Street · 1401 of 8,516 by permit count
Building permits on Cedar Brae Blvd, Scarborough
The City of Toronto has 138 building permits on record for Cedar Brae Blvd in Scarborough, going back to 1999. Those permits created 22 homes and removed 12, a net change of +10. Declared construction value totals $10.1M. Half of the 121 permits issued here came through within 41 days of the application. The most recent permit was issued Aug 24, 2026 at 82 Cedar Brae Blvd.
- Permits on record
- 1381999–2026
- Declared construction value
- $10.1Mas filed, not adjusted
- Homes created
- 22dwelling units
- Homes removed
- 12net +10
- Typical wait
- 41 days14 days slower than the city
Permits issued per year
Zoning
- Most common zone
- RD100.0% of permits · by-law 10.20
- In detached-house zones
- 100.0%62.0% above the city’s 38.0%
- Permits with a zone
- 132of 138 on record
The zoning categories the permits on Cedar Brae Blvd fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M1J
Looking for one address on Cedar Brae Blvd? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 24, 2026 | Building Permit Related(PS) | Plumbing - PROPOSED INTERIOR ALTERATIONS & LBW REMOVAL | — | Open |
| Aug 24, 2026 | Interior Alterations | PROPOSED INTERIOR ALTERATIONS & LBW REMOVAL | $20K | Open |
| Jul 10, 2026 | Multiple Projects | Proposal to legalize the existing single family dwelling to a three unit dwelling | $100K | Open |
| Mar 9, 2026 | Addition(s) | Rev 01: changes to Unit 2 layoutsADDITION OF THREE (3) NEW UNITS TO AN EXISTING DWELLING UNIT BY SIDE ADDITION. | — | Open |
| Nov 27, 2025 | Building Permit Related(MS) | Rev 01: changes to Unit 2 layoutsHVAC - ADDITION OF THREE (3) NEW UNITS TO AN EXISTING DWELLING UNIT BY SIDE ADDITION. | — | Open |
| Nov 27, 2025 | Building Permit Related(PS) | Rev 01: changes to Unit 2 layoutsPlumbing - ADDITION OF THREE (3) NEW UNITS TO AN EXISTING DWELLING UNIT BY SIDE ADDITION. | — | Open |
| Aug 1, 2025 | Building Permit Related(PS) | Plumbing - Proposal to demolish the existing attached garage and replace it with new, construct new addition at the basement. ground and second floor levels, interior alterations and second dwelling in the basement in the existing detached single family house.. | — | Open |
| Aug 1, 2025 | Multiple Projects | Proposal to demolish the existing attached garage and replace it with new, construct new addition at the basement. ground and second floor levels, interior alterations and second dwelling in the basement in the existing detached single family house. | $200K | Open |
| Jan 21, 2025 | Other(SR) | Installing a Solar PV system on rooftop | $32K | Closed |
| Dec 11, 2024 | Building Permit Related(PS) | Plumbing - Proposal to demolish existing dwelling to construct new two storey Single Family Dwelling with finished walkout basement, rear deck and second storey balcony | — | Closed |
| Dec 5, 2024 | Building Permit Related(PS) | Plumbing - Proposal to construct one storey addition on side yard. | — | Closed |
| Aug 7, 2024 | Addition(s) | Proposal to construct one storey addition on side yard. | $130K | Closed |
| Jan 9, 2024 | Back Water Valve (Sewer only) | Installation of backwater valve | — | Closed |
| Dec 13, 2023 | Building Permit Related(MS) | HVAC - Proposal to demolish existing dwelling to construct new two storey Single Family Dwelling with finished walkout basement, rear deck and second storey balcony | — | Closed |
| Dec 13, 2023 | New Building | Proposal to demolish existing dwelling to construct new two storey Single Family Dwelling with finished walkout basement, rear deck and second storey balcony | $1.0M | New build |
| Dec 13, 2023 | Demolition | Proposal to demolish existing dwelling to construct new two storey Single Family Dwelling with finished walkout basement, rear deck and second storey balcony | — | Demolition |
| May 5, 2023 | Porch | PROPOSED FRONT WOOD PORCH | $18K | Closed |
| Apr 13, 2023 | Building Permit Related(MS) | HVAC - Proposed construction of a new two storey masonry single family dwelling.62 C CEDAR BRAE BLVD - PART 1 - CONVEYED LOT | — | Closed |
| Mar 7, 2023 | Demolition | Proposed Demolition of the existing single family dwelling. | — | Demolition |
| Mar 6, 2023 | Building Permit Related (DR) | Drain - Proposed construction of a new two storey masonry single family dwelling.62 C CEDAR BRAE BLVD - PART 1 - CONVEYED LOT | — | Closed |
| Mar 6, 2023 | Building Permit Related(PS) | Plumbing - Proposed construction of a new two storey masonry single family dwelling.62 C CEDAR BRAE BLVD - PART 1 - CONVEYED LOT | — | Closed |
