Building permits on Marlee Ave
The City of Toronto has 260 building permits on record for Marlee Ave, going back to 1994. Those permits created 380 homes and removed 12, a net change of +368. Declared construction value totals $220.1M. Half of the 233 permits issued here came through within 33 days of the application. The most recent permit was applied for Oct 30, 2026 at 529 Marlee Ave.
- Permits on record
- 2601994–2026
- Declared construction value
- $220.1Mas filed, not adjusted
- Homes created
- 380dwelling units
- Homes removed
- 12net +368
- Typical wait
- 33 days6 days slower than the city
Permits issued per year
Zoning
- Most common zone
- CR38.0% of permits · by-law 40.10
- In detached-house zones
- 23.5%14.5% below the city’s 38.0%
- Permits with a zone
- 213of 260 on record
The zoning categories the permits on Marlee Ave fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Where this street runs
Other streets in M6B
Looking for one address on Marlee Ave? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 30, 2026 | Partial Permit - Shoring | Part Permit - Proposed 30-storey mixed-use residential condominium building with four levels of underground parking (P4-P1), ground floor and mezzanine level. | — | Open |
| Oct 30, 2026 | Other(MS) | Geothermal System for a new rental development. | $100.0M | Open |
| Oct 9, 2026 | Building Permit Related(MS) | HVAC - Proposed 30-storey mixed-use residential condominium building with four levels of underground parking (P4-P1), ground floor and mezzanine level. | — | Open |
| Oct 9, 2026 | Site Service | Drain - Proposed 30-storey mixed-use residential condominium building with four levels of underground parking (P4-P1), ground floor and mezzanine level. | $300K | Open |
| Oct 9, 2026 | Building Permit Related (DR) | Drain - Proposed 30-storey mixed-use residential condominium building with four levels of underground parking (P4-P1), ground floor and mezzanine level. | — | Open |
| Oct 9, 2026 | Building Permit Related(PS) | Plumbing - Proposed 30-storey mixed-use residential condominium building with four levels of underground parking (P4-P1), ground floor and mezzanine level. | — | Open |
| Oct 9, 2026 | New Building | Proposed 30-storey mixed-use residential condominium building with four levels of underground parking (P4-P1), ground floor and mezzanine level. | $100.0M | New build |
| Sep 23, 2026 | Other(BA) | Standalone shoring and excavation for soil remediation. | $100K | Open |
| Sep 16, 2026 | Building Permit Related(PS) | Plumbing - Proposal to construct a new three storey four unit dwelling complete with an exterior staircase. | — | Open |
| Sep 4, 2026 | Building Permit Related(MS) | HVAC - Proposal to construct a new three storey four unit dwelling complete with an exterior staircase. | — | Open |
| Jul 21, 2026 | Building Permit Related(MS) | HVAC - PROPOSED NEW GARDEN SUITE (38.626m2 ABOVE GRADE, 38.626m2 BELOW GRADE) | — | Open |
| Jul 21, 2026 | Building Permit Related(PS) | Plumbing - PROPOSED NEW GARDEN SUITE (38.626m2 ABOVE GRADE, 38.626m2 BELOW GRADE) | — | Open |
| Mar 11, 2026 | Multiple Projects | Proposed new construction of vestibule enclosure at main entrance of building, change of toilet to urinal and replacement of 3 new windows | $50K | Open |
| Feb 13, 2026 | Inside and Outside Drains | Drain - Construct a new 4 storey condominium with 28 units, one level underground parking garage | $30K | Open |
| Dec 22, 2025 | Multiple Projects | Proposal for multiple projects (two storey addition, third unit, garage and interior alterations). | $250K | Open |
