Street · 3570 of 8,565 by permit count
Building permits on Merchants' Wharf
The City of Toronto has 44 building permits on record for Merchants' Wharf, going back to 2014. Those permits created 363 homes and removed 0, a net change of +363. Declared construction value totals $86.8M. The most recent permit was applied for Jul 3, 2026 at 55 Merchants' Wharf.
- Permits on record
- 442014–2026
- Declared construction value
- $86.8Mas filed, not adjusted
- Homes created
- 363dwelling units
- Homes removed
- 0net +363
Permits issued per year
20142026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jul 3, 2026 | Interior Alterations | Revision 01: to include a proposed private outdoor patio, establish the outdoor occupant load for the patio area, and support the liquor licence application. No changes are proposed to the existing indoor layout or indoor occupant load.Interior alterations to vacant suite to propose pizza restaurant | — | Open |
| Jul 4, 2025 | Electromagnetic Locks | Proposal for addition of maglock | $12K | Closed |
| Feb 6, 2024 | Other(BA) | Proposed removal and replacement of two (2) overhead folding doors with a combination of fixed curtain wlal glazing, swing doors and roll-up doors. | $400K | Open |
| Dec 14, 2023 | Sign Building Permit Related | install 3 first party signs. 2 wall signs and 1 projecting sign | — | Closed |
| Jun 7, 2023 | Building Permit Related(PS) | Rev01:Revised plumbing, drainage, toilet specs and wall types at all WCs and BOH(back of house kitchen)+ Plan Change WCPlumbing - Proposal for interior alterations for a new restaurant, greater than 30 seats and an outdoor patio - UNITS 11 & 12, "Simona", Auqualina at Bayside | — | Closed |
| May 16, 2023 | Building Permit Related(MS) | Revision 01 - Relocation of washroom and a few plumbing fixtures.HVAC - Proposed construction of interior partitions and new plumbing fixtures. | — | Closed |
| May 12, 2023 | Interior Alterations | Rev 01: Revised plumbing, drainage, toilet specs and wall types at all WCs and BOH(back of house kitchen)+ Plan Change WCProposal for interior alterations for a new restaurant, greater than 30 seats and an outdoor patio - UNITS 11 & 12, "Simona", Auqualina at Bayside | — | Closed |
| May 4, 2023 | Building Permit Related(PS) | Revision 01 - Relocation of washroom and a few plumbing fixtures.Plumbing - Proposed construction of interior partitions and new plumbing fixtures. | — | Closed |
| Apr 20, 2023 | Interior Alterations | Revision 01 - Relocation of washroom and a few plumbing fixtures.Proposed construction of interior partitions and new plumbing fixtures. | — | Open |
| Feb 21, 2023 | Building Permit Related(MS) | HVAC - includes a kitchen exhaustProposal for interior alterations for a new restaurant, greater than 30 seats and an outdoor patio - UNITS 11 & 12, "Simona", Auqualina at Bayside | — | Closed |
| Feb 7, 2022 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations for a Gong Cha Bubble Tea -takeout only. | — | Closed |
| Feb 7, 2022 | Building Permit Related(MS) | HVAC - Proposal for interior alterations for a Gong Cha Bubble Tea -takeout only. | — | Closed |
| Feb 7, 2022 | Interior Alterations | Proposal for interior alterations for a Gong Cha Bubble Tea -takeout only. | $50K | Closed |
| Aug 23, 2021 | Sign Building Permit Related | Proposal to erect and display two signs, one illuminated wall sign and one over hanging illuminated sign.***MARVEICKS BURGER*** | — | Closed |
| Aug 12, 2021 | Interior Alterations | Revision 01: changes to the floor plan | — | Closed |
| Aug 11, 2021 | Building Permit Related(PS) | Revision 01: changes to the plumbing layout | — | Closed |
| Aug 11, 2021 | Building Permit Related(MS) | Revision 01: change to the HVAC system layout | — | Open |
| Jun 4, 2021 | Sign Building Permit Related | Proposal to erect and display three wall signs, all illuminated and displaying static copy at the 1st floor on the west elevation.****NFORNO**** | — | Closed |
