Street · 3107 of 8,567 by permit count
Building permits on John Tabor Trl
The City of Toronto has 54 building permits on record for John Tabor Trl, going back to 1999. Those permits created 5 homes and removed 0, a net change of +5. Declared construction value totals $8.4M. The most recent permit was issued Jul 22, 2026 at 138 John Tabor Trl.
- Permits on record
- 541999–2026
- Declared construction value
- $8.4Mas filed, not adjusted
- Homes created
- 5dwelling units
- Homes removed
- 0net +5
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jul 22, 2026 | Building Permit Related (DR) | Drain - Proposal to construct a below grade entrance from side yard and enlarging 4 windows. | — | Open |
| Jul 22, 2026 | Multiple Projects | Proposal to construct a below grade entrance from side yard and enlarging 4 windows. | $19K | Open |
| Jun 30, 2026 | Interior Alterations | Proposal for interior alterations to create 2 additional units to the existing detached SFD. | $50K | Open |
| Jun 30, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to create 2 additional units to the existing detached SFD. | — | Open |
| May 20, 2026 | Addition(s) | Proposal for carport addition | $100K | Closed |
| Mar 19, 2024 | Building Permit Related(PS) | Plumbing - Renovation of four existing boys and girls washrooms on the 1st and 2nd floors with new interior finishes and plumbing fixtures. | — | Closed |
| Mar 19, 2024 | Building Permit Related(MS) | HVAC - Renovation of four existing boys and girls washrooms on the 1st and 2nd floors with new interior finishes and plumbing fixtures. | — | Closed |
| Mar 12, 2024 | Interior Alterations | Renovation of four existing boys and girls washrooms on the 1st and 2nd floors with new interior finishes and plumbing fixtures. | $175K | Closed |
| Jun 6, 2023 | Fire Alarm | Upgrade of the existing fire alarm system, work will involve installing new fire alarm system devices while the existing system remains operational upon completion of installation of all new devices, a switchover will take place to the new sstem then the existing system will be removed. | $200K | Open |
| Mar 16, 2023 | Building Permit Related(MS) | HVAC - Designing a basement as per OBC in order to make a legal basement. | — | Open |
| Feb 28, 2023 | Building Permit Related(PS) | Plumbing - Designing a basement as per OBC in order to make a legal basement. | — | Open |
| Jan 26, 2023 | Fire Alarm | Fire alarm control panel replacement and addition of new signaling devices | $200K | Closed |
| Nov 8, 2022 | Second Suite (New) | Designing a basement as per OBC in order to make a legal basement. | $35K | Open |
| Nov 3, 2021 | Building Permit Related(PS) | Plumbing - Proposal to convert basement to 2nd suite | — | Closed |
| Oct 7, 2021 | Inside and Outside Drains | Drain - construct a 1 storey addition for additional childcare classrooms to an existing school - Emily Carr Public School | $50K | Closed |
| Oct 7, 2021 | Building Permit Related(MS) | HVAC - construct a 1 storey addition for additional childcare classrooms to an existing school - Emily Carr Public School | — | Closed |
| Oct 1, 2021 | Addition(s) | construct a 1 storey addition for additional childcare classrooms to an existing school - Emily Carr Public School | $5.0M | Closed |
| Sep 29, 2021 | Building Permit Related(PS) | Plumbing - construct a 1 storey addition for additional childcare classrooms to an existing school - Emily Carr Public School | — | Closed |
| Sep 20, 2021 | Second Suite (New) | Proposal to convert basement to 2nd suite | $90K | Open |
| Mar 30, 2021 | Fire Alarm | Replacement of Fire Alarm Control Panel | $7K | Open |
| Feb 26, 2021 | Building Permit Related(MS) | HVAC - Proposed: Installation of new emergency cooling centre in the library. The cooling centre consists of a VRF system using ceiling mounted, cassette type evaporator units and roof mounted condensing units. | — | Closed |
| Feb 23, 2021 | Other(BA) | Proposed: Installation of new emergency cooling centre in the library. The cooling centre consists of a VRF system using ceiling mounted, cassette type evaporator units and roof mounted condensing units. | $106K | Closed |
| Sep 2, 2020 | Building Permit Related(PS) | Plumbing - Proposal to construct a 2nd storey addition, interior alterations, new carport, front and side porches and new balconies at the front and rear of the existing single family dwelling. | — | Open |
| Sep 2, 2020 | Multiple Projects | Proposal to construct a 2nd storey addition, interior alterations, new carport, front and side porches and new balconies at the front and rear of the existing single family dwelling. | $300K | Open |
| Feb 10, 2020 | Other(BA) | Proposal to replace deteriorated foundation wall blocks at local areas along top course. | $100K | Open |
| Nov 1, 2017 | Building Permit Related(PS) | Plumbing - nterior Renovations to Existing St Columba School for Childcare Centre | — | Closed |
| Nov 1, 2017 | Building Permit Related(MS) | HVAC - nterior Renovations to Existing St Columba School for Childcare Centre | — | Closed |
| Oct 26, 2017 | Interior Alterations | Interior Renovations to Existing St Columba School for Childcare Centre | $1.3M | Closed |
| Jun 7, 2017 | Addition(s) | Proposal to construct a 1 storey addition on the side of an existing 2 unit dwelling. | $10K | Open |
| Oct 11, 2016 | Back Water Valve (Sewer only) | Proposal to install a new back water valve | — | Closed |
| Nov 6, 2015 | Second Suite (New) | Proposal for interior alterations to create a second suite in the basement of an existing 1 storey SFD-detached dwelling. | $50K | Closed |
| Jul 8, 2015 | Interior Alterations | Proposal for interior alterations to repair damage caused by a fire. | $19K | Closed |
| Oct 14, 2014 | Solar Collector | Proposal to Install 3 Rooftop Photovoltaic Arrays on Exisitng Building - "Emily Carr Public School" | $65K | Closed |
| Jun 18, 2013 | Building Permit Related(PS) | Plumbing - interior alterations to classrooms for all day kindergarten - adding a washroom and cubbies | — | Closed |
| Jun 18, 2013 | Building Permit Related(MS) | HVAC - interior alterations to classrooms for all day kindergarten - adding a washroom and cubbies | — | Closed |
| Jun 18, 2013 | Interior Alterations | interior alterations to classrooms for all day kindergarten - adding a washroom and cubbiesEMILY CARR P.S. | $200K | Open |
| May 13, 2013 | Building Permit Related(PS) | Plumbing - interior alteration for all day kindergarten | — | Closed |
| May 13, 2013 | Building Permit Related(MS) | HVAC - interior alteration for all day kindergarten | — | Closed |
| May 13, 2013 | Interior Alterations | FDK interior alteration for all day kindergarten, St. Columba C.S. | $135K | Open |
| May 12, 2013 | Carport | REV. #1- enlarging carport Carport | — | Closed |
The 40 most recent of 54 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.