Street · 803 of 8,516 by permit count
Building permits on Maple Leaf Dr, North York
The City of Toronto has 224 building permits on record for Maple Leaf Dr in North York, going back to 1995. Those permits created 30 homes and removed 11, a net change of +19. Declared construction value totals $12.2M. Half of the 209 permits issued here came through within 24 days of the application. The most recent permit was applied for Oct 27, 2026 at 472 Maple Leaf Dr.
- Permits on record
- 2241995–2026
- Declared construction value
- $12.2Mas filed, not adjusted
- Homes created
- 30dwelling units
- Homes removed
- 11net +19
- Typical wait
- 24 days3 days faster than the city
Permits issued per year
Zoning
- Most common zone
- RD98.2% of permits · by-law 10.20
- In detached-house zones
- 98.2%60.2% above the city’s 38.0%
- Permits with a zone
- 224of 224 on record
The zoning categories the permits on Maple Leaf Dr fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Minor variances at the Committee of Adjustment
- Applications on record
- 26since 2016
- Approved
- 85.7%5.1% below the city · 21 decided
Some projects on Maple Leaf Dr need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Where this street runs
Other streets in M6L
Looking for one address on Maple Leaf Dr? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 27, 2026 | Building Permit Related(MS) | HVAC - Proposed new garden suite in rear yard of existing single family dwelling | — | Open |
| Aug 19, 2026 | New Building | Revision 03: Proposal to reinstate garage from original permit.Proposal to construct a new two-storey detached dwelling with an integral garage. | — | New build |
| Jun 22, 2026 | Demolition | Proposal to demolish existing Single Family Dwelling and construct new three storey detached houseplex with 4 dwelling units. | — | Demolition |
| Jun 19, 2026 | Building Permit Related(MS) | HVAC - proposed 3 storey 4 plex building | — | Open |
| Jun 19, 2026 | Building Permit Related(PS) | Plumbing - proposed 3 storey 4 plex building | — | Open |
| Jun 19, 2026 | Building Permit Related (DR) | Drain - proposed 3 storey 4 plex building | — | Open |
| Jun 19, 2026 | New Building | Proposal to demolish existing Single Family Dwelling and construct new three storey detached houseplex with 4 dwelling units. | $1.0M | New build |
| Jan 22, 2026 | Multiple Projects | Proposal for interior alteration, and create secondary suite in the basement. | $10K | Open |
| Oct 31, 2025 | New Building | REV: The proposed revision includes adding an entrance door on the east side of the building within the connection space between the garage and the mudroom (see pages A03 and A09).Proposal to demolish existing detached garage due severance and construct a new 2 storey dwelling will integral garage. | — | New build |
| Oct 16, 2025 | Building Permit Related(MS) | HVAC - Proposal to demolish existing detached garage due severance and construct a new 2 storey dwelling will integral garage. | — | Closed |
| Jul 25, 2025 | New Laneway / Rear Yard Suite | Proposed new garden suite in rear yard of existing single family dwelling | $30K | Open |
| Jul 25, 2025 | Building Permit Related(PS) | Plumbing - Proposed new garden suite in rear yard of existing single family dwelling | — | Open |
| Apr 30, 2025 | Building Permit Related (DR) | Drain - Proposal to demolish existing detached garage due severance and construct a new 2 storey dwelling will integral garage. | — | Closed |
| Apr 30, 2025 | Building Permit Related(PS) | Plumbing - Proposal to demolish existing detached garage due severance and construct a new 2 storey dwelling will integral garage. | — | Closed |
| Mar 25, 2025 | New Building | Revision to interior and add brick veneer exterior Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. | — | New build |
