thepermitmap

Street · 1249 of 8,516 by permit count

Building permits on Garratt Blvd, North York

The City of Toronto has 154 building permits on record for Garratt Blvd in North York, going back to 1991. Declared construction value totals $72.8M. Half of the 136 permits issued here came through within 36 days of the application. The most recent permit was issued Oct 28, 2026 at 123 Garratt Blvd.

Permits on record
1541991–2026
Declared construction value
$72.8Mas filed, not adjusted
Homes created
0dwelling units
Homes removed
0net +0
Typical wait
36 days9 days slower than the city

Permits issued per year

20002026 (part year)

Other streets in M3K

Wilson Ave2,519 permits
Carl Hall Rd277 permits
Home Rd145 permits
Regent Rd144 permits
Anthony Rd143 permits
Plewes Rd143 permits

Looking for one address on Garratt Blvd? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Oct 28, 2026 Other(TS) Proposal to construct a temporary air supported dome structure - Downsview Premeir Tennis Centre Pickleball CourtConvenience address is 2 Hanover Road — Open
Oct 13, 2026 Temporary Structures Proposal to rebuild of north grandstand and quantity (9) Wayfinding Towers. installation will begin November 9th, 2026. — Open
Sep 28, 2026 Temporary Structures Proposal to construct one temporary demountable stage for Rogers stadiumSet up: Aug. 28, 2026; Tear Down: Sept.18, 2026. — Closed
Aug 26, 2026 Temporary Structures Construct temporary demountable grandstand for Rogers stadiumSet up: Aug. 18, 2026; Tear Down: Aug. 27, 2026. — Closed
Aug 24, 2026 Temporary Structures Proposal for the construction of two temporary structure for BTS Concert — Closed
Aug 18, 2026 Temporary Structures Proposal to Construct one temporary demountable stage for Rogers stadiumSet up: Aug. 20, 2026; Tear Down: Aug. 27, 2026. — Closed
Aug 12, 2026 Temporary Structures Construct one temporary demountable stage for Rogers stadiumSet up: Aug. 8, 2026; Tear Down: Aug. 13, 2026. — Closed
Aug 4, 2026 Temporary Structures Proposal to construct one temporary demountable stage for Rogers Stadium. Installation date: August 1 2026, Removal date: August 7, 2026 — Closed
Jul 31, 2026 Temporary Structures Construct one temporary demountable structure - Brita ActivationSet up: Jul 29, 2026; Tear Down: Sept. 21, 2026. — Open
Jul 27, 2026 Temporary Structures Proposal to construct one temporary demountable stage for Rogers Stadium. Install July 25, 2026, Tear Down July 30, 2026 — Closed
Jun 26, 2026 Temporary Structures Proposal to construct one temporary demountable stage for Rogers Stadium. Install June 26 2026, Tear Down June 30 2026 — Closed
Jun 15, 2026 Temporary Structures Proposed Construct one temporary demountable stage for Rogers stadiumSet up: Jun. 14 2026; Tear Down: Jun 17, 2026. — Closed
Jun 12, 2026 Temporary Structures Construct one temporary demountable stage for Rogers stadiumSet up: June 11, 2026; Tear Down: Jun 14, 2026.- Mumford and Sons — Closed
Jun 2, 2026 Temporary Structures Proposal to construct one temporary demountable structures for Birkenstock at Rogers Stadium. Set up date May 4, 2026; tear down date Sep. 21, 2026 — Closed
Jun 2, 2026 Temporary Structures Proposal to construct two temporary demountable structures for Monster at Rogers Stadium. Set up date May 4, 2026; tear down date Sep. 21, 2026 — Closed
May 27, 2026 Temporary Structures Proposal to construct one temporary demountable stage for Rogers stadium.Set up: Jun 1, 2026; Tear Down: Jun 8, 2026. — Closed
May 22, 2026 Temporary Structures Revision: Quantity (4) wooden pergolas, off-the-shelf structure. These will be positioned adjacent to the Tour Catering tent. They will be anchored into the concrete with tapcon screws. Install date: May 13, 2026 Dismantle date: October 1, 2026. — Closed
May 21, 2026 Temporary Structures Proposal to construct one temporary demountable stage for Rogers stadium.Set up: May 16, 2026; Tear Down: Jun 8, 2026. — Closed
May 4, 2026 Temporary Structures Temporary structures for open-air concert including Main entry tent, A party compound, Graphic tower/ wall, Container entry archway to replace main entry scaffold wall. Install date: March 16, 2026 Dismantle date: October 1, 2026. — Closed
Apr 23, 2026 Alternative Solution ALTERNATIVE SOLUTION PROPOSAL TO ADDRESS A DEFFIENCY OUTLINED IN THE OBC NOTICE ASSOCIATED WITH THE ABOVER PERMIT APPLICATION, IN RELATION TO THE STANDPIPE REQUIREMENTS WITHIN TWO AIR SUPPORTED STRUCTURES EXCEEDING 2,500 m².THE PROPOSED CONSTRUCTION OF THESE AIR SUPPORTED STRUCTURES ARE VARY SIMILAR — Closed
