Street · 4627 of 8,516 by permit count
Building permits on Milan St
The City of Toronto has 28 building permits on record for Milan St, going back to 1991. Those permits created 3 homes and removed 0, a net change of +3. Declared construction value totals $470K. Half of the 28 permits issued here came through within 21 days of the application. The most recent permit was issued Jul 11, 2023 at 270 Milan St.
- Permits on record
- 281991–2023
- Declared construction value
- $470Kas filed, not adjusted
- Homes created
- 3dwelling units
- Homes removed
- 0net +3
- Typical wait
- 21 days6 days faster than the city
Permits issued per year
Zoning
- Most common zone
- R100.0% of permits · by-law 10.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 28of 28 on record
The zoning categories the permits on Milan St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M5A
Looking for one address on Milan St? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jul 11, 2023 | Other(MS) | Chiller and cooling Tower Replacement | $176K | Closed |
| Nov 15, 2018 | Porch | Proposal to construct a concrete porch at the rear of existing SFD - Townhouse. | $15K | Open |
| Feb 23, 2016 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations on all floors. | — | Open |
| Feb 23, 2016 | Interior Alterations | Proposal for interior alterations on all floors. | $35K | Open |
| Jan 28, 2016 | Alter: Boiler/Furnace/AC Replacement | Proposal to replace furnace, A/C and additional ductwork in existing townhouse. | $13K | Open |
| Dec 14, 2015 | Fire Damage | Proposal to repair rear wall and minor interior remediation on main floor due to fire damage | — | Closed |
| Sep 8, 2015 | Alter: Boiler/Furnace/AC Replacement | Proposal to change the heating system from electric to radiator system. | $18K | Closed |
| Dec 3, 2014 | Backflow Prevention Devices (Water only) | OTHER, PROPOSAL TO INSTALL 1 BACKFLOW PREVENTION DEVICE (WATER ONLY) IN EXISTING BUILDING - ST.JUDE COMMUNITY HOMES | $5K | Closed |
| Oct 7, 2013 | Building Permit Related(MS) | HVAC - Permit to construct new 3 Storey SFD detached dwelling - Please Note All PPR and ZZC info under 265 Ontario St. | — | Closed |
| Sep 3, 2013 | Building Permit Related (DR) | Drain - Permit to construct new 3 Storey SFD detached dwelling - Please Note All PPR and ZZC info under 265 Ontario St. | — | Closed |
| May 30, 2013 | Building Permit Related(PS) | Plumbing - Permit to construct new 3 Storey SFD detached dwelling - Please Note All PPR and ZZC info under 265 Ontario St. | — | Closed |
| May 30, 2013 | New Building | Revision to interior layout on all floors. | — | New build |
| Aug 24, 2004 | Interior Alterations | Make interior alterations at rear of dwelling. | $1K | Closed |
| Sep 17, 2001 | Deck | Build uncovered platform at rear. | $2K | Closed |
| Sep 4, 2001 | Building Permit Related(PS) | install fixtures in basement- 1 w.c., 1 w.b., 1 shower, 1 k.s. see bp#01-162588 | — | Closed |
| Sep 4, 2001 | Interior Alterations | make interior alterations to garage for habitable space and alter front elevation.see c of a dec. see O.M.B. dec. job card printed | $5K | Closed |
| Feb 23, 2001 | Addition(s) | Adding 1 window on 2nd floor and 1 window on 1st floor north elevation. "previously known as 254 Berkeley St" See BP 424134 | $200 | Closed |
| Mar 13, 2000 | Install/Alter HVAC - only | supply and install h.v.a.c.se bp# 424134 see 00-128157 for plans | — | Closed |
| Mar 13, 2000 | Install/Alter HVAC - only | supply and install h.v.a.c.se bp# 424134 see 00-128157 for plans | — | Closed |
| Mar 8, 2000 | Install/Alter HVAC - only | supply and install h.v.a.c.se bp# 424134 see 00-128169 for plans | — | Open |
| Mar 8, 2000 | Install/Alter HVAC - only | supply and install h.v.a.c.se bp# 424134 see 00-128169 for plans | — | Open |
| Mar 8, 2000 | Install/Alter HVAC - only | supply and install h.v.a.c.se bp# 424134 see 00-128169 for plans | — | Open |
| Mar 8, 2000 | Install/Alter HVAC - only | supply and install h.v.a.c.se bp# 424134 see 00-128169 for plans | — | Open |
| Mar 8, 2000 | Install/Alter HVAC - only | supply and install h.v.a.c.se bp# 424134 see 00-128169 for plans | — | Open |
| Mar 8, 2000 | Install/Alter HVAC - only | supply and install h.v.a.c.se bp# 424134 see 00-128169 for plans | — | Open |
| Mar 8, 2000 | Install/Alter HVAC - only | supply and install h.v.a.c.se bp# 424134 see 00-128169 for plans | — | Open |
| Mar 8, 2000 | Install/Alter HVAC - only | supply and install h.v.a.c.se bp# 424134 see 00-128169 for plans | — | Open |
| Sep 20, 1991 | Unknown | BUILD PAIR OF SEMI DETACHED HOUSES WITH BASEMENT GARAGES . HOLD FOR HUDAC#- RAMP-OK DPW SURVEY-OK | $200K | Closed |
The 28 most recent of 28 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Milan St with a permit on record · 19
- 214 Milan St1 permit · to 2018
- 215 Milan St1 permit · to 2015
- 218 Milan St1 permit · to 2001
- 228 Milan St1 permit · to 1991
- 242 Milan St3 permits · to 2016
- 248 Milan St2 permits · to 2001
- 255 Milan St1 permit · to 2000
- 257 Milan St1 permit · to 2000
- 259 Milan St1 permit · to 2000
- 260 Milan St1 permit · to 2004
- 261 Milan St1 permit · to 2000
- 263 Milan St1 permit · to 2000
- 264 Milan St5 permits · to 2015
- 265 Milan St1 permit · to 2000
- 267 Milan St1 permit · to 2000
- 269 Milan St1 permit · to 2000
- 270 Milan St2 permits · to 2023
- 271 Milan St1 permit · to 2000
- 273 Milan St2 permits · to 2001