Street · 1211 of 8,565 by permit count
Building permits on Crockford Blvd
The City of Toronto has 158 building permits on record for Crockford Blvd, going back to 1995. Those permits created 5 homes and removed 0, a net change of +5. Declared construction value totals $3.9M. The most recent permit was issued Jun 26, 2026 at 107 Crockford Blvd.
- Permits on record
- 1581995–2026
- Declared construction value
- $3.9Mas filed, not adjusted
- Homes created
- 5dwelling units
- Homes removed
- 0net +5
Permits issued per year
20012026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jun 26, 2026 | Backflow Prevention Devices (Water only) | Proposal to replace existing RP backflow prevention device on domestic water service with DCVA device. | $1K | Closed |
| Jun 2, 2026 | Building Permit Related(PS) | REVISION 2 - revised layoutPlumbing - Interior alterations to existing industrial building for proposed restaurant and office spaces. | — | Open |
| May 28, 2026 | Change of Use | REVISION - revised layoutInterior alterations to existing industrial building for proposed restaurant and office spaces. | — | Open |
| Jan 8, 2026 | Other(BA) | REV 02: FRONT CANOPY AND STRUCTURAL FRAMING REVISIONSRevision 01 - Revision to include modifications to the interior partitions and alteration to window sizes and openings on exterior elevations. ----------------------------------------------------------------Interior alterations and alterations to | — | Closed |
| May 14, 2025 | Building Permit Related(PS) | Plumbing Revision 01 - Revision due to changes to exterior facad and interior partitions.----------------------------------------------------------------------Plumbing - Interior alterations and alterations to the exterior facade to the existing office & warehouse building. | — | Closed |
| Apr 28, 2025 | Building Permit Related(MS) | Revision 01 - Revision to include modifications to the interior partitions and reduced the number of windows and openings. ----------------------------------------------------------------HVAC - Interior alterations and alterations to the exterior facade to the existing office & warehouse building. | — | Closed |
| Aug 14, 2024 | Sign Building Permit Related | 1 WALL SIGN**ALPHA RESOURCES LTD** | — | Closed |
| Jul 30, 2024 | Building Permit Related(PS) | Plumbing - Proposal to demolish and extend the rear of the property up to 22 ft high. Renovate the front of the building, remove existing skylight and increase the height of the building at the front. | — | Open |
| Jun 4, 2024 | Building Permit Related(MS) | Rev 01 - REVISION ON MECHANICAL HVAC AND MECHANICAL PLUMBINGHVAC - Interior alterations to existing industrial building for proposed restaurant and office spaces. | — | Closed |
| May 15, 2024 | Inside and Outside Drains | Drain - Proposal to remove and install new roof at a higher level, recladding exterior wall and interior plumbing rough-in for existing industrial building. | $100K | Open |
| Mar 4, 2024 | Addition(s) | Proposed addition to an existing storage warehouse | $480K | Open |
| Mar 4, 2024 | Building Permit Related(MS) | HVAC - Proposed addition to an existing storage warehouse | — | Open |
| Jul 21, 2023 | Other(BA) | Repair of section of exterior wall where car had gone through. | $50K | Closed |
| Nov 7, 2022 | Multiple Projects | Revision #2 - addition of upper storage offices (mezzanine on second floor) | — | Open |
| Jun 8, 2022 | Multiple Projects | REV02: Replacement of defected skylight and provide clerestory window in both sidesRevision to permit 20-108618 BLD. Proposal to change addition to 40x25 feet prefabricated steel building.Proposal to demolish and extend the rear of the property up to 22 ft high. Renovate the front of the building, r | — | Open |
