Street · 1889 of 8,516 by permit count
Building permits on Harrison Rd, North York
The City of Toronto has 103 building permits on record for Harrison Rd in North York, going back to 1998. Those permits created 4 homes and removed 2, a net change of +2. Declared construction value totals $5.1M. Half of the 101 permits issued here came through within 17 days of the application. The most recent permit was issued May 5, 2026 at 60 Harrison Rd.
- Permits on record
- 1031998–2026
- Declared construction value
- $5.1Mas filed, not adjusted
- Homes created
- 4dwelling units
- Homes removed
- 2net +2
- Typical wait
- 17 days10 days faster than the city
Permits issued per year
Zoning
- Most common zone
- RD100.0% of permits · by-law 10.20
- In detached-house zones
- 100.0%62.0% above the city’s 38.0%
- Permits with a zone
- 90of 103 on record
The zoning categories the permits on Harrison Rd fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M2L
Looking for one address on Harrison Rd? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| May 5, 2026 | Interior Alterations | Alteration interior and removing bearing wall | $60K | Open |
| Apr 7, 2026 | Interior Alterations | REVISION 01: To add entrance and windows in the garage and master ensuite. Proposal for Interior Alterations | — | Open |
| Feb 27, 2026 | Building Permit Related(PS) | Plumbing - Proposal for Interior Alterations | — | Open |
| Sep 30, 2024 | Back Water Valve (Sewer only) | Proposal to install a back water valve and sump pump | — | Open |
| Sep 23, 2024 | Back Water Valve (Sewer only) | Proposal to install a backwater valve on the sanitary line in an existing SFD-detached dwelling. | — | Closed |
| Sep 20, 2024 | Back Water Valve (Sewer only) | Proposal to install backwater valve | — | Closed |
| Aug 19, 2024 | Back Water Valve (Sewer only) | Back Water Valve | — | Open |
| Jul 30, 2024 | Back Water Valve (Sewer only) | Back Water Valve | — | Open |
| Mar 22, 2024 | Other(SR) | Proposal to install 24 rooftop solar panels. | $20K | Closed |
| Jan 26, 2024 | Other(SR) | Revision 02: Proposal to revise layoutReviison01: Alterations (removal of interior/exterior walls in 1st floor) to existing side split detached house.Interior renovation including removal of load bearing wall, enlarge three window/door openings on west elevation, and add one window on south elevatio | — | Closed |
| Jan 26, 2024 | Building Permit Related(MS) | Revision 01: Proposal to revise layoutHVAC - Interior renovation including removal of load bearing wall, enlarge three window/door openings on west elevation, and add one window on south elevation | — | Closed |
| Sep 14, 2023 | Interior Alterations | Proposal for interior alterations including adding an elevator in an existing SFD-detached dwelling. | $85K | Open |
| Jun 9, 2023 | Interior Alterations | Interior alterations to remove load bearing/non-load bearing wall on ground floor | $15K | Closed |
| Feb 13, 2023 | Multiple Projects | Revision 01 - floor and roof framing changed, existing stair was retained and footing changedProposal for a second floor addition, interior alterations and a finished basement 19.32 Q.M. ground Floor Area: 29.47 SQ.M., Second Floor Area: 34.03 SQ.M. addition / and 33.59 SQ.M. interior alterations.To | — | Open |
| Nov 8, 2022 | Building Permit Related(MS) | Rev 01:redesign of the whole HVAC system | — | Open |
| Nov 3, 2022 | Building Permit Related(MS) | REVISION - addition of a full height basement at the northwest corner of the houseHVAC - Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 1 storey rear addition, front and rear 2nd floor additions, interor alterations, and a rear deck.See also 21 | — | Closed |
| Aug 5, 2022 | Multiple Projects | REVISION - addition of a full height basement at the northwest corner of the house and includes egress windows and a door to the existing wall.Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 1 storey rear addition, front and rear 2nd floor addit | — | Closed |
| Jul 21, 2022 | Back Water Valve (Sewer only) | bwv installation | — | Closed |
| Jun 29, 2022 | Building Permit Related(PS) | Plumbing - Interior renovation including removal of load bearing wall, enlarge three window/door openings on west elevation, and add one window on south elevation | — | Open |
