Street · 2739 of 8,567 by permit count
Building permits on Bushbury Dr
The City of Toronto has 65 building permits on record for Bushbury Dr, going back to 1998. Those permits created 2 homes and removed 4, a net change of -2. Declared construction value totals $14.5M. The most recent permit was issued Aug 12, 2026 at 12 Bushbury Dr.
- Permits on record
- 651998–2026
- Declared construction value
- $14.5Mas filed, not adjusted
- Homes created
- 2dwelling units
- Homes removed
- 4net -2
Permits issued per year
20012026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 12, 2026 | Inside and Outside Drains | Drain - A new seasonal air supported dome structure is being proposed for the addition of four (4) new pickleball courts. No new building is being proposed as electrical power will be connected to the existing building located on site. Mechanical equipment will be located on a pad on the exterior of | $1.0M | Open |
| Aug 10, 2026 | Building Permit Related(MS) | HVAC - A new seasonal air supported dome structure is being proposed for the addition of four (4) new pickleball courts. No new building is being proposed as electrical power will be connected to the existing building located on site. Mechanical equipment will be located on a pad on the exterior of | — | Open |
| Aug 10, 2026 | Building Permit Related(PS) | Plumbing - A new seasonal air supported dome structure is being proposed for the addition of four (4) new pickleball courts. No new building is being proposed as electrical power will be connected to the existing building located on site. Mechanical equipment will be located on a pad on the exterior | — | Open |
| Aug 10, 2026 | New Building | A new temporary seasonal air supported dome structure is being proposed for the addition of four (4) new pickleball courts. The building will be in place for less than 6 months annually. The electrical power will be connected to the existing building located on site. Mechanical equipment will be loc | $1.0M | New build |
| Apr 2, 2026 | Demolition | Proposal to demolish single storey sfd | — | Demolition |
| Dec 2, 2025 | New Building | Revision 02: Proposal to revise layout on all floors, proposed a window at the side of first floor & a basement entrance at side of basement floor.Revision to foundation type from poured concrete into ICF. Garage and front yard platform enlargement. | — | New build |
| Nov 5, 2025 | Building Permit Related(PS) | Revision 01: Proposal to revise layout on all floors, create second suite in basement, proposed a window at the side of first floor & a basement entrance at side of basement floor.Plumbing - Proposed two storey single family dwelling | — | Closed |
| Oct 27, 2025 | Multiple Projects | Proposal for interior alterations, proposed window at the side of first floor, and a basement entrance at side of the dwelling. | $200K | Closed |
| Oct 27, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations, proposed window at the side of first floor, and a basement entrance at side of the dwelling. | — | Closed |
| Oct 20, 2025 | Interior Alterations | Proposal for existing single dwelling unit with interior renovation and alteration and proposed a window at the side of first floor & a basement entrance at side of basement floor. | $200K | Closed |
| Oct 20, 2025 | Building Permit Related(PS) | Plumbing - Proposal for existing single dwelling unit with interior renovation and alteration and proposed a window at the side of first floor & a basement entrance at side of basement floor. | — | Closed |
| Oct 3, 2025 | Building Permit Related(MS) | HVAC - To construct a 3 strorey detached dwelling with a rear balcony. | — | Open |
| Oct 3, 2025 | Building Permit Related (DR) | Drain - To construct a 3 strorey detached dwelling with a rear balcony. | — | Open |
| Oct 3, 2025 | Building Permit Related(PS) | Plumbing - To construct a 3 strorey detached dwelling with a rear balcony. | — | Open |
| Oct 3, 2025 | New Building | To construct a 3 strorey detached dwelling with a rear balcony. | $3.0M | New build |
| Aug 21, 2025 | Building Permit Related(PS) | Plumbing - Proposal for existing single dwelling unit with interior renovation and alteration and proposed a window at the side of first floor & a basement entrance at side of basement floor. | — | Closed |
| Aug 18, 2025 | Interior Alterations | Proposal for existing single dwelling unit with interior renovation and alteration and proposed a window at the side of first floor & a basement entrance at side of basement floor. | $200K | Closed |
| Nov 21, 2023 | Demolition | Proposed demoltion of two-storey abandoned residence (former caretaker residence). | — | Demolition |
| Aug 18, 2021 | Other(BA) | Construct a storage accessory structure of golf caddies | $150K | Closed |
| May 5, 2021 | Building Permit Related(MS) | REVISION - as per the drawingsHVAC - Proposed two storey single family dwelling | — | Closed |
| Oct 22, 2019 | Building Permit Related (DR) | Drain - Proposed two storey single family dwelling | — | Closed |
| Oct 22, 2019 | Demolition | Proposed demolition of existing 1 storey dwelling | — | Demolition |
| Jul 26, 2019 | Building Permit Related(MS) | HVAC - Interior renovations to existing clubhouse lower level kitchen and mechanical upgrades - Donalda Club | — | Open |
| Jul 24, 2019 | Building Permit Related(PS) | Plumbing - Interior renovations to existing clubhouse lower level kitchen and mechanical upgrades - Donalda Club | — | Open |
| Jul 18, 2019 | Interior Alterations | Interior renovations to existing clubhouse lower level kitchen and mechanical upgrades - Donalda Club | $4.0M | Open |
| Mar 20, 2018 | New Building | Proposal to demolish existing 5.84x8.23 m irrigation pumphouse and replace it with a new timber frame building and concrete slab on grade with the same size. Building to house irrigation pumps and associated electrical panels. | $30K | New build |
| Mar 20, 2018 | Demolition | Proposal to demolish the existing irrigation pumphouse size 5.84 x 8.23 m and replace it with new timber frame building with the same size. | — | Demolition |
| May 14, 2015 | Site Service | Modification of existing site services to address building flooding issues. | $300K | Open |
| Oct 29, 2014 | New Building | REVISION 3 - Finished basement | $150K | New build |
| Oct 29, 2014 | Building Permit Related(PS) | REVISION - to add a kitchenette and washroom in the basementPlumbing - One storey dwelling with loft, attached two car garage at grade | — | Closed |
| Sep 2, 2014 | Interior Alterations | Revision to powder room area in basement level at Donald Club | — | Closed |
| Mar 20, 2014 | Building Permit Related(PS) | Plumbing - Interior alteration to an existing ladies locker room at Donald Club | — | Closed |
| Mar 20, 2014 | Building Permit Related(MS) | HVAC - Interior alteration to an existing ladies locker room at Donald Club | — | Closed |
| Nov 25, 2013 | Building Permit Related(MS) | Revision on HVAC for basement radiant floor - One storey dwelling with loft, attached two car garage at grade | — | Closed |
| Aug 26, 2013 | Building Permit Related (DR) | Drain - One storey dwelling with loft, attached two car garage at grade | — | Closed |
| Jan 16, 2013 | Building Permit Related(PS) | Plumbing - One storey addition over existing lower level footprint with interior alterations to Donalda Club fitness centre. | — | Closed |
| Jan 16, 2013 | Building Permit Related(MS) | HVAC - One storey addition over existing lower level footprint with interior alterations to Donalda Club fitness centre. | — | Closed |
| Jan 16, 2013 | Addition(s) | One storey addition over existing lower level footprint with interior alterations to Donalda Club fitness centre. | $845K | Open |
| Nov 26, 2012 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - One storey addition over existing lower level footprint with interior alterations to Donalda Club fitness centre. | — | Open |
| Nov 7, 2012 | Demolition | Demolish one storey single family dwelling. | — | Demolition |
The 40 most recent of 65 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.