thepermitmap

Street · 2916 of 8,516 by permit count

Building permits on Park Vista, East York

The City of Toronto has 60 building permits on record for Park Vista in East York, going back to 2013. Those permits created 3 homes and removed 0, a net change of +3. Declared construction value totals $4.1M. Half of the 38 permits issued here came through within 34 days of the application. The most recent permit was applied for Oct 16, 2026 at 7 Park Vista.

Permits on record
602013–2026
Declared construction value
$4.1Mas filed, not adjusted
Homes created
3dwelling units
Homes removed
0net +3
Typical wait
34 days7 days slower than the city

Permits issued per year

20132026 (part year)

Zoning

Most common zone
RAC100.0% of permits · by-law 15.20
In detached-house zones
0.0%38.0% below the city’s 38.0%
Permits with a zone
60of 60 on record
  • Residential Apartment60 · 100%

The zoning categories the permits on Park Vista fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Most common work

Structures worked on

Postal areas

Other streets in M4B

Halsey Ave69 permits
Blair St65 permits
Notley Pl64 permits
Cranfield Rd62 permits
Glenburn Ave56 permits
Holland Ave54 permits
Northdale Blvd54 permits
Northline Rd51 permits

Looking for one address on Park Vista? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Oct 16, 2026 Unspecified Deferred Fees from folder 26 235487 (RSN-5915828) ZoningProcess RSN 80659125 — Open
Sep 15, 2026 Building Permit Related(MS) HVAC - Proposed Interior Renovation to convert existing locker room at 7th floor into a Bachelor Suite. — Open
Sep 15, 2026 Building Permit Related(PS) Plumbing - Proposed Interior Renovation to convert existing locker room at 7th floor into a Bachelor Suite. — Open
Sep 15, 2026 Interior Alterations Proposed Interior Renovation to convert existing locker room at 7th floor into a Bachelor Suite. $50K Open
Sep 10, 2026 Building Permit Related(MS) HVAC - Proposal for interior alterations to convert the existing locker room at the 8th floor into a one bedroom suite.See also 25 102881 ZAP — Open
Sep 10, 2026 Building Permit Related(PS) Plumbing - Proposal for interior alterations to convert the existing locker room at the 8th floor into a one bedroom suite.See also 25 102881 ZAP — Open
Aug 18, 2026 Building Permit Related(MS) HVAC - Proposal to convert existing locker room at 5th floor into bachelor suite. — Open
Aug 18, 2026 Interior Alterations Proposal to convert existing locker room at 5th floor into bachelor suite. $90K Open
Aug 18, 2026 Building Permit Related(PS) Plumbing - Proposal to convert existing locker room at 5th floor into bachelor suite. — Open
Jul 9, 2026 Building Permit Related(PS) Plumbing - Proposal for interior alterations to convert the existing locker room at the 8th floor into a one bedroom suite — Closed
Jul 9, 2026 Building Permit Related(MS) HVAC - Proposal for interior alterations to convert the existing locker room at the 8th floor into a one bedroom suite — Closed
Jul 9, 2026 Interior Alterations Proposal for interior alterations to convert the existing locker room at the 8th floor into a one bedroom suite $100K Closed
Jul 7, 2026 Interior Alterations Revision 1: revision adds to the scope of work the replacing and installation of new windows at the 4th, 7th, 8th, 9th and 10th floors. Proposal for interior alteration to convert existing locker room at 6th floor into a Bachelor Suite. — Open
Jun 12, 2026 Interior Alterations Rev 01 - Revision to replace and install new windows at 3rd, 5th, 6th, 7th, and 8th floors.Proposal for interior alterations to relocate laundry room and tenant lockers to the ground floor and convert existing laundry room on the 2nd floor to a bachelor suite.See also 25 102881 ZAP. — Open
Apr 2, 2026 Building Permit Related(MS) HVAC - Proposal for interior alteration to convert existing locker room at 6th floor into a Bachelor Suite. — Open
Apr 2, 2026 Building Permit Related(PS) Plumbing - Proposal for interior alteration to convert existing locker room at 6th floor into a Bachelor Suite. — Open
Mar 23, 2026 Building Permit Related(PS) Plumbing - Proposal for interior alterations to relocate laundry room and tenant lockers to the ground floor and convert existing laundry room on the 2nd floor to a bachelor suite.See also 25 102881 ZAP. — Open
