thepermitmap

Street · 7123 of 8,516 by permit count

Building permits on Lockmere Ter, North York

The City of Toronto has 9 building permits on record for Lockmere Ter in North York, going back to 2001. Those permits created 1 homes and removed 1, a net change of +0. Declared construction value totals $563K. The most recent permit was issued Sep 29, 2026 at 29 Lockmere Ter.

Permits on record
92001–2026
Declared construction value
$563Kas filed, not adjusted
Homes created
1dwelling units
Homes removed
1net +0

Permits issued per year

20012026 (part year)

Most common work

Structures worked on

Postal areas

Other streets in M2J

Ringwood Cres10 permits
Rock Fernway10 permits
Chalet Rd9 permits
Flintwood Crt9 permits
Salinger Crt8 permits
Taverly Rd8 permits
Woody Vineway8 permits

Looking for one address on Lockmere Ter? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Sep 29, 2026 Back Water Valve (Sewer only) Back watervalve — Closed
Aug 9, 2017 Demolition Demolish existing one storey single family detached dwelling (154.47m2) — Demolition
Aug 9, 2017 Building Permit Related (DR) Drain - Construction of a new two storey single family detached dwelling (390m2) with integral at grade garage and finished basement area (163.23m2) — Closed
Aug 9, 2017 New Building Construction of a new two storey single family detached dwelling (390m2) with integral at grade garage and finished basement area (163.23m2) $500K New build
Aug 9, 2017 Building Permit Related(PS) Plumbing - Construction of a new two storey single family detached dwelling (390m2) with integral at grade garage and finished basement area (163.23m2) — Closed
Jul 4, 2012 Other(SR) Install solar panels on the roof $35K Closed
Jun 8, 2011 Porch Proposed porch on flanking yard $20K Open
May 31, 2006 Other(PS) Install a 4" mainline backwater valve $2K Closed
May 31, 2001 Walk-Out Stair BASEMENT WALKOUT $6K Closed

The 9 most recent of 9 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Lockmere Ter with a permit on record · 6

  • 5 Lockmere Ter1 permit · to 2011
  • 8 Lockmere Ter4 permits · to 2017
  • 12 Lockmere Ter1 permit · to 2006
  • 15 Lockmere Ter1 permit · to 2001
  • 27 Lockmere Ter1 permit · to 2012
  • 29 Lockmere Ter1 permit · to 2026
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
9
Data through
2026-09-30
Refresh
Daily from the City
Sheet
STR-706