| Dec 22, 2025 | Building Permit Related(MS) | HVAC - Proposal for multiple projects (two storey addition, third unit, garage and interior alterations). | — | Open |
| Dec 22, 2025 | Building Permit Related(PS) | Plumbing - Proposal for multiple projects (two storey addition, third unit, garage and interior alterations). | — | Open |
| Dec 16, 2025 | Demolition | Proposal to demolish 1 storey commercial building for construction of new residential condominium | — | Demolition |
| Nov 19, 2025 | Building Permit Related(PS) | Plumbing - Proposed Interior cosmetic upgrade including in-suite laundry addition.No changes to existing HVAC system. | — | Closed |
| Nov 19, 2025 | Building Permit Related(MS) | HVAC - Proposed Interior cosmetic upgrade including in-suite laundry addition.No changes to existing HVAC system. | — | Closed |
| Nov 19, 2025 | Interior Alterations | Proposed Interior cosmetic upgrade including in-suite laundry addition.No changes to existing HVAC system. | $20K | Closed |
| Oct 27, 2025 | Demolition | Proposal to demolition single storey dwelling, basement house and demolition of shed | — | Demolition |
| Oct 20, 2025 | Re-Roofing/Re-Cladding | Proposal to repair exterior walls, brick replacement and concrete repairs. | $215K | Open |
| Oct 2, 2025 | New Laneway / Rear Yard Suite | PROPOSED NEW GARDEN SUITE (38.626m2 ABOVE GRADE, 38.626m2 BELOW GRADE) | $500K | Open |
| Oct 2, 2025 | New Building | Proposal to construct a new three storey four unit dwelling complete with an exterior staircase. | $1.0M | New build |
| Aug 27, 2025 | Demolition | Proposal to demolosh existing dwelling and construct a new four unit dwelling. | — | Demolition |
| Jul 30, 2025 | Interior Alterations | Proposal to repair a portion of the building due to exterior impact damage. | $10K | Open |
| Jul 8, 2025 | Multiple Projects | Proposal to remove some interior walls and replace them with new beams/posts. New below grade concrete staricase at rear. | $30K | Closed |
| May 22, 2025 | New Building | REV01: PER CLARIFICATION OF EXTERIOR EIFS WALL ASSEMBLIES FOR THE CONSTRUCTION OF A 4-STOREY CONDOMINIUM WITH 28 RESIDENTIAL UNITS PER UPDATED DRAWINGSConstruct a new 4 storey condominium with 28 units, one level of underground parking garage | — | New build |
| May 8, 2025 | Canopy w/o Enclosure | Proposal to construct a canopy to the north, south and east elevations. | $15K | Open |
| Apr 14, 2025 | Piping: Other Buildings | Replace the main hot and cold header in the hallway and the domestic risers inside the apartments. Original pipes are of glavanized/copper mix and are leaking and have low pressure. | $34K | Open |
| Mar 18, 2025 | Building Permit Related(PS) | REVISION 01: PROPOSAL TO THE SITE INSTRUCTION ATTACHED. HUBS ADDED TO EQUIPMENT CLOSETS FOR CONDENSATE DRAINS FOR FURNACES AND HOT WATER HEATERS, AND T&P RELEASE FOR HOT WATER HEATERS.Plumbing - Construct a new 4 storey condominium with 28 units, one level underground parking garage | — | Open |
| Dec 23, 2024 | Building Permit Related(PS) | Plumbing - Proposal for interior alteration - to add bar area to existing restaurant | — | Closed |
| Oct 18, 2024 | Interior Alterations | Proposal for interior alteration - to add bar area to existing restaurant | $69K | Closed |
| Jun 19, 2024 | Sign Building Permit Related | Application for a permit to erect and display one (1) first party wall sign, displaying static copy and illuminated, erected at the first storey.Dimensions:Wall sign1: 1.99 m2 at a height of 3.66m.*** PHONES+ *** | — | Closed |
| Jun 18, 2024 | Sign Building Permit Related | 1 projecting sign | — | Closed |
| May 14, 2024 | Sign Building Permit Related | 1Projecting Sign | — | Closed |
