thepermitmap

Street · 1106 of 8,567 by permit count

Building permits on Oakdale Rd

The City of Toronto has 170 building permits on record for Oakdale Rd, going back to 1994. Declared construction value totals $30.7M. The most recent permit was applied for Aug 7, 2026 at 750 Oakdale Rd.

Permits on record
1701994–2026
Declared construction value
$30.7Mas filed, not adjusted
Homes created
0dwelling units
Homes removed
0net +0

Permits issued per year

20002026 (part year)

Most common work

  • Backflow Prevention Devices (Water only)33 · 19%
  • Interior Alterations26 · 15%
  • Building Permit Related(PS)24 · 14%
  • Building Permit Related(MS)22 · 13%
  • Sign Building Permit Related6 · 4%
  • Special Ventilation System5 · 3%
  • Piping: Other Buildings5 · 3%
  • Addition(s)5 · 3%
  • Install/Alter HVAC - only5 · 3%
  • Re-Roofing/Re-Cladding4 · 2%
  • Alteration to Existing Building4 · 2%
  • Install/Alter Plumbing - only4 · 2%

Structures worked on

  • Industrial37 · 22%
  • Secondary School24 · 14%
  • Industrial Manufacturing Plant18 · 11%
  • Office17 · 10%
  • Restaurant 30 Seats or Less13 · 8%
  • Retail Store11 · 6%
  • Other10 · 6%
  • Industrial Processing Plant7 · 4%
  • First Party6 · 4%
  • Multiple Unit Building5 · 3%
  • Warehouse4 · 2%
  • Industrial Warehouse/Hazardous Building4 · 2%

Most recent permits

Issued Work What was filed Value Status
Aug 7, 2026 Interior Alterations Proposal for interior alterations to existing retail unit for new photography studio. $10K Open
Aug 7, 2026 Building Permit Related(PS) Plumbing - Proposal for interior alterations to existing retail unit for new photography studio. Open
May 27, 2026 Building Permit Related(PS) Plumbing - Proposal for conversion of washroom to universal washroom, installation of new door operators, construction of new stage lift. Open
May 27, 2026 Interior Alterations Proposal for conversion of washroom to universal washroom, installation of new door operators, construction of new stage lift. $400K Open
May 27, 2026 Building Permit Related(MS) HVAC - Proposal for conversion of washroom to universal washroom, installation of new door operators, construction of new stage lift. Open
Feb 24, 2026 Other(PS) Washroom new fixture upgrade and sink replacement / upgrade in cafe area. $10K Open
Dec 17, 2025 Backflow Prevention Devices (Water only) Proposal to install one backflow prevention device in existing building. $1K Closed
Jul 22, 2025 Other(BA) Proposed solar panel installation on roof of a car dealership. $100K Open
Apr 9, 2025 Building Permit Related(MS) HVAC - Proposed interior alterations Open
Feb 6, 2025 Interior Alterations Proposal for exterior claddingand exterior structural work including the applicaiton of external cladding retrofit of existing industrial building. $500K Open
Oct 31, 2024 Solar Collector Alteration to existing Photovoltaic System on roof (4) panels relocated $11K Closed
Oct 23, 2024 Backflow Prevention Devices (Water only) Replace backflow prevention device due to leak - emergency repair $8K Closed
Oct 15, 2024 Building Permit Related(PS) Plumbing - Proposed interior alterations Open
Oct 8, 2024 Interior Alterations Proposed interior alterations $80K Open
Jul 4, 2024 Building Permit Related(PS) Plumbing - Proposal for interior alterations to update lighting, acoustics and HVAC in selected classrooms - "Westview Centennial Secondary School" Closed
Jul 4, 2024 Building Permit Related(MS) HVAC - Proposal for interior alterations to update lighting, acoustics and HVAC in selected classrooms - "Westview Centennial Secondary School" Closed
Jun 7, 2024 Interior Alterations Proposal for interior alterations to update lighting, acoustics and HVAC in selected classrooms - "Westview Centennial Secondary School" $1.2M Closed
Mar 18, 2024 Interior Alterations Rev 03 - To include racking system specifications in storage roomRevision #02: change use for cereal/flour mills, interior and exterior alterations structural framing REVISION#1: INTERIOR ALTERATIONS - RESTROOMS 33.17SMinterior alterations to one storey industrial building Closed
Mar 14, 2024 Sprinklers Revision 01: 1 A new branch line with upright sprinklers was added at the following places due to obstruction caused by the beam.¿ between Grid line 10 and 11,¿ at the upper part after Gridline 6¿ at the lower part before Gridline 6.2. 3 new upright heads were added above ceiling on an existing line Open
Sep 6, 2023 Inside and Outside Drains Revision: Sump Pump specification Closed
Jun 21, 2023 Addition(s) REVISION 01: to the proposed details for the conversion of mezzanine floor to office spaceProposal for mezzanine extension to a full second storey on unit #56 for a consulting office Closed
Apr 20, 2023 Building Permit Related(MS) HVAC - interior alterations to one storey industrial building Closed
Apr 14, 2023 Building Permit Related(PS) Plumbing - interior alterations to one storey industrial building Closed
Apr 3, 2023 Re-Roofing/Re-Cladding Partial roof replacement - Westview Centennial Secondary School. $4.5M Closed
Sep 30, 2022 Interior Alterations Rev 01 - Proposed layout alterationsProposal for interior alterations for retail store. unit 38 Closed
Aug 23, 2022 Building Permit Related(PS) Rev 01 - Proposed layout alterationsPlumbing - Proposal for interior alterations for retail store. unit 38 Closed
Aug 23, 2022 Building Permit Related(MS) HVAC - Proposal for interior alterations for retail store. unit 38 Closed
Aug 12, 2021 Re-Roofing/Re-Cladding Proposed roof replacement of a select portion of the building including a partial roof deck replacement. $7.5M Open
Feb 19, 2021 Building Permit Related(MS) HVAC - Proposal for second floor extension to the existing office. Open
Feb 19, 2021 Building Permit Related(PS) Plumbing - Proposal for second floor extension to the existing office. Open
Nov 23, 2020 Sign Building Permit Related To erect and display one illuminated ground sign, already approved by variance # 20-169094.****WESTVIEW CENTENNIAL SS**** Closed
Jun 26, 2020 Building Permit Related(MS) HVAC - Interior alterations to units 55-56 office/warehouse Open
May 21, 2020 Interior Alterations Interior alterations to units 55-56 office/warehouse $20K Open
Nov 20, 2019 Solar Collector Proposal to remove and reinstall existing photovoltaic system on roof of existing school. $55K Open
Sep 5, 2019 Building Permit Related(MS) Rev02: changes as per drawings Closed
Jul 11, 2019 Re-Roofing/Re-Cladding Proposal for exterior facade improvements to existing multiple tenant building $250K Open
Jun 27, 2019 Re-Roofing/Re-Cladding Roof structural replacement $6.2M Open
Apr 17, 2019 Backflow Prevention Devices (Water only) Installation of one Backflow Prevention Devices (Water only) $5K Closed
Jan 23, 2019 Building Permit Related(PS) REV 01 - Added boiler for steam pots.Plumbing - Interior alterations to existing take-out restaurant including kitchen exhaust. Unit 7. Closed
Jan 17, 2019 Sprinklers Proposed alterations to existing sprinkler system $35K Closed

The 40 most recent of 170 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
170
City refresh
2026-09-13 10:24
Page built
2026-09-13
Sheet
STR-960