| Mar 26, 2021 | Building Permit Related(PS) | Plumbing - Tenant fit out in an existing building to construct a Sale Presentation Centre within the building designated retail areas. | — | Closed |
| Mar 26, 2021 | Building Permit Related(MS) | HVAC - Tenant fit out in an existing building to construct a Sale Presentation Centre within the building designated retail areas. | — | Open |
| Mar 26, 2021 | Interior Alterations | Tenant fit out in an existing building to construct a Sale Presentation Centre within the building designated retail areas. | $500K | Open |
| Mar 5, 2021 | Sign Building Permit Related | In conjunction with a multi-storey building on the premises, proposal to erect and display two illuminated wall signs, displaying static copy at the 1st floor on the east and north elevations.****SCOTIABANK**** | — | Closed |
| Feb 24, 2021 | Sprinklers | Sprinkler drawings for Scotiabank Solution Branch - Queen's Quay - refer to permit 20-144248 BLD | $5.0M | Open |
| Aug 7, 2020 | Building Permit Related(MS) | HVAC - Interior alterations to vacant unit to propose pizza restaurant | — | Open |
| Aug 4, 2020 | Building Permit Related(PS) | Plumbing - Interior alterations to vacant unit to propose pizza restaurant | — | Closed |
| Jun 9, 2020 | Building Permit Related(PS) | Plumbing - Proposal for interior fit up,, Bank of Nova Scotia. Pending address 225 Queens Quay East | — | Closed |
| Jun 9, 2020 | Building Permit Related(MS) | HVAC - Proposal for interior fit up, Bank of Nova Scotia. Pending address 225 Queens Quay East | — | Closed |
| Jun 9, 2020 | Interior Alterations | Proposal for interior fit up for Bank of Nova Scotia. Pending address 225 Queens Quay East | $600K | Closed |
| Nov 29, 2019 | Interior Alterations | Revision 1 Attaching raised floor framing planProposed interior alterations to an existing dental office unit E(10) | $10K | Closed |
| Jul 23, 2019 | Interior Alterations | Proposal for conversion of unit 4 for new restaurant with 30 seats from a retail store. "Aqualina". Scope of work includes new kitchen exhaust. | $250K | Open |
| Jul 23, 2019 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to unit 4 for new restaurant with 30 seats "Aqualina" | — | Open |
| Jul 23, 2019 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to unit 4 for new restaurant with 30 seats "Aqualina" | — | Open |
| Apr 11, 2019 | Building Permit Related(MS) | HVAC - Proposed interior alterations to an existing dental office unit E(10) | — | Closed |
| Apr 11, 2019 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to an existing dental office unit E(10) | — | Open |
| Nov 24, 2017 | Electromagnetic Locks | Proposal to install 7 maglocks1 - P1 Level2 - P2 Level2 - Level 72 - Level 11 | — | Closed |
| Nov 2, 2016 | Building Permit Related(PS) | Plumbing - revision for SS piping as approved by 16-200874 ALT AS, location as highlighed | — | Open |
| Oct 26, 2016 | New Building | Proposal to construct a 13 sty condo with 363 residential units, 4 levels of below grade parking including 1 level of commercial parking, and ground floor commercial. | $80.0M | New build |
| Aug 31, 2016 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposal to construct a 13 sty condo with 363 residential units, 4 levels of below grade parking including 1 level of commercial parking, and ground floor commercial. | — | Open |
| Aug 3, 2016 | Alternative Solution | Proposal to use 304L schedule 40 stainless steel piping with grooved and/or welded stainless steel fittings as an alterantive solution to the acceptable materials listed in Division B Table 7.2.11.2 of the OBC for materials used for domestic cold water services. | — | Closed |
| Jan 13, 2016 | Building Permit Related(MS) | HVAC - Proposal to construct a 13 sty condo with 364 residential units, 4 levels of below grade parking including 1 level of commercial parking, and ground floor commercial. | — | Open |
The 40 most recent of 44 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.