| May 14, 2024 | Balcony/Guard Repairs | Balcony Repairs | $445K | Open |
| May 9, 2024 | Building Permit Related(MS) | HVAC - Construct a new 4 storey condominium with 28 units, one level underground parking garage | — | Open |
| Aug 11, 2023 | Partial Permit - Foundation | Conditional Permit - Part Permit - Construct a new 4 storey condominium with 28 units, one level underground parking garage | — | Closed |
The 40 most recent of 260 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Marlee Ave with a permit on record · 87
- 9 Marlee Ave1 permit · to 2013
- 15 Marlee Ave2 permits · to 2015
- 21 Marlee Ave1 permit · to 2025
- 25 Marlee Ave2 permits · to 2017
- 29 Marlee Ave1 permit · to 2011
- 39 Marlee Ave1 permit · to 2013
- 65 Marlee Ave1 permit · to 2014
- 67 Marlee Ave3 permits · to 2015
- 69 Marlee Ave9 permits · to 2026
- 73 Marlee Ave3 permits · to 2021
- 77 Marlee Ave2 permits · to 2020
- 79 Marlee Ave1 permit · to 1994
- 99 Marlee Ave5 permits · to 2022
- 100 Marlee Ave4 permits · to 2019
- 110 Marlee Ave2 permits · to 2024
- 135 Marlee Ave9 permits · to 2021
- 145 Marlee Ave21 permits · to 2024
- 155 Marlee Ave15 permits · to 2025
- 158 Marlee Ave5 permits · to 2025
- 160 Marlee Ave1 permit · to 2018
- 162 Marlee Ave2 permits · to 2019
- 164 Marlee Ave4 permits · to 2017
- 166 Marlee Ave1 permit · to 2022
- 210 Marlee Ave5 permits · to 2025
- 244 Marlee Ave3 permits · to 2014
- 245 Marlee Ave7 permits · to 2014
- 246 Marlee Ave7 permits · to 2014
- 247 Marlee Ave7 permits · to 2014
- 248 Marlee Ave7 permits · to 2014
- 249 Marlee Ave7 permits · to 2014
- 250 Marlee Ave7 permits · to 2014
- 251 Marlee Ave4 permits · to 2003
- 260 Marlee Ave4 permits · to 2020
- 261 Marlee Ave4 permits · to 2020
- 262 Marlee Ave4 permits · to 2020
- 263 Marlee Ave4 permits · to 2020
- 264 Marlee Ave4 permits · to 2020
- 265 Marlee Ave4 permits · to 2020
- 266 Marlee Ave4 permits · to 2020
- 326 Marlee Ave2 permits · to 2012
- 327 Marlee Ave2 permits · to 2012
- 328 Marlee Ave2 permits · to 2012
- 342 Marlee Ave1 permit · to 2010
- 343 Marlee Ave1 permit · to 2010
- 344 Marlee Ave1 permit · to 2010
- 358 Marlee Ave1 permit · to 2012
- 359 Marlee Ave1 permit · to 2012
- 360 Marlee Ave1 permit · to 2012
- 375 Marlee Ave4 permits · to 2017
- 376 Marlee Ave1 permit · to 2007
- 377 Marlee Ave1 permit · to 2007
- 414 Marlee Ave1 permit · to 2016
- 457 Marlee Ave38 permits · to 2025
- 499 Marlee Ave1 permit · to 1997
- 501 Marlee Ave3 permits · to 2006
- 509 Marlee Ave2 permits · to 2001
- 510 Marlee Ave2 permits · to 2001
- 511 Marlee Ave2 permits · to 2001
- 517 Marlee Ave1 permit · to 2017
- 529 Marlee Ave9 permits · to 2026
- 543 Marlee Ave1 permit · to 2025
- 561 Marlee Ave4 permits · to 2009
- 572 Marlee Ave5 permits · to 2003
- 573 Marlee Ave5 permits · to 2003
- 574 Marlee Ave5 permits · to 2003
- 586 Marlee Ave2 permits · to 2024
- 596 Marlee Ave3 permits · to 2025
- 597 Marlee Ave3 permits · to 2025
- 598 Marlee Ave3 permits · to 2025
- 604 Marlee Ave1 permit · to 2021
- 607 Marlee Ave4 permits · to 2011
- 609 Marlee Ave4 permits · to 2011
- 611 Marlee Ave4 permits · to 2011
- 716 Marlee Ave17 permits · to 2016
- 718 Marlee Ave1 permit · to 2014
- 720 Marlee Ave9 permits · to 2019
- 722 Marlee Ave10 permits · to 2026
- 724 Marlee Ave1 permit · to 2023
- 726 Marlee Ave1 permit · to 2008
- 738 Marlee Ave2 permits · to 2023
- 740 Marlee Ave3 permits · to 2023
- 744 Marlee Ave1 permit · to 2017
- 746 Marlee Ave3 permits · to 2021
- 748 Marlee Ave3 permits · to 2021
- 776 Marlee Ave1 permit · to 2014
- 782 Marlee Ave1 permit · to 2002
- 788 Marlee Ave4 permits · to 2026