| Apr 4, 2022 | Building Permit Related(PS) | Plumbing - Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 1 storey rear addition, front and rear 2nd floor additions, interor alterations, and a rear deck.See also 21 215121 ZPR and 21 234851 MV. | — | Closed |
| Oct 13, 2021 | Building Permit Related(PS) | Plumbing - Proposal for a second floor addition, interior alterations and a finished basement 19.32 Q.M. ground Floor Area: 29.47 SQ.M., Second Floor Area: 34.03 SQ.M. addition / and 33.59 SQ.M. interior alterations.Total Area: 116.41 SQ.M. | — | Open |
| Sep 27, 2019 | Back Water Valve (Sewer only) | Installation of back water valve | — | Closed |
| Jul 26, 2019 | Interior Alterations | Interior Alterations/ convering stairs opening, adding new window at the rear. | $20K | Closed |
| Dec 10, 2018 | Back Water Valve (Sewer only) | Install one new mean line full port Back Water Valve (Sewer only). | — | Closed |
| Apr 4, 2017 | Building Permit Related(MS) | HVAC - proposed interior alterations in basement and ground floors | — | Closed |
| Mar 3, 2017 | Interior Alterations | proposed interior alterations in basement and ground floors | $50K | Closed |
| Mar 3, 2017 | Building Permit Related(PS) | Plumbing - proposed interior alterations in basement and ground floors | — | Closed |
| Sep 28, 2016 | Solar Collector | installation of roof top photovolactic soalr array on existing building - Harrision Public School | $55K | Closed |
| Jun 29, 2016 | Building Permit Related(PS) | Plumbing - Interior alterations to provide washrooms in an existing FDK classroom on ground floor - Harrison Elementary School | — | Closed |
| Jun 29, 2016 | Building Permit Related(MS) | HVAC - Interior alterations to provide washrooms in an existing FDK classroom on ground floor - Harrison Elementary School | — | Closed |
| Jun 13, 2016 | Interior Alterations | Interior alterations to provide washrooms in an existing FDK classroom on ground floor - Harrison Elementary School | $60K | Closed |
| May 26, 2016 | Back Water Valve (Sewer only) | to install a 4" mainline backwater valve | — | Closed |
| Nov 20, 2015 | Building Permit Related(PS) | Plumbing - Interior alterations and removal of non load bearing partitions (88.26m2) | — | Open |
| Nov 16, 2015 | Interior Alterations | Interior alterations and removal of non load bearing partitions (88.26m2) | $700K | Closed |
| Jul 4, 2014 | Building Permit Related(PS) | Plumbing - Interior alteratiosn to "Harrison Elementary School" for FDK fit-up | — | Closed |
| Jul 4, 2014 | Building Permit Related(MS) | HVAC - Interior alteratiosn to "Harrison Elementary School" for FDK fit-up | — | Closed |
| Jun 18, 2014 | Interior Alterations | Interior alterations to "Harrison Elementary School" for FDK fit-up | $50K | Closed |
| Apr 3, 2014 | Building Permit Related(PS) | Plumbing - Proposed interior alteartions (49.2m2) to second floor of single family detached dwelling with alterations to finished basement area (40m2). | — | Closed |
| Mar 25, 2014 | Interior Alterations | Proposed interior alterations (49.2m2) to second floor of single family detached dwelling with alterations to finished basement area (40m2). | $30K | Closed |
| Aug 20, 2013 | Back Water Valve (Sewer only) | Install MAIN LINE back water valve | $2K | Closed |
The 40 most recent of 103 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Harrison Rd with a permit on record · 31
- 4 Harrison Rd1 permit · to 2016
- 5 Harrison Rd4 permits · to 2023
- 6 Harrison Rd3 permits · to 2024
- 7 Harrison Rd1 permit · to 2012
- 8 Harrison Rd4 permits · to 2026
- 9 Harrison Rd1 permit · to 2022
- 10 Harrison Rd1 permit · to 2024
- 11 Harrison Rd1 permit · to 2024
- 15 Harrison Rd1 permit · to 2024
- 17 Harrison Rd1 permit · to 2024
- 22 Harrison Rd10 permits · to 2022
- 24 Harrison Rd3 permits · to 2017
- 28 Harrison Rd1 permit · to 2001
- 29 Harrison Rd2 permits · to 2023
- 30 Harrison Rd8 permits · to 2008
- 33 Harrison Rd2 permits · to 2003
- 34 Harrison Rd1 permit · to 2019
- 39 Harrison Rd3 permits · to 2000
- 60 Harrison Rd1 permit · to 2026
- 66 Harrison Rd5 permits · to 2018
- 67 Harrison Rd2 permits · to 2014
- 69 Harrison Rd12 permits · to 2024
- 70 Harrison Rd3 permits · to 2001
- 72 Harrison Rd4 permits · to 2000
- 74 Harrison Rd4 permits · to 2010
- 75 Harrison Rd1 permit · to 2019
- 81 Harrison Rd9 permits · to 2016
- 84 Harrison Rd2 permits · to 2015
- 87 Harrison Rd2 permits · to 2007
- 110 Harrison Rd1 permit · to 1998
- 111 Harrison Rd9 permits · to 2005