Street · 3828 of 8,516 by permit count
Building permits on Golden Gate Crt, Scarborough
The City of Toronto has 40 building permits on record for Golden Gate Crt in Scarborough, going back to 2005. Declared construction value totals $10.6M. Half of the 33 permits issued here came through within 29 days of the application. The most recent permit was issued Jan 26, 2026 at 34 Golden Gate Crt.
- Permits on record
- 402005–2026
- Declared construction value
- $10.6Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 29 days2 days slower than the city
Permits issued per year
Zoning
- Most common zone
- E100.0% of permits · by-law 60.20
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 29of 40 on record
The zoning categories the permits on Golden Gate Crt fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M1P
Looking for one address on Golden Gate Crt? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jan 26, 2026 | Interior Alterations | Proposal for interior alterations to construct a partition wall between the storage area and the dance studio - UNITS 5 & 6 | $10K | Open |
| Feb 21, 2025 | Building Permit Related(MS) | HVAC - Proposal for rear addition to existing industrial warehouse building including HVAC | — | Open |
| Feb 21, 2025 | Addition(s) | Proposal for rear addition to existing one storey industrial warehouse building including HVAC | $750K | Open |
| Feb 11, 2025 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposal for rear addition to existing one storey industrial warehouse building including HVAC | — | Open |
| Jun 4, 2024 | Site Service | Revision 01 - amendment to site servicesDrain - Proposed new 1 storey feezer building. | — | Open |
| Apr 19, 2024 | New Building | Rev 03 - Proposal for the new engineered racking installation. Revision 02 - To add a small addition to the south side for a new office/lunch room.REVISION 01: design changesProposed new 1 storey feezer building. | — | New build |
| Mar 6, 2024 | Building Permit Related(PS) | Revision #2 - Amendment to add an office/lunch room addition - revised layout for the interior drains in reciving area and interior storm drains and connection to exterior.Revision to add a small addition to the south side for a new office/lunch room.Plumbing - Proposed new 1 storey feezer building. | — | Closed |
| Feb 2, 2024 | Building Permit Related(MS) | HVAC - Proposed new 1 storey feezer building. | — | Closed |
| Jul 30, 2023 | Sign Building Permit Related | Summary of Proposal:The proposal contains one illuminated overhanging structure sign displaying static copy and one illuminated wall sign displaying static copy erected at the first storey on the north elevation of the building at above noted premises.Dimensions:0.72m L x 8.66m W x 0.13m D at a heig | — | Closed |
| May 10, 2021 | Inside and Outside Drains | Drain - Proposal for a freezer storage addition in the existing warehouse/industrial building. | $10K | Closed |
| May 10, 2021 | Building Permit Related (DR) | Drain - Proposal for a freezer storage addition in the existing warehouse/industrial building. | — | Closed |
| May 10, 2021 | Building Permit Related(PS) | Plumbing - Proposal for a freezer storage addition in the existing warehouse/industrial building. | — | Closed |
| May 10, 2021 | Building Permit Related(MS) | HVAC - Proposal for a freezer storage addition in the existing warehouse/industrial building. | — | Closed |
| May 10, 2021 | Addition(s) | Proposal for a freezer storage addition in the existing warehouse/industrial building. | $6.1M | Closed |
| Dec 8, 2016 | Backflow Prevention Devices (Water only) | Proposal to install backflow prevention device in buddhist temple. | $1K | Closed |
| Nov 17, 2016 | Backflow Prevention Devices (Water only) | install back flow preventer | $10K | Closed |