| Sep 6, 2024 | Accessory Building(s) | Construction of a rear shed | $20K | Closed |
| Jun 10, 2024 | Garage | Proposed reconstruction of a detached garage in the rear yard of an existing single family detached dwelling. | $20K | Closed |
| Mar 28, 2023 | Multiple Projects | Adding a 30'x12' deck with staircase to the first floor of a bungalow and also adding a set of double doors at the rear of the garage. | $25K | Open |
| Oct 21, 2022 | Back Water Valve (Sewer only) | bwv installation | — | Closed |
| Oct 14, 2022 | Walk-Out Stair | To add an exit with stairs from basement | $15K | Closed |
| Oct 29, 2021 | Building Permit Related(MS) | HVAC - Proposal to demolish existing dwelling and contruct a new two storey dwelling with integral garage | — | Closed |
| Oct 12, 2021 | Demolition | Proposal to demolish existing dwelling and contruct a new two storey dwelling with integral garage | — | Demolition |
| Oct 12, 2021 | Building Permit Related (DR) | Drain - Proposal to demolish existing dwelling and contruct a new two storey dwelling with integral garage | — | Closed |
| Oct 12, 2021 | Building Permit Related(PS) | Plumbing - Proposal to demolish existing dwelling and contruct a new two storey dwelling with integral garage | — | Closed |
| Oct 12, 2021 | New Building | Proposal to demolish existing dwelling and contruct a new two storey dwelling with integral garage | $1.0M | New build |
| Jul 29, 2021 | Multiple Projects | Proposal for interior alteration to the existing Residential Suite in an existing Place of Worship, and new Awning to the rear door. | $25K | Closed |
| Jun 2, 2021 | Building Permit Related (DR) | Drain - Application processed as a new houseProposal for a 1 storey addition and interior alterations to convert existing 1 storey storage building to a single family dwelling on newly severed lot. See also 20 171 372 ZPR, 20 171868 CO and 20 171957 MV. Future address is 337 Maple Leaf Dr. | — | Closed |
| Jun 2, 2021 | New Building | Application processed as a new houseProposal for a 1 storey addition and interior alterations to convert existing 1 storey storage building to a single family dwelling on newly severed lot. See also 20 171 372 ZPR, 20 171868 CO and 20 171957 MV. Future address is 337 Maple Leaf Dr. | $45K | New build |
| Jun 2, 2021 | Building Permit Related(PS) | Plumbing - Application processed as a new houseProposal for a 1 storey addition and interior alterations to convert existing 1 storey storage building to a single family dwelling on newly severed lot. See also 20 171 372 ZPR, 20 171868 CO and 20 171957 MV. Future address is 337 Maple Leaf Dr. | — | Closed |
| Apr 22, 2021 | Fire Damage | Proposed Fire Damage Restoration. | — | Closed |
| Apr 15, 2021 | Demolition | Proposal to demolish the existing 2 storey SFD-detached dwelling on the same lot as existing Place of Worship. Demolition will allow for additional parking area for the church. | — | Demolition |
| Apr 1, 2021 | Demolition | Proposal to demolish the existing 2 storey SFD-detached dwelling. | — | Demolition |
| Apr 1, 2021 | Building Permit Related (DR) | Drain - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 21 129242 DEM and 20 183622 ZZC. | — | Closed |
| Apr 1, 2021 | Building Permit Related(PS) | Plumbing - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 21 129242 DEM and 20 183622 ZZC. | — | Closed |
| Nov 19, 2020 | Deck | Rev 02 - Revision to deck see bubble area on plans.Rear deck and opening in rear wall | — | Open |
| Nov 9, 2020 | Addition(s) | Demolish existing rear attached green house and build a one storey unheated sunroom addition. | $80K | Closed |
