Street · 3195 of 8,565 by permit count
Building permits on Michael Power Pl
The City of Toronto has 52 building permits on record for Michael Power Pl, going back to 2001. Those permits created 571 homes and removed 0, a net change of +571. Declared construction value totals $100.0M. The most recent permit was applied for Oct 31, 2025 at 11 Michael Power Pl.
- Permits on record
- 522001–2025
- Declared construction value
- $100.0Mas filed, not adjusted
- Homes created
- 571dwelling units
- Homes removed
- 0net +571
Permits issued per year
20012025 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 31, 2025 | Other(PS) | Kitech removal and PEX installation to a condo unit, no change in location or number of fixtures | $5K | Closed |
| Mar 10, 2025 | Piping: Other Buildings | Proposal for kitec piping replacement | $7K | Open |
| Nov 20, 2024 | Fire Alarm | Proposal for fire panel and announciator replacement | $218K | Closed |
| Nov 20, 2024 | Fire Alarm | Proposal for fire panel and annunciator replacement | $218K | Closed |
| Nov 19, 2024 | Fire Alarm | Proposal for fire panel and annunciator replacement | $218K | Closed |
| Feb 9, 2024 | Building Permit Related(MS) | HVAC - CREATION OF PARCEL ROOM WITHIN EXISTING GROUND FLOOR LOBBY OF MULTI-UNIT RESIDENTIAL BUILDING | — | Closed |
| Feb 9, 2024 | Interior Alterations | CREATION OF PARCEL ROOM WITHIN EXISTING GROUND FLOOR LOBBY OF MULTI-UNIT RESIDENTIAL BUILDING | $20K | Closed |
| Aug 17, 2020 | Re-Roofing/Re-Cladding | Proposal for roof deck repair and slab concrete repair in the existing common garage for 11, 15, & 17 Michael Power Place. | $600K | Open |
| Jun 19, 2019 | Piping: Other Buildings | Proposed in-suite Kitec domestic water piping replacement in unit 604 of existing Apartment Building. | $4K | Closed |
| Feb 20, 2019 | Other(PS) | Proposal for kitec replacement in unit 604. | $4K | Closed |
| Nov 12, 2018 | Piping: Other Buildings | Replacement of in-suite Kitec Domestic water piping | $3K | Open |
| Oct 25, 2018 | Other(PS) | Proposal to replace Kitec plumbing in 125 units of apartment building. | $125K | Closed |
| Feb 1, 2017 | Piping: Other Buildings | replacement of Kitec piping | $2K | Closed |
| Sep 29, 2016 | Piping: Other Buildings | Applicant propose to replace the existing KITEC PIPING in suite 716 | $2K | Closed |
| Mar 18, 2016 | New Building | **REVISION 01**To revise exit paths on underground levels P2, P3 and P4 due to relocation of the parking ramp. | — | New build |
| Jan 13, 2014 | Building Permit Related(PS) | Revision #1: *as built* per inspectors request. Plumbing - To construct a 20 storey, 253 unit condominium tower with 4 levels of below grade parking - New Building. Building **G** | — | Closed |
| Jan 13, 2014 | Building Permit Related(MS) | HVAC - Revision #1: *As built* per inspectors request. To construct a 20 storey, 253 unit condominium tower with 4 levels of below grade parking - New Building. Building **G** | — | Closed |
| Jun 8, 2011 | Building Permit Related(FS) | Port Royal Place, Phase 3 automatic sprinkler system | $1.0M | Closed |
| Jun 8, 2011 | Building Permit Related(FS) | Port Royal Place Phase 3 automatic sprinkler system | $1.0M | Closed |
| Jun 6, 2011 | Building Permit Related(PS) | Plumbing - Revision 01: To plumbing sytstems foors ground to 30 included - msTo construct a 30 storey, 261 unit condominium tower c/w 4 levels of underground parking. Building **H** - New Building | — | Closed |
| Jun 6, 2011 | Building Permit Related(MS) | HVAC - Revision 01: To mechanical systems floors ground to 30 included. To construct a 30 storey, 261 unit condominium tower c/w 4 levels of underground parking. Building **H** - New Building | — | Closed |