Apr 7, 2026 Other(TS) Proposal for remaining items on site: Scaffold Wayfinding Towers, Scaffold Entrance Walls, Scaffold Wing Walls, -Vip Suites-Additional tents-Recording Studio cabinInstall date: March 16, 2026 Dismantle date: October 1, 2026 — Closed
Aug 29, 2025 Temporary Structures Construct temporary demountable stage. Set up date Aug. 31, 2025; tear down date Sep. 15, 2025. — Closed
Aug 7, 2025 Temporary Structures Construct temporary demountable stage. Set up date Aug. 12, 2025; tear down date Sep. 25, 2025. — Closed
Jul 21, 2025 Other Temporary Tents Proposal to install temporary tent - Installed 21 July to 30 September 20251_15m x 15m Adams BSA Frame Tent anchored with goncrete anchore on concrete pad with steel — Closed
Jul 18, 2025 Temporary Structures Proposal to construct temporary demountable stage. Set up - July 19, 2024, Tear down - Sep. 25, 2025. See Previous Permit 25 149469 TPS 00 TS — Closed
Jul 10, 2025 Temporary Structures Proposal to construct one stage Set up date July 3, 2025; tear down date Jul. 15, 2025 — Closed
Jul 9, 2025 Temporary Structures Proposal to install 5 TEMPORARY TENTS, Installed 10 July to 30 September 20251_15m x 50m Hoecker Frame Tent anchored with steel stakes - NO WALLS1_15m x 30m Adams BSA Frame Tent anchored with concrete anchore on concrete pad - NO WALLS1_15m Hexadome anchored with strrl stakes - NO WALLS' 1_20' x 45' — Closed
Jun 26, 2025 Alternative Solution Proposal for an alternative fire supression solution - onsite water storage and pump system — Closed
Jun 26, 2025 Temporary Structures Proposal to erect one stage/truss structure and 3 truss structures for Rogers Stadium - Live Nation CanadaSet up date June 20, 2025; tear down date Sep. 25, 2025 — Closed
Jun 26, 2025 Temporary Structures Proposal to construct three temporary demountable structures. Set up date June 20, 2025; tear down date Sep. 25, 2025. — Closed
Jun 26, 2025 Temporary Structures Construct two temporary demountable structures. Set up date June 20, 2025; tear down date Sep. 25, 2025 - Rogers Stadium — Closed
Jun 26, 2025 Temporary Structures REVISION - to fully temporary open air concert seating bowl permit (scaffold grandstands) due to alternative solution using water tanks for on-site fire suppression system instead of connection to Toronto FC Practice & Training Facility fire hydrant. Grandstands to be dismantled in October 2025. Ful — Closed
Jun 23, 2025 Temporary Structures Construct one temporary demountable structure for Birkenstock at Rogers Stadium. Set up date June 20, 2025; tear down date Sep. 25, 2025 — Closed
Jun 9, 2025 Temporary Structures Construct temporary demountable stage. Set up date June 23, 2025; tear down date Sep. 25, 2025 — Closed
May 28, 2025 Temporary Structures Container merchandise and concession pods to be installed May 8th-30th, 2025. ALL STRUCTURES TO BE DISMANTLED MAXIMUM 26 WEEKS AFTER INSTALLATION. — Closed
May 26, 2025 Temporary Structures A Party Compound and VIP Suites fabricated with Infinite Structures system. A Party Compound to be installed May 22-May 27, 2025. VIP Suites to be installed May 22-June 6, 2025. ALL STRUCTURES TO BE DISMANTLED MAXIMUM 26 WEEKS AFTER INSTALLATION. — Closed
May 26, 2025 Temporary Structures Proposed two scaffolding structures in the main entry facade and guest services for a temporary open air concert venue. Install date May 5, 2025. Dismantle: maximum 26 weeks after installation. — Closed
May 26, 2025 Other Temporary Tents Proposal: 13 tent structures with various floor areas. Erection greater than 31 days. ALL STRUCTURES TO BE DISMANTLED MAXIMUM 26 WEEKS AFTER INSTALLATION.Tents to be installed April 1-May 26, 2025. BaAM Office Trailer to be installed March 31, 2025. Remaining Office Trailers to be installed April 14 — Closed
Apr 30, 2025 Temporary Structures Proposal to erect 15 tents to be installed April 1 to May 26, 2025. ALL STRUCTURES TO BE DISMANTLED MAXIMUM 26 WEEKS AFTER INSTALLATION. — Closed
Aug 23, 2024 Fire Alarm Proposed upgrades to the existing life and safety systems. Installing additional exit signs, panic bar hardware, and adding/relocating manual pull stations. $10K Closed

The 40 most recent of 154 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Garratt Blvd with a permit on record · 4

  • 73 Garratt Blvd2 permits · to 2015
  • 75 Garratt Blvd1 permit · to 2009
  • 95 Garratt Blvd6 permits · to 2023
  • 123 Garratt Blvd145 permits · to 2026
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
154
Data through
2026-10-28
Refresh
Daily from the City
Sheet
STR-390