| Nov 6, 2020 | Back Water Valve (Sewer only) | Proposal to install a back water valve | — | Closed |
| Jul 13, 2020 | Back Water Valve (Sewer only) | Proposal to install a back water valve on the sanitary line. | — | Closed |
| Jul 8, 2020 | Back Water Valve (Sewer only) | Back Water Valve | — | Closed |
| May 25, 2020 | Porch | PROPOSED: PARTIAL ENCLOSURE OF FRONT PORCH AND CONSTRUCT A WHEEL CHAIR RAMP IN THE FRONT YARD | $40K | Closed |
The 40 most recent of 224 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Maple Leaf Dr with a permit on record · 84
- 5 Maple Leaf Dr6 permits · to 2021
- 10 Maple Leaf Dr4 permits · to 2019
- 117 Maple Leaf Dr1 permit · to 2015
- 121 Maple Leaf Dr1 permit · to 2001
- 125 Maple Leaf Dr1 permit · to 2013
- 126 Maple Leaf Dr1 permit · to 2005
- 128 Maple Leaf Dr6 permits · to 2002
- 130 Maple Leaf Dr1 permit · to 2020
- 132 Maple Leaf Dr1 permit · to 2019
- 133 Maple Leaf Dr2 permits · to 2013
- 176 Maple Leaf Dr1 permit · to 2021
- 200 Maple Leaf Dr2 permits · to 1999
- 204 Maple Leaf Dr3 permits · to 2007
- 206 Maple Leaf Dr3 permits · to 2007
- 215 Maple Leaf Dr3 permits · to 2000
- 230 Maple Leaf Dr1 permit · to 1997
- 231 Maple Leaf Dr1 permit · to 2003
- 241 Maple Leaf Dr5 permits · to 2023
- 242 Maple Leaf Dr1 permit · to 2020
- 250 Maple Leaf Dr2 permits · to 2024
- 253 Maple Leaf Dr1 permit · to 2014
- 255 Maple Leaf Dr1 permit · to 2013
- 256 Maple Leaf Dr1 permit · to 2014
- 263 Maple Leaf Dr1 permit · to 2015
- 264 Maple Leaf Dr3 permits · to 2004
- 277 Maple Leaf Dr1 permit · to 2014
- 279 Maple Leaf Dr2 permits · to 2013
- 280 Maple Leaf Dr5 permits · to 2001
- 281 Maple Leaf Dr1 permit · to 2013
- 282 Maple Leaf Dr3 permits · to 2001
- 283 Maple Leaf Dr1 permit · to 2013
- 284 Maple Leaf Dr4 permits · to 2000
- 286 Maple Leaf Dr3 permits · to 2000
- 288 Maple Leaf Dr1 permit · to 1998
- 299 Maple Leaf Dr3 permits · to 2007
- 315 Maple Leaf Dr7 permits · to 2020
- 316 Maple Leaf Dr2 permits · to 2016
- 317 Maple Leaf Dr6 permits · to 2026
- 318 Maple Leaf Dr5 permits · to 2019
- 319 Maple Leaf Dr1 permit · to 2015
- 326 Maple Leaf Dr5 permits · to 2016
- 327 Maple Leaf Dr1 permit · to 2020
- 332 Maple Leaf Dr3 permits · to 2001
- 336 Maple Leaf Dr4 permits · to 2014
- 337 Maple Leaf Dr4 permits · to 2025
- 339 Maple Leaf Dr3 permits · to 2021
- 341 Maple Leaf Dr6 permits · to 2008
- 345 Maple Leaf Dr1 permit · to 2000
- 346 Maple Leaf Dr4 permits · to 2001
- 348 Maple Leaf Dr3 permits · to 2002
- 350 Maple Leaf Dr1 permit · to 1998
- 351 Maple Leaf Dr5 permits · to 2018
- 355 Maple Leaf Dr1 permit · to 2026
- 359 Maple Leaf Dr3 permits · to 2012
- 361 Maple Leaf Dr7 permits · to 2016
- 377 Maple Leaf Dr2 permits · to 2005
- 379 Maple Leaf Dr1 permit · to 1998
- 386 Maple Leaf Dr5 permits · to 2021
- 393 Maple Leaf Dr4 permits · to 2018
- 403 Maple Leaf Dr1 permit · to 2003
- 406 Maple Leaf Dr2 permits · to 2016
- 410 Maple Leaf Dr4 permits · to 2001
- 412 Maple Leaf Dr10 permits · to 2018
- 415 Maple Leaf Dr1 permit · to 2016
- 418 Maple Leaf Dr5 permits · to 2015
- 421 Maple Leaf Dr1 permit · to 2022
- 424 Maple Leaf Dr1 permit · to 2004
- 428 Maple Leaf Dr5 permits · to 2026
- 429 Maple Leaf Dr4 permits · to 2025
- 438 Maple Leaf Dr2 permits · to 2022
- 459 Maple Leaf Dr1 permit · to 2021
- 461 Maple Leaf Dr1 permit · to 2018
- 462 Maple Leaf Dr1 permit · to 2019
- 463 Maple Leaf Dr1 permit · to 2014
- 464 Maple Leaf Dr1 permit · to 1999
- 472 Maple Leaf Dr3 permits · to 2026
- 477 Maple Leaf Dr1 permit · to 2024
- 479 Maple Leaf Dr1 permit · to 2016
- 481 Maple Leaf Dr1 permit · to 2013
- 485 Maple Leaf Dr1 permit · to 2019
- 487 Maple Leaf Dr1 permit · to 2020
- 488 Maple Leaf Dr1 permit · to 2000
- 490 Maple Leaf Dr4 permits · to 2011
- 500 Maple Leaf Dr9 permits · to 2018