closed |
| Apr 15, 2025 | Interior Alterations | Proposal for interior renovations of the existing third floor to accommodate sleeping rooms. | $650K | Closed |
| Jan 10, 2025 | Fire Damage | Structural fire damage restoration. - Structural fire damage restoration (finish removal, underlying insulation, removal and replacement of fire escape, inclusive offootings).Affected units include: Level 2: all 4 units + hallway; Level 1: back 2 units + hallway; Basement: hallway + mechanical room | — | Open |
| Oct 2, 2024 | Walk-Out Stair | Proposed for front walkout on existing dwelling. | $20K | Closed |
| Aug 8, 2024 | Other(BA) | Localized repairs at hydro vault including: waterproofing replacement at hydro vault roof, localized concrete repairs, foundation wall crack injection, through-wall drains, slab-on-grade trenching and below-grade plumbing. | $330K | Closed |
| Nov 8, 2023 | Backflow Prevention Devices (Water only) | Install Backflow Preventor Installation | $5K | Closed |
| Sep 8, 2023 | Other(SR) | Proposal to repair the rear and side balconies of an existing detached dwelling with 4 units. | $20K | Closed |
| Jun 14, 2023 | Building Permit Related(MS) | HVAC - Make alterations and construct 3rd floor addition with balcony at rear.see c. of a. decision | — | Closed |
| Feb 21, 2023 | Building Permit Related(MS) | HVAC - Proposal to construct a 1 sotey addition to existing single family dwelling | — | Closed |
| Feb 16, 2023 | Addition(s) | Proposal to construct a 1 storey addition to existing single family dwelling | $150K | Closed |
| Feb 16, 2023 | Building Permit Related(PS) | Plumbing - Proposal to construct a 1 sotey addition to existing single family dwelling | — | Closed |
| Jan 30, 2023 | Addition(s) | Revision 01. Reduce the size of 3rd floor addition and interior alterationsMake alterations and construct 3rd floor addition with balcony at rear.see c. of a. decision | — | Closed |
| Dec 23, 2022 | Second Suite (New) | Proposla to construct a secondary suite in the basement | $20K | Open |
| Sep 28, 2022 | Building Permit Related(PS) | Plumbing - Make alterations and construct 3rd floor addition with balcony at rear.see c. of a. decision | — | Closed |
| Aug 24, 2022 | Multiple Projects | Proposal to construct second storey rear addition (15.33sq.m). | $40K | Closed |
| Dec 13, 2021 | Backflow Prevention Devices (Water only) | Installation of a 2 inch DCVA backflow preventor | $5K | Open |
| Jul 6, 2021 | Building Permit Related (DR) | Drain - Proposal to construct a new two storey laneway suite with a full basement. | — | Closed |
| Jul 6, 2021 | New Laneway / Rear Yard Suite | Proposal to construct a new two storey laneway suite with a full basement. | $250K | Closed |
| Jul 6, 2021 | Building Permit Related(PS) | Plumbing - Proposal to construct a new two storey laneway suite with a full basement. | — | Closed |
| Jul 6, 2021 | Building Permit Related(MS) | HVAC - Proposal to construct a new two storey laneway suite with a full basement. | — | Closed |
| Jan 19, 2021 | Fire Damage | repair fire damage throughout dwelling | — | Closed |
The 40 most recent of 194 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.