thepermitmap

Street · 5061 of 8,516 by permit count

Building permits on Lindner St

The City of Toronto has 24 building permits on record for Lindner St, going back to 2002. Those permits created 4 homes and removed 2, a net change of +2. Declared construction value totals $310K. Half of the 23 permits issued here came through within 14 days of the application. The most recent permit was issued Jul 16, 2024 at 50 Lindner St.

Permits on record
242002–2024
Declared construction value
$310Kas filed, not adjusted
Homes created
4dwelling units
Homes removed
2net +2
Typical wait
14 days13 days faster than the city

Permits issued per year

20022024 (part year)

Other streets in M6N

Duern St25 permits
Marshall Blvd25 permits
Arnold Ave24 permits
Exeter St24 permits
Junction Rd23 permits
Leigh St23 permits
Handel St21 permits

Looking for one address on Lindner St? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Jul 16, 2024 Demolition Proposed demolition of existing building — Demolition
Jul 16, 2024 Demolition Proposed demolition of building — Demolition
Jan 25, 2022 Interior Alterations Proposal for interior alterations to convert existing 2 unit dwelling to a 3 unit dwelling. $15K Closed
Jan 25, 2022 Interior Alterations Proposal for interior alteration to convert existing 2 unit dwelling to a 3 unit dwelling. $15K Closed
Apr 19, 2021 New Building - By Renovation REV01: changes to 2nd floor layout (added bar sink). — New build
Apr 15, 2021 Multiple Projects REV02: changes to 2nd floor layout (adding bar sink) — Closed
Oct 20, 2020 Building Permit Related(MS) Revision#01 - HVAC - Changes to interior ductwork layout.HVAC - Proposal to remedy existing unsafe order of demolishing more than 50% of the ground floor exterior walls contrary to issued permit plans in proposed new 2 units semi-detached dwelling. Please refer to 19-138496 BLD 00 SR - Refer to Orde — Closed
Oct 14, 2020 Building Permit Related(MS) Revision #01 - HVAC - Changes to interior ductwork layout.HVAC - Construct a 2nd unit in the basement (75m2), addition to dwelling (75m2), interior alterations (75m2) and a basement walkout — Closed
May 10, 2019 Building Permit Related (DR) Drain - Install Mainline backwater vavleConstruct a 2nd unit in the basement (75m2), addition to dwelling (75m2), interior alterations (75m2) and a basement walkout — Closed
May 10, 2019 Building Permit Related(PS) Plumbing - Construct a 2nd unit in the basement (75m2), addition to dwelling (75m2), interior alterations (75m2) and a basement walkout — Closed
May 9, 2019 Building Permit Related (DR) Drain - Install mainline backwater vavle Construct addition (80m2), interior alterations (80m2) finished basement for 2nd suite (80m2) and basement walkout — Closed
May 9, 2019 Multiple Projects Construct addition (80m2), interior alterations (80m2) finished basement for 2nd suite (80m2) and basement walkout $150K Closed
May 9, 2019 Building Permit Related(PS) Plumbing - Construct addition (80m2), interior alterations (80m2) finished basement for 2nd suite (80m2) and basement walkout — Closed
Jun 2, 2017 Garage Adding new concrete block garage at rear yard $15K Closed
Jul 4, 2014 Back Water Valve (Sewer only) Installation of one fullport mainline backwater valve — Closed
May 1, 2013 Building Permit Related(PS) Plumbing - Proposal for new subfloor on main floor and new 2 piece washroom — Closed
May 1, 2013 Interior Alterations Proposal for new subfloor on main floor and new 2 piece washroom $4K Closed
Jul 2, 2003 Fixtures/Roof Drains: SFD install new 4" sanitary drain. See plans. Cost included with B.P.#02-154514 3/4" water service $1K Closed
Jul 2, 2003 Building Permit Related(PS) install new plumbing fixtures and 4" sanitary drain. See fixture schedule attached and plans.3/4"water service) — Closed
Jun 20, 2003 Building Permit Related(PS) isntall new plumbing fixtures. See fixture schedule attached. — Closed
Feb 17, 2003 Building Permit Related(MS) HVAC- Install h,.v.a.c. system - New Building - for plan refer to 02-154514. — Closed
Feb 17, 2003 Building Permit Related(MS) HVAC - Install h.v.a.c. system - new building see 02 - 154532 (HVA) for plans — Closed
Nov 19, 2002 New Building construct semi detached house, for plans see 1 ibms application # 02-154514 see c of a final & binding SURVEY APPROVED. $55K New build
Nov 19, 2002 New Building construct semi detached house, see c of a final & binding $55K New build

The 24 most recent of 24 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Lindner St with a permit on record · 8

  • 27 Lindner St3 permits · to 2003
  • 29 Lindner St4 permits · to 2003
  • 43 Lindner St1 permit · to 2017
  • 44 Lindner St6 permits · to 2022
  • 45 Lindner St3 permits · to 2014
  • 46 Lindner St5 permits · to 2022
  • 50 Lindner St1 permit · to 2024
  • 52 Lindner St1 permit · to 2024
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
24
Data through
2024-08-16
Refresh
Daily from the City
Sheet
STR-906