Street · 1397 of 8,565 by permit count
Building permits on Humber Blvd
The City of Toronto has 139 building permits on record for Humber Blvd, going back to 2000. Those permits created 2 homes and removed 0, a net change of +2. Declared construction value totals $13.6M. The most recent permit was applied for Jun 1, 2026 at 56 Humber Blvd.
- Permits on record
- 1392000–2026
- Declared construction value
- $13.6Mas filed, not adjusted
- Homes created
- 2dwelling units
- Homes removed
- 0net +2
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jun 1, 2026 | Building Permit Related(PS) | Plumbing - To construct a rear two storey addition to existing dwelling | — | Open |
| May 29, 2026 | Multiple Projects | To construct a rear two storey addition to existing dwelling | $50K | Open |
| Feb 20, 2026 | Sign Building Permit Related | 1 Groun Sign | — | Open |
| Jan 30, 2026 | Fire Damage | Repair and reinstate a portion of the dwelling due to fire damage | — | Open |
| Aug 18, 2025 | Sign Building Permit Related | 1 Ground Sign | — | Closed |
| Jun 15, 2023 | Building Permit Related(MS) | HVAC - PARTITION CHANGES, NEW WASHROOM, NEW STUDENT KITCHEN FOR ME/DD PROGRAM | — | Closed |
| Jun 14, 2023 | Building Permit Related(PS) | Plumbing - PARTITION CHANGES, NEW WASHROOM, NEW STUDENT KITCHEN FOR ME/DD PROGRAM | — | Closed |
| May 16, 2023 | Multiple Projects | PARTITION CHANGES, NEW WASHROOM, NEW STUDENT KITCHEN FOR ME/DD PROGRAM | $420K | Closed |
| Feb 7, 2023 | Other(BA) | Isolated repairs to the fire damaged balcony structure and replacement of existing damaged railing with new aluminum railing. | $15K | Open |
| Jan 6, 2023 | Garage Repair/Reconstruction | Wholesale waterproofing system and overburden replacement, localized concrete repairs, ramp roofing replacement, drain replacement | $1.5M | Open |
| Nov 30, 2022 | Building Permit Related(MS) | HVAC - Proposal to replace emergency generator in secondary school. Replacement of the existing 60kW emergency diesel generator with a new 80kW emergency gas generator. The existing ATS and emergency distribution system to be upgraded/modified as shown in the design package. | — | Open |
| Nov 30, 2022 | Other(BA) | Proposal to replace emergency generator in secondary school. Replacement of the existing 60kW emergency diesel generator with a new 80kW emergency gas generator. The existing ATS and emergency distribution system to be upgraded/modified as shown in the design package. | $300K | Open |
| Apr 5, 2022 | Other(BA) | Proposal to construct two new exterior stairs to meet OBC requirements. | $50K | Closed |
| Mar 4, 2022 | Other(BA) | Replace two existing heating boilers with four new heating boilers include all piping and pumps. | $400K | Open |
| Mar 4, 2022 | Building Permit Related(MS) | HVAC - Replace two existing heating boilers with four new heating boilers include all piping and pumps. | — | Open |
| Jan 28, 2022 | Backflow Prevention Devices (Water only) | Proposal to install new backwater preventer valve before the outlet of the main drainage line. The intention of the project is to address the flooding inside the basement area of the buildings during heavy storm and rainfall events, due to water backflowing from the drainage lines. | $500K | Closed |
| Jan 28, 2022 | Backflow Prevention Devices (Water only) | Proposal to install new backwater preventer valve before the outlet of the main drainage line. The intention of the project is to address the flooding inside the basement area of the buildings during heavy storm and rainfall events, due to water backflowing from the drainage lines. | $500K | Closed |
| Jan 28, 2022 | Backflow Prevention Devices (Water only) | Proposal to install new backwater preventer valve before the outlet of the main drainage line. The intention of the project is to address the flooding inside the basement area of the buildings during heavy storm and rainfall events, due to water backflowing from the drainage lines. | $500K | Closed |
| Jan 28, 2022 | Backflow Prevention Devices (Water only) | Proposal to install new backwater preventer valve before the outlet of the main drainage line. The intention of the project is to address the flooding inside the basement area of the buildings during heavy storm and rainfall events, due to water backflowing from the drainage lines. | $500K | Closed |
| Jan 28, 2022 | Backflow Prevention Devices (Water only) | Proposal to install new backwater preventer valve before the outlet of the main drainage line. The intention of the project is to address the flooding inside the basement area of the buildings during heavy storm and rainfall events, due to water backflowing from the drainage lines. | $500K | Closed |