| Oct 31, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a 1/2" D.C.V.A. Back Flow Prevention Device in the existing warehouse. | $1K | Closed |
| May 5, 2016 | Backflow Prevention Devices (Water only) | Proposal to install 1 1/2" backflow prevention device | $3K | Closed |
| Feb 24, 2016 | Backflow Prevention Devices (Water only) | PROPOSAL TO INSTALL 1 BACKFLOW PREVENTION DEVICE (WATER ONLY) | $2K | Closed |
| Feb 1, 2016 | Backflow Prevention Devices (Water only) | Install 1" backflow prevention device. | $2K | Closed |
| Dec 23, 2015 | Backflow Prevention Devices (Water only) | Plumbing Stand alone install DCVA back water prevention | $2K | Open |
| Dec 3, 2015 | Backflow Prevention Devices (Water only) | install backflow preventor | $2K | Closed |
| Oct 26, 2015 | Backflow Prevention Devices (Water only) | install 3/4" dcva backflow preventor, thermal expansion tank | $2K | Closed |
| Oct 22, 2015 | Building Permit Related(MS) | HVAC - To construct an addition to existing industrial building. | — | Open |
| Oct 22, 2015 | Addition(s) | To construct an addition to existing industrial building. | $362K | Open |
| Oct 22, 2015 | Building Permit Related(PS) | Plumbing - To construct an addition to existing industrial building. | — | Open |
| Sep 18, 2015 | Backflow Prevention Devices (Water only) | Proposal to install (1) backflow prevention device with thermal expansion tank. | $1K | Closed |
| Jul 27, 2015 | Building Permit Related(MS) | HVAC - To instal two spray booths and replace air. | — | Closed |
| Jul 27, 2015 | Interior Alterations | To instal two spray booths and replace air. | $15K | Open |
| Nov 19, 2012 | Backflow Prevention Devices (Water only) | Install 1 backflow preventer and thermal expansion tank | $5K | Closed |
| Jul 12, 2012 | Backflow Prevention Devices (Water only) | install backflow | $1K | Closed |
| Mar 5, 2012 | Backflow Prevention Devices (Water only) | install two (2) 3/4" backflow preventors | $3K | Closed |
| Jun 1, 2011 | Backflow Prevention Devices (Water only) | install 2 backflow preventer's one 2" and one 3/4" | $1K | Open |
| Apr 1, 2011 | Backflow Prevention Devices (Water only) | Install 1 backflow preventer | $1K | Closed |
| Aug 18, 2009 | Other(BA) | Construct a loading dock with a drive out ramp | $10K | Closed |
| Jul 18, 2008 | Inside and Outside Drains | Drain - CONSTRUCT ONE STOREY FREEZER ADDITION AND ONE NEW ENTRANCE | $50K | Closed |
| Jul 18, 2008 | Building Permit Related(MS) | HVAC - CONSTRUCT ONE STOREY FREEZER ADDITION AND ONE NEW ENTRANCE | — | Closed |
| Jul 18, 2008 | Addition(s) | CONSTRUCT ONE STOREY FREEZER ADDITION AND ONE NEW ENTRANCE | $1.6M | Closed |
| Jan 10, 2008 | Addition(s) | CONSTRUCT ONE STOREY ADDITION FOR FREEZER, AND ONE ENTRANCE | $1.6M | Closed |
| Nov 4, 2005 | Other(DS) | INSTALL OUTDOOR FLOUR STORAGE SILO FROM ANOTHER LOCATION AND INSTALL THREE OVERHEAD GARAGE DOORS TO WHOLESALE BAKERY. | $5K | Closed |
The 40 most recent of 40 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Golden Gate Crt with a permit on record · 18
- 1 Golden Gate Crt15 permits · to 2025
- 2 Golden Gate Crt3 permits · to 2016
- 7 Golden Gate Crt2 permits · to 2023
- 8 Golden Gate Crt8 permits · to 2015
- 9 Golden Gate Crt1 permit · to 2016
- 15 Golden Gate Crt1 permit · to 2012
- 18 Golden Gate Crt1 permit · to 2012
- 21 Golden Gate Crt1 permit · to 2015
- 22 Golden Gate Crt1 permit · to 2011
- 25 Golden Gate Crt1 permit · to 2012
- 26 Golden Gate Crt1 permit · to 2015
- 27 Golden Gate Crt2 permits · to 2015
- 28 Golden Gate Crt2 permits · to 2015
- 29 Golden Gate Crt2 permits · to 2015
- 30 Golden Gate Crt2 permits · to 2015
- 31 Golden Gate Crt2 permits · to 2015
- 33 Golden Gate Crt1 permit · to 2016
- 34 Golden Gate Crt2 permits · to 2026