Street · 583 of 8,567 by permit count
Building permits on Marion St
The City of Toronto has 292 building permits on record for Marion St, going back to 1993. Those permits created 18 homes and removed 1, a net change of +17. Declared construction value totals $5.5M. The most recent permit was issued Jun 29, 2026 at 75 Marion St.
- Permits on record
- 2921993–2026
- Declared construction value
- $5.5Mas filed, not adjusted
- Homes created
- 18dwelling units
- Homes removed
- 1net +17
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Where this street runs
Roncesvalles 248 permits
High Park-Swansea 37 permits
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jun 29, 2026 | Building Permit Related(PS) | Plumbing - PROPOSAL FOR INTERIOR RENOVATIONS ON THE 3RD FLOOR. | — | Open |
| Jun 29, 2026 | Interior Alterations | PROPOSAL FOR INTERIOR RENOVATIONS ON THE 3RD FLOOR. | $100K | Open |
| May 26, 2026 | Building Permit Related(MS) | HVAC - To alter the existing two-and-one-half-storey detached dwelling by constructing third storey dormers (east and west sides), a partial rear one-storey addition, and a rear ground floor deck with stairs. | — | Open |
| May 11, 2026 | Building Permit Related(PS) | Plumbing - To alter the existing two-and-one-half-storey detached dwelling by constructing third storey dormers (east and west sides), a partial rear one-storey addition, and a rear ground floor deck with stairs. | — | Open |
| May 11, 2026 | Multiple Projects | To alter the existing two-and-one-half-storey detached dwelling by constructing third storey dormers (east and west sides), a partial rear one-storey addition, and a rear ground floor deck with stairs. | $500K | Open |
| Mar 30, 2026 | Back Water Valve (Sewer only) | Proposal to install Back Water Valve | — | Closed |
| Feb 19, 2026 | Multiple Projects | REV01: Proposed revision to ground floor demolition of existing interior walls and construction of new interior partitions. Proposal for multiple projects including underpinning of existing basement and crawl space including but not limited to: new window well, walkout, interior stair, new mechanica | — | Open |
| May 22, 2025 | Building Permit Related(MS) | HVAC - Underpin existing basement and crawlspace, relocate basement plumbing fixtures and HVAC. | — | Closed |
| May 14, 2025 | Building Permit Related (DR) | Drain - Underpin existing basement and crawlspace, relocate basement plumbing fixtures and HVAC. | — | Closed |
| May 14, 2025 | Multiple Projects | Underpin existing basement and crawlspace, relocate basement plumbing fixtures and HVAC. | $120K | Closed |
| May 14, 2025 | Party Wall Admin Permits | Administrative party wall permit - underpin shared foundation wall between 16/14 Marion | $1K | Closed |
| May 14, 2025 | Building Permit Related(PS) | Plumbing - Underpin existing basement and crawlspace, relocate basement plumbing fixtures and HVAC. | — | Closed |
| May 13, 2025 | Building Permit Related(MS) | Revision: Removed furnace schedules and added split heat pump schedules. Added Erv and duct heater schedules. Removed furnace and all associated ductwork & grills. Added split head pumps for each unit and associated outdoor condensers. Added ERV and duct heater for each unit | — | Closed |
| May 12, 2025 | Party Wall Admin Permits | Administrative Permit to Underpin Shared Party Wall (9.5m) to the Work at 64 MARION STREET | $20K | Closed |
| May 12, 2025 | Building Permit Related(PS) | Plumbing - Proposal for Basement Underpinning | — | Open |
| May 12, 2025 | Underpinning | Proposal for Basement Underpinning | $20K | Open |
| May 12, 2025 | Building Permit Related (DR) | Drain - Proposal for Basement Underpinning | — | Open |