| Jan 28, 2022 | Backflow Prevention Devices (Water only) | Proposal to install new backwater preventer valve before the outlet of the main drainage line. The intention of the project is to address the flooding inside the basement area of the buildings during heavy storm and rainfall events, due to water backflowing from the drainage lines. | $500K | Closed |
| Jan 28, 2022 | Backflow Prevention Devices (Water only) | Proposal to install new backwater preventer valve before the outlet of the main drainage line. The intention of the project is to address the flooding inside the basement area of the buildings during heavy storm and rainfall events, due to water backflowing from the drainage lines. | $500K | Closed |
| Jan 28, 2022 | Backflow Prevention Devices (Water only) | Proposal to install new backwater preventer valve before the outlet of the main drainage line. The intention of the project is to address the flooding inside the basement area of the buildings during heavy storm and rainfall events, due to water backflowing from the drainage lines. | $500K | Closed |
| Jan 28, 2022 | Backflow Prevention Devices (Water only) | Proposal to install new backwater preventer valve before the outlet of the main drainage line. The intention of the project is to address the flooding inside the basement area of the buildings during heavy storm and rainfall events, due to water backflowing from the drainage lines. | $500K | Closed |
| Jan 28, 2022 | Backflow Prevention Devices (Water only) | Proposal to install new backwater preventer valve before the outlet of the main drainage line. The intention of the project is to address the flooding inside the basement area of the buildings during heavy storm and rainfall events, due to water backflowing from the drainage lines. | $500K | Closed |
| Jan 13, 2022 | Alternative Solution | Proposal is to install new backflow preventer valve before the outlet of the main drainage line for the 8-unit housing block. The intention of the project is to address the repeated flooding issues inside the basement area of the buildings during heavy storm and rainfall events, due to sewage backfl | — | Closed |
| Oct 22, 2021 | Back Water Valve (Sewer only) | Proposal to install back water valve (sewer only). | — | Closed |
| Sep 24, 2021 | Building Permit Related(MS) | HVAC - Replace diesel life safety generator with natural gas fired | — | Closed |
| Aug 27, 2021 | Other(BA) | Replace diesel life saftey generator with natural gas fired rooftop penthouse mechanical room and ground floor electrical room | $150K | Closed |
| Mar 31, 2021 | Building Permit Related(MS) | HVAC - Install 3 x 35 kW Load Displacement Combined Heat and Power (CHP) Units on the roof and connect to existing electrical and hydronic heating systems. | — | Closed |
| Mar 31, 2021 | Other(BA) | Install 3 x 35 kW Load Displacement Combined Heat and Power (CHP) Units on the roof and connect to existing electrical and hydronic heating systems. | $150K | Closed |
| Aug 10, 2020 | Back Water Valve (Sewer only) | INSTALLATION OF A BACKWATER VALVE FOR EXISTING SFD | — | Closed |
| Jul 13, 2020 | Building Permit Related(PS) | Plumbing - Proposal to renovate the existing superintendent office and staff spaces to create revised tenant interaction counter and staff spaces; including designated staff washrooms. | — | Closed |
| Jul 13, 2020 | Interior Alterations | Proposal to renovate the existing superintendent office and staff spaces to create revised tenant interaction counter and staff spaces; including designated staff washrooms. | $112K | Open |
| Jul 13, 2020 | Building Permit Related(MS) | HVAC - Proposal to renovate the existing superintendent office and staff spaces to create revised tenant interaction counter and staff spaces; including designated staff washrooms. | — | Open |
| Jul 9, 2020 | Building Permit Related(PS) | Plumbing - Proposal to renovate the existing underutilized, superintendent and staff spaces to create community service hub office space. Renovations will include new tenant meeting room, staff showers and new barrier-free washroom. | — | Closed |
| Jul 9, 2020 | Interior Alterations | Proposal to renovate the existing underutilized, superintendent and staff spaces to create community service hub office space. Renovations will include new tenant meeting room, staff showers and new barrier-free washroom. | $517K | Open |
| Jul 9, 2020 | Building Permit Related(MS) | HVAC - Proposal to renovate the existing underutilized, superintendent and staff spaces to create community service hub office space. Renovations will include new tenant meeting room, staff showers and new barrier-free washroom. | — | Open |
| May 5, 2020 | Other(BA) | Proposal to construct new accessibility ramp and replace front entrance stairs to existing building 10. | $40K | Closed |
| Nov 1, 2019 | Back Water Valve (Sewer only) | Proposal to install backwater valve in underground existing saintary main | — | Open |
The 40 most recent of 139 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.