Street · 3205 of 8,565 by permit count
Building permits on Fima Cres
The City of Toronto has 52 building permits on record for Fima Cres, going back to 2005. Declared construction value totals $7.6M. The most recent permit was issued Dec 31, 2025 at 40 Fima Cres.
- Permits on record
- 522005–2025
- Declared construction value
- $7.6Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20052025 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Dec 31, 2025 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to add new coolers, new rooms, universal washroom | — | Open |
| Dec 29, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to add new coolers, new rooms, universal washroom | — | Open |
| Dec 17, 2025 | Interior Alterations | Proposal for interior alterations to add new coolers, new rooms, universal washroom- Interior fit out to add coolers, and two rooms for juice bottling and selling, in addition to a washroom. Existing offices house mop sink. | $50K | Open |
| Sep 24, 2025 | Other(PS) | Interior fit out to add coolers, and two rooms for juice bottling and selling, in addition to a washroom; existing offices house mop sink. | $50K | Open |
| Mar 24, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior and exterior alterations of the existing data centre. | — | Open |
| Dec 30, 2024 | Building Permit Related(MS) | HVAC - Alteration of an existing vacant space into a new Data Hall 4.The entire facility is a Data Centre owned & operated by 'Compass Datacenters'The scope of work includes removing & rebuilding the portion of the exterior wall (only in DH4 area of work) & interior fit out of a vacant space into a | — | Closed |
| Dec 30, 2024 | Interior Alterations | Alteration of an existing vacant space into a new Data Hall 4.The entire facility is a Data Centre owned & operated by 'Compass Datacenters'The scope of work includes removing & rebuilding the portion of the exterior wall (only in DH4 area of work) & interior fit out of a vacant space into a new DAT | $1.0M | Closed |
| Dec 18, 2024 | Building Permit Related(PS) | Plumbing - Proposal for demolition of the north portion of the existing building to accommodate the future new Data Halls & outdoor equipment yards. | — | Closed |
| Dec 18, 2024 | Building Permit Related(MS) | HVAC - Proposal for demolition of the north portion of the existing building to accommodate the future new Data Halls & outdoor equipment yards. | — | Closed |
| Dec 18, 2024 | Other(BA) | Proposal for demolition of the north portion of the existing building to accommodate the future new Data Halls & outdoor equipment yards.See also BA 24-254449 | $500K | Closed |
| Oct 10, 2023 | Site Service | Watermain Replacement | $800K | Open |
| Jun 22, 2022 | Interior Alterations | Proposal for interior and exterior alterations of the existing data centre. | $500K | Open |
| Jun 22, 2022 | Building Permit Related(MS) | HVAC - Proposal for interior and exterior alterations of the existing data centre. | — | Open |
| Jan 7, 2021 | Interior Alterations | Rev 02: Removal of 1 hour fire resistant rating on demising walls of UPS rooms.Rev 01: Interior demising of existing mezzanine, to accommodate new space requirements including both open and private offices, a meeting area, lounge space, a washroom and storage space.Proposed interior alterations for | — | Open |
| Dec 4, 2020 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing review for proposed interior alterations for demising of major spaces for new occupant (Data Centre) | — | Closed |
| Sep 10, 2020 | Building Permit Related(MS) | HVAC - Proposed interior alterations for demising of major spaces for new occupant (Data Centre) including new exits, fire alarm and sprinkler systems. Sprinkler System is to be reviewed under seperate FSU Permit application: 20-112099 FSU | — | Open |
| Sep 9, 2020 | Building Permit Related(PS) | Plumbing - Proposed interior alterations for demising of major spaces for new occupant (Data Centre) including new exits, fire alarm and sprinkler systems. Sprinkler System is to be reviewed under seperate FSU Permit application: 20-112099 FSU | — | Closed |
| Mar 2, 2020 | Interior Alterations | Proposal for interior alteartions to remove a portion of an existing demising wall between Units A and B | $15K | Closed |
| Feb 7, 2020 | Other(BA) | Revision #01 - Exterior site construction of foundations and concrete housekeeping pads for future electrical (generator) equipment and mechanical ventilation and cooling equipment to be installed at grade additional framing information provided, along with altered foundation now using micropiles.Pr | — | Open |
| Sep 3, 2019 | Backflow Prevention Devices (Water only) | Proposed installation of a new backflow prevention device in an existing industrial building, | $1K | Closed |
| May 16, 2019 | Inside and Outside Drains | Revision #02 - Proposed revision to issued permit 18-195516 STS. Revision #01 - Proposal for changes to site services.Drain - Proposal for interior alterations to a vacant building for the use of a food processing plant. | — | Closed |
| Jan 22, 2019 | Backflow Prevention Devices (Water only) | Proposal to install a back flow prevention device. | $4K | Closed |
| Jan 2, 2019 | Interior Alterations | REV01: Revision to issued permit 18-195516 BLD as per bubbled areas and addition of loading dock/space. Proposal for interior alterations to a vacant building for the use of a food processing plant. | — | Closed |
| Dec 6, 2018 | Building Permit Related(PS) | REV01: Revision to issued permit 18-195516 PLB as per bubbled areas. Plumbing - Proposal for interior alterations to a vacant building for the use of a food processing plant. | — | Closed |
| Aug 24, 2018 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to a vacant building for the use of a food processing plant. | — | Closed |
| Nov 14, 2017 | Interior Alterations | Proposal to repair vehicle impact damage | $5K | Open |
| Aug 26, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a 1 inch backflow prevention device. | $3K | Closed |
| Aug 19, 2016 | Backflow Prevention Devices (Water only) | Backflow Prevention Devices (Water only) | $2K | Closed |
| Aug 9, 2016 | Sprinklers | Proposal to install sprinklers on upper and lower levels of building - for temporary studio film set. | $50K | Closed |
| Jun 15, 2016 | Backflow Prevention Devices (Water only) | INSTALLATION OF BFP AND THERMAL EXPANSION TANK | $1K | Closed |
| Jan 29, 2016 | Building Permit Related(MS) | HVAC - Interior alterations to #75 and #77 Fima Cres. Also changes to parking and openings in exterior walls. | — | Closed |
| Jan 7, 2016 | Backflow Prevention Devices (Water only) | Proposal to install 1/2" RP Backflow Prevention Device in existing building. | $3K | Closed |
| Nov 23, 2015 | Backflow Prevention Devices (Water only) | Install one backflow preventor. | $2K | Closed |
| Nov 6, 2015 | Backflow Prevention Devices (Water only) | install backflow device | $2K | Closed |
| Oct 28, 2015 | Backflow Prevention Devices (Water only) | To install 1 back flow prevention Devices | $2K | Closed |
| Oct 14, 2015 | Backflow Prevention Devices (Water only) | To Install 1 Backflow Prevention Devices (Water only). | $2K | Closed |
| Aug 14, 2015 | Multiple Projects | Interior alterations to #75 and #77 Fima Cres. Also changes to parking and openings in exterior walls. | $120K | Open |
| Jul 3, 2015 | Solar Collector | Permit to install 6 Photovoltaic Solar Arrays on rooftop of existing Office building. | $450K | Closed |
| Feb 5, 2015 | Manholes/Catch Basins/Sumps/Interceptors | Proposal install trench drain at garage door, oil interceptor and redirect existing drains to interceptor. | $10K | Closed |
| Nov 23, 2012 | Other(BA) | Targeted masonry repairs | $35K | Closed |
The 40 most recent of 52 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.