| Mar 6, 2023 | New Building | Proposed construction of a new two storey masonry single family dwelling.62 C CEDAR BRAE BLVD - PART 1 - CONVEYED LOT | $1.5M | New build |
| Jan 3, 2023 | Demolition | Proposal to demolish existing single family dwelling to construct a new 2 storey brick frame single family dwelling | — | Demolition |
| Jun 30, 2022 | New Building | Proposal to constrcut a new two storey SFD. | $250K | New build |
| Jun 30, 2022 | Building Permit Related(PS) | Plumbing - Proposal to constrcut a new two storey SFD. | — | Closed |
| Mar 15, 2022 | Building Permit Related(MS) | HVAC - Proposal to construct new two storey Single Family Dwelling with two-car integral garage, finished walkout basement, rear deck and second storey balcony | — | Closed |
| Feb 17, 2022 | Building Permit Related (DR) | Drain - Proposal to construct new two storey Single Family Dwelling with two-car integral garage, finished walkout basement, rear deck and second storey balcony | — | Closed |
| Feb 17, 2022 | Demolition | Proposal to construct new two storey Single Family Dwelling with two-car integral garage, finished walkout basement, rear deck and second storey balcony | — | Demolition |
| Feb 17, 2022 | Building Permit Related(PS) | Plumbing - Proposal to construct new two storey Single Family Dwelling with two-car integral garage, finished walkout basement, rear deck and second storey balcony | — | Closed |
| Feb 17, 2022 | New Building | Proposal to construct new two storey Single Family Dwelling with two-car integral garage, finished walkout basement, rear deck and second storey balcony | $350K | New build |
| Feb 2, 2021 | Back Water Valve (Sewer only) | Proposal to install a BWV for exisitng SFD | — | Closed |
| Oct 28, 2020 | Addition(s) | Proposal to build a second floor "extra room" 18'*28' over an existing single living space. | $30K | Open |
| May 13, 2020 | Building Permit Related (DR) | Drain - Proposed new Interior Alterations | — | Closed |
| May 13, 2020 | Interior Alterations | Proposed new Interior Alterations to the basement. | $30K | Closed |
| May 13, 2020 | Building Permit Related(PS) | Plumbing - Proposed new Interior Alterations | — | Closed |
| Dec 5, 2019 | Building Permit Related(PS) | Plumbing - interior alterations to the existing main and second floor by opening up some walls and renovating the kitchen and washrooms, as well as adding a laundry unit to the second floor | — | Open |
| Sep 11, 2019 | Back Water Valve (Sewer only) | Proposal to install a back water valve | — | Closed |
| Aug 27, 2019 | Interior Alterations | interior alterations to the existing main and second floor by opening up some walls and renovating the kitchen and washrooms, as well as adding a laundry unit to the second floor | $200K | Open |
| Jan 22, 2019 | Building Permit Related (DR) | Drain - Proposal to demolish existing dwelling and construct 2 storey single family dwelling with integrated garage. | — | Closed |
| Jan 22, 2019 | New Building | Proposal to demolish existing dwelling and construct 2 storey single family dwelling with integrated garage. | $900K | New build |
The 40 most recent of 138 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Cedar Brae Blvd with a permit on record · 37
- 17 Cedar Brae Blvd3 permits · to 2017
- 21 Cedar Brae Blvd1 permit · to 2023
- 24 Cedar Brae Blvd5 permits · to 2018
- 28 Cedar Brae Blvd3 permits · to 2006
- 30 Cedar Brae Blvd2 permits · to 2017
- 32 Cedar Brae Blvd6 permits · to 2018
- 34 Cedar Brae Blvd7 permits · to 2023
- 39 Cedar Brae Blvd1 permit · to 2012
- 40 Cedar Brae Blvd1 permit · to 2005
- 44 Cedar Brae Blvd10 permits · to 2018
- 49 Cedar Brae Blvd5 permits · to 2022
- 50 Cedar Brae Blvd7 permits · to 2014
- 51 Cedar Brae Blvd5 permits · to 2016
- 54 Cedar Brae Blvd1 permit · to 2006
- 57 Cedar Brae Blvd4 permits · to 2024
- 58 Cedar Brae Blvd1 permit · to 2013
- 60 Cedar Brae Blvd6 permits · to 2007
- 62 Cedar Brae Blvd6 permits · to 2023
- 64 Cedar Brae Blvd4 permits · to 2020
- 70 Cedar Brae Blvd4 permits · to 2018
- 76 Cedar Brae Blvd1 permit · to 2001
- 77 Cedar Brae Blvd2 permits · to 2019
- 78 Cedar Brae Blvd6 permits · to 2014
- 79 Cedar Brae Blvd5 permits · to 2024
- 82 Cedar Brae Blvd2 permits · to 2026
- 84 Cedar Brae Blvd3 permits · to 2018
- 86 Cedar Brae Blvd1 permit · to 2014
- 88 Cedar Brae Blvd3 permits · to 2017
- 90 Cedar Brae Blvd4 permits · to 2004
- 91 Cedar Brae Blvd2 permits · to 2025
- 93 Cedar Brae Blvd2 permits · to 2024
- 96 Cedar Brae Blvd2 permits · to 2025
- 98 Cedar Brae Blvd1 permit · to 2019
- 102 Cedar Brae Blvd1 permit · to 2026
- 104 Cedar Brae Blvd1 permit · to 1999
- 105 Cedar Brae Blvd17 permits · to 2020
- 107 Cedar Brae Blvd3 permits · to 2026