Mar 23, 2026 Building Permit Related(MS) HVAC - Proposal for interior alterations to relocate laundry room and tenant lockers to the ground floor and convert existing laundry room on the 2nd floor to a bachelor suite.See also 25 102881 ZAP. — Open
Nov 3, 2025 Building Permit Related(MS) HVAC - Proposal for interior alteration to ground and second floor. — Closed
Oct 31, 2025 Building Permit Related(PS) Plumbing - Proposal for interior alteration to ground and second floor. — Closed
Oct 31, 2025 Interior Alterations Proposal for interior alteration to ground and second floor. $250K Closed
Sep 24, 2025 Sign Building Permit Related 1 Ground Sign**** 2 PARK VISTA ****** — Closed
Sep 15, 2025 Sign Building Permit Related 1 Ground Sign — Closed
Sep 10, 2025 Sign Building Permit Related Application for a permit to erect and display one first party ground sign, displaying static copy. Dimensions:Ground sign 1.62 m L x 0.91m W x 0.3m D at a height of 1.82 double sided on the north frontage.** 7 PARK VISTA** — Closed
Aug 29, 2025 Sign Building Permit Related 1 Ground Sign**** 8 PARK VISTA ***** — Closed
Aug 19, 2025 Sign Building Permit Related 1 Ground Sign**** 8 PARK VISTA ***** — Closed
Jul 11, 2025 Sign Building Permit Related 1 Ground Sign — Closed
Jul 11, 2025 Sign Building Permit Related 1Ground Sign — Closed
Jul 11, 2025 Sign Building Permit Related 1 Ground Sign — Closed
Jul 11, 2025 Sign Building Permit Related 1 Ground Sign — Closed
May 8, 2023 Building Permit Related(MS) HVAC - Replace existing life-safety genertor. Construct new partition to separate the room from the rest of the mechanical room. Construct wall openings for combustion and ventilation air. Provide toxic gas monitor and fan. Add four new spinkler heads. — Closed
May 8, 2023 Building Permit Related(MS) HVAC - Replace existing life-safety genertor. Construct new partition to separate the room from the rest of the mechanical room. Construct wall openings for combustion and ventilation air. Provide toxic gas monitor and fan. Add four new spinkler heads. — Closed
May 8, 2023 Building Permit Related(MS) HVAC - Replace existing life-safety genertor. Construct new partition to separate the room from the rest of the mechanical room. Construct wall openings for combustion and ventilation air. Provide toxic gas monitor and fan. Add four new spinkler heads. — Closed
May 8, 2023 Multiple Projects Replace existing life-safety genertor. Construct new partition to separate the room from the rest of the mechanical room. Construct wall openings for combustion and ventilation air. Provide toxic gas monitor and fan. Add four new spinkler heads. $400K Closed
May 8, 2023 Multiple Projects Replace existing life-safety genertor. Construct new partition to separate the room from the rest of the mechanical room. Construct wall openings for combustion and ventilation air. Provide toxic gas monitor and fan. Add four new spinkler heads. $400K Closed
May 5, 2023 Multiple Projects Replace existing life-safety genertor. Construct new partition to separate the room from the rest of the mechanical room. Construct wall openings for combustion and ventilation air. Provide toxic gas monitor and fan. Add four new spinkler heads. $400K Closed
Jan 5, 2023 Other(BA) Enclose existing exist stair at ground floor so that it can exist directly to exterior provide fire rated partition araund stair to separate from the loby $40K Closed
Jul 4, 2022 Other(BA) Enclose existing exist stair at ground floor so that it can exist directly to exterior provide fire rated partition araund stair to separate from the loby $40K Closed
Dec 17, 2021 Building Permit Related(PS) Plumbing - Interior alterations to convert existing locker room to Bachelor unit, work includes construction of new non load bearing partition walls, additional doors — Closed
Dec 17, 2021 Building Permit Related(MS) HVAC - Interior alterations to convert existing locker room to Bachelor unit, work includes construction of new non load bearing partition walls, additional doors — Closed

The 40 most recent of 60 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Park Vista with a permit on record · 5

  • 2 Park Vista19 permits · to 2026
  • 4 Park Vista2 permits · to 2020
  • 6 Park Vista8 permits · to 2025
  • 7 Park Vista19 permits · to 2026
  • 8 Park Vista12 permits · to 2025
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
60
Data through
2026-10-16
Refresh
Daily from the City
Sheet
STR-686