| Apr 11, 2025 | Interior Alterations | Rev 02 - Revised permit for backyard shed.Revision 01: modified rear deckInterior renovations to existing two and half storey brick dwelling. Rear ground floor deck and rear basement walkout. Demolition of existing rear 1-storey addition. | — | Closed |
| Mar 19, 2025 | Building Permit Related(PS) | Plumbing - PROPOSED SHED DORMER ADDITION | — | Open |
| Mar 19, 2025 | Addition(s) | PROPOSED SHED DORMER ADDITION | $20K | Open |
| Feb 13, 2025 | Multiple Projects | REVISION - revised layout and additionProposal for a 2 storey rear addition, interior alterations and convert back to a SFD dwelling.See also 24 165861 ZAP and 24 172233 MV. | — | Closed |
| Feb 7, 2025 | Building Permit Related(MS) | HVAC - Proposal for a 2 storey rear addition, interior alterations and convert back to a SFD dwelling.See also 24 165861 ZAP and 24 172233 MV. | — | Closed |
| Jan 27, 2025 | Building Permit Related (DR) | Drain - Convert the existing dwelling to a duplex dwelling | — | Closed |
| Jan 27, 2025 | Multiple Projects | Convert the existing dwelling to a duplex dwelling | $50K | Open |
| Jan 27, 2025 | Building Permit Related(PS) | Plumbing - Convert the existing dwelling to a duplex dwelling | — | Open |
| Dec 5, 2024 | Building Permit Related(PS) | Plumbing - Proposal for a 2 storey rear addition, interior alterations and convert back to a SFD dwelling.See also 24 165861 ZAP and 24 172233 MV. | — | Closed |
| Nov 28, 2024 | Back Water Valve (Sewer only) | Proposal to install a backwater valve. | — | Closed |
| Nov 13, 2024 | Building Permit Related(PS) | Plumbing - Proposed construction of a new third storey addition and interior alterations to convert the existing 3-unit dwelling into a 4-unit dwelling. | — | Closed |
| Nov 5, 2024 | Building Permit Related(MS) | HVAC - Proposed construction of a new third storey addition and interior alterations to convert the existing 3-unit dwelling into a 4-unit dwelling. | — | Closed |
| Oct 31, 2024 | Party Wall Admin Permits | Admin permit for the work at 21 Marion St. see applicaiton 24 210659 | — | Open |
| Oct 22, 2024 | Building Permit Related(MS) | HVAC - Proposal for multiple projects including underpinning of existing basement and crawl space including but not limited to: new window well, walkout, interior stair, new mechanical, electrical, & structural components. | — | Open |
| Oct 21, 2024 | Building Permit Related(PS) | Plumbing - Proposal for multiple projects including underpinning of existing basement and crawl space including but not limited to: new window well, walkout, interior stair, new mechanical, electrical, & structural components. | — | Open |
| Oct 8, 2024 | Party Wall Admin Permits | Proposed Administrative/Party wall permit for work at 21 Marion street. See also 24-210659 BLD 00 SR | $300K | Closed |
| Sep 16, 2024 | Other(SR) | Proposed installation of rooftop solar panels | $20K | Closed |
| Aug 27, 2024 | Addition(s) | PROPOSED SHED DORMER ADDITION | $20K | Closed |
| Aug 27, 2024 | Building Permit Related(PS) | Plumbing - PROPOSED SHED DORMER ADDITION | — | Closed |
| Jul 29, 2024 | Interior Alterations | Proposal to add secondary unit in the basement. Convert existing 6 unit dwelling to 7 dwelling uinits. | $5K | Open |
| Jul 24, 2024 | Multiple Projects | REVISION - revised rear exterior stairNEW ONE STORY ADDITION TO REAR AT SOUTH OF BUILDING WITH ROOF-TOPDECK ACCESSED FROM SECOND FLOOR. EXISTING EXTERIOR STAIRS TO BEREMOVED AND REBUILT TO SUIT NEW ADDITION | — | Closed |
| Jun 24, 2024 | Interior Alterations | Convert existing single family dwelling into 4 units | $30K | Open |
| May 16, 2024 | Building Permit Related(MS) | HVAC - NEW ONE STORY ADDITION TO REAR AT SOUTH OF BUILDING WITH ROOF-TOPDECK ACCESSED FROM SECOND FLOOR. EXISTING EXTERIOR STAIRS TO BEREMOVED AND REBUILT TO SUIT NEW ADDITION | — | Closed |
The 40 most recent of 292 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.