| Jan 10, 2022 | Sprinklers | Revision - alterations and addition of upper storage offices (mezzanine on second floor)The sprinkler permit is related to folder 19-178070 | — | Open |
| Jan 10, 2022 | Building Permit Related(PS) | Revision to Plumbing - alterations and addition of upper storage offices (mezzanine on second floor) | — | Open |
| Jun 30, 2021 | Building Permit Related(MS) | HVAC - Revision #2 - addition of upper storage offices (mezzanine on second floor) | — | Open |
| Mar 22, 2021 | Interior Alterations | install 2 fire rated doors in demising walls UNIT 4 (VACANT) | $12K | Open |
| Dec 23, 2020 | Building Permit Related(MS) | HVAC - Proposal to demolish and extend the rear of the property up to 22 ft high. Renovate the front of the building, remove existing skylight and increase the height of the building at the front. | — | Open |
| Dec 8, 2020 | Alter: Add on /Ductwork | Ductwork add on UNIT 8 | $50K | Closed |
| Dec 4, 2020 | Interior Alterations | interior alterations UNIT 3 | $2K | Closed |
| Dec 4, 2020 | Interior Alterations | CONSTRUCT WOOD STUD WALL TO UNDERSIDE OF ROOF DECK UNIT 10 | $2K | Open |
| Dec 4, 2020 | Interior Alterations | INSTALL FIRE RATED DOOR INTO DEMISING WALL, UPPER & LOWER PLANTING AREA UNIT 7 | $2K | Open |
| Dec 4, 2020 | Interior Alterations | construct front floor enclosure with storage overhead UNIT 2 | $10K | Open |
| Dec 4, 2020 | Building Permit Related(MS) | HVAC - construct front floor enclosure with storage overhead UNIT 2 | — | Open |
| Nov 4, 2020 | Backflow Prevention Devices (Water only) | Proposal for the replacement of a backflow prevention device. | $1K | Closed |
| Jun 25, 2020 | Backflow Prevention Devices (Water only) | Backflow preventer installation | $2K | Closed |
| Mar 4, 2020 | Backflow Prevention Devices (Water only) | Replace Backflow Prevention Device | $2K | Closed |
| Feb 14, 2020 | Backflow Prevention Devices (Water only) | Proposal for the installation of a backflow prevention device. | $2K | Closed |
| Dec 16, 2019 | Interior Alterations | Proposed revisions to previously issued permit 18-113087 BLD for interior alterations. | — | Closed |
| Nov 27, 2019 | Building Permit Related(PS) | REVISION 2 - Revision to permit 18-113087 PLB 01 as per bubbled area.REVISION - alter interior layoutPlumbing - Proposed interior alterations FOR A MANUFACTURING FACILITY. Interior partition changes to provide office, lunch, washrrom areas and closing up some existing exterior openings. | — | Closed |
| Nov 27, 2019 | Building Permit Related(MS) | REVISION 2 - Revision to permit 18-113087 PLB 01 as per bubbled area.REVISION - alter interior layoutHVAC - Proposed interior alterations FOR A MANUFACTURING FACILITY. Interior partition changes to provide office, lunch, washrrom areas and closing up some existing exterior openings. | — | Closed |
| Nov 4, 2019 | Building Permit Related(PS) | Plumbing - proposed auto repair shop, enlarge 2 bay doors, interior alterations | — | Closed |
| Nov 4, 2019 | Building Permit Related(MS) | HVAC - proposed auto repair shop, enlarge 2 bay doors, interior alterations | — | Closed |
| Nov 1, 2019 | Multiple Projects | proposed auto repair shop, enlarge 2 bay doors, interior alterations | $300K | Open |
| Jul 31, 2019 | Backflow Prevention Devices (Water only) | install device | $5K | Closed |
| May 15, 2019 | Interior Alterations | Revision 01 - Revision to identify use as a Medical Marihuana Production Facility. | — | Closed |
| Oct 9, 2018 | Building Permit Related(MS) | HVAC - Reconstruction of partial building after fire damage | — | Open |
| Oct 9, 2018 | Interior Alterations | Reconstruction of partial building after fire damage | $50K | Open |
The 40 most recent of 158 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.