| May 26, 2010 | Backflow Prevention Devices (Water only) | installation of one backflow prevention device | $5K | Closed |
| May 20, 2010 | Backflow Prevention Devices (Water only) | Install 1 Backflow Prevention Device to Condominium Appartment Building at P1 level of an underground parking - mechanical room area. | $6K | Closed |
| Nov 2, 2009 | Demolition | Proposed demolition of existing sales office. | $50K | Demolition |
| Feb 5, 2008 | Inside and Outside Drains | Drain - To construct a 24 storey, 207 unit condominium tower c/w 4 levels of underground parking Building **F** to connect ugerground services to property line | — | Closed |
| Jan 15, 2008 | Sales Pavilions | Temporary Sales Pavilion for a future condo development at this site (see PAL 07-245885 for Condo Tower Bld) | — | Closed |
| Jan 15, 2008 | Building Permit Related(MS) | HVAC - Sales Pavilion for a future condo development at this site (see PAL 07-245885) | — | Open |
| Dec 22, 2005 | New Building | To construct a 30 storey, 261 unit condominium tower c/w 4 levels of underground parking. Building **H** | $20.0M | New build |
| Dec 21, 2005 | Building Permit Related(PS) | Plumbing - To construct a 24 storey, 207 unit condominium tower c/w 4 levels of underground parking Building **F** - New Building | — | Closed |
| Dec 21, 2005 | Building Permit Related(MS) | HVAC - To construct a 24 storey, 207 unit condominium tower c/w 4 levels of underground parking Building **F** - New Building | — | Closed |
| Dec 21, 2005 | Partial Permit - Shoring | Part Permit - To construct a 24 storey, 207 unit condominium tower c/w 4 levels of underground parkingBuilding **F** - New Building | — | Closed |
| Dec 21, 2005 | Partial Permit - Shoring | Part Permit - To construct a 30 storey, 261 unit condominium tower c/w 4 levels of underground parking. Building **H** - New Building. | — | Open |
| Dec 21, 2005 | Partial Permit - Shoring | Part Permit - To construct a 20 storey, 253 unit condominium tower with 4 levels of below grade parking. Building **G** - New Building | — | Open |
| Dec 21, 2005 | New Building | To construct a 20 storey, 252 unit condominium tower with 4 levels of below grade parking. Building **G** | $20.0M | New build |
| Apr 28, 2004 | New Building | To construct 2 new condominium towers. 7 Michael Power is 16 storeys in height (137 units) & 9 Michael Power is 8 to 12 storeys in height (149 units). Both buildings to be built on top of 3 storey underground parking garages. | $30.0M | New build |
| Apr 28, 2004 | Building Permit Related(PS) | Plumbing - To construct 2 new condominium towers. 7 Michael Power is 16 storeys in height (137 units) & 9 Michael Power is 8 to 12 storeys in height (149 units). Both buildings to be built on top of 3 storey underground parking garages. - New Building | — | Open |
| Jul 3, 2003 | Partial Permit - Foundation | Foundation to grade permit ( Partial Permit ) for 2 condominium towers, 7 michael power 16 storeys in height (137 units) & 9 Michael Power is 8 to 12 storeys in height (149 units). Both buildings to be built on top of 3 storey underground parking garages. | — | Open |
| Mar 10, 2003 | New Building | THIS FOLDER WAS OPENED IN ERROR AND HAS BEEN CLOSED -- see 03-113678 | $12.4M | New build |
| Mar 5, 2003 | Partial Permit - Shoring | Excavation & Shoring for two condominium towers under permit application # 03-107357. | — | Open |
| Feb 10, 2003 | Shoring | Excavation & Shoring for two condominium towers under permit application 03-107357. This folder opened in error -- see 03-107379 | — | Closed |
The 40 most recent of 52 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.