thepermitmap

Street · 3211 of 8,516 by permit count

Building permits on Blaine Dr, North York

The City of Toronto has 51 building permits on record for Blaine Dr in North York, going back to 2002. Those permits created 6 homes and removed 4, a net change of +2. Declared construction value totals $7.9M. Half of the 50 permits issued here came through within 32 days of the application. The most recent permit was issued Apr 20, 2023 at 10 Blaine Dr.

Permits on record
512002–2023
Declared construction value
$7.9Mas filed, not adjusted
Homes created
6dwelling units
Homes removed
4net +2
Typical wait
32 days5 days slower than the city

Permits issued per year

20022023 (part year)

Zoning

Most common zone
RD100.0% of permits · by-law 10.20
In detached-house zones
100.0%62.0% above the city’s 38.0%
Permits with a zone
51of 51 on record
  • Residential51 · 100%

The zoning categories the permits on Blaine Dr fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Most common work

Structures worked on

Postal areas

Other streets in M3B

Chipping Rd55 permits
Briarfield Dr52 permits
Tangmere Rd52 permits
Yewfield Cres52 permits
Longwood Dr51 permits
Coldwater Rd50 permits
Kirkdale Cres49 permits
Malabar Pl45 permits

Looking for one address on Blaine Dr? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Apr 20, 2023 Building Permit Related(MS) HVAC - construction of a new two-storey single family house, finished basement, integral garage — Open
Nov 29, 2022 Demolition demolish existing house — Demolition
Nov 29, 2022 Building Permit Related (DR) Drain - construction of a new two-storey single family house, finished basement, integral garage — Open
Nov 29, 2022 Building Permit Related(PS) Plumbing - construction of a new two-storey single family house, finished basement, integral garage — Open
Nov 29, 2022 New Building construction of a new two-storey single family house, finished basement, integral garage $500K New build
Nov 24, 2021 Deck Proposal to construct a deck in the rear yard $20K Closed
Feb 3, 2021 Demolition To demolish existing dwelling and construct a new two storey dwelling with finished basement — Demolition
Feb 3, 2021 Building Permit Related(MS) HVAC - To demolish existing dwelling and construct a new two storey dwelling with finished basement — Open
Feb 3, 2021 Building Permit Related(PS) Plumbing - To demolish existing dwelling and construct a new two storey dwelling with finished basement — Open
Feb 3, 2021 Building Permit Related (DR) Drain - To demolish existing dwelling and construct a new two storey dwelling with finished basement — Open
Feb 3, 2021 New Building To demolish existing dwelling and construct a new two storey dwelling with finished basement $2.2M New build
Jan 11, 2019 Building Permit Related(MS) HVAC - DEMOLITION / NEW HOUSE / PLUMBING / DRAIN / 249.54 SQUARE METERS OF FINISH BASEMENT — Closed
Oct 10, 2018 Building Permit Related (DR) Drain - DEMOLITION / NEW HOUSE / PLUMBING / DRAIN / 249.54 SQUARE METERS OF FINISH BASEMENT — Closed
Oct 10, 2018 Demolition Demolition of existing single family dwelling — Demolition
Oct 10, 2018 New Building DEMOLITION / NEW HOUSE / PLUMBING / DRAIN / 249.54 SQUARE METERS OF FINISH BASEMENT $500K New build
Oct 10, 2018 Building Permit Related(PS) Plumbing - DEMOLITION / NEW HOUSE / PLUMBING / DRAIN / 249.54 SQUARE METERS OF FINISH BASEMENT — Closed
Apr 6, 2018 Porch Addition of front canopy. $500K Closed
Nov 9, 2017 Building Permit Related(MS) HVAC - Proposal to construct a two storey addition and interior alterations to the ground floor — Closed
Nov 8, 2017 Building Permit Related (DR) Drain - Proposal to construct a two storey addition and interior alterations to the ground floor — Closed
Nov 8, 2017 Multiple Projects Proposal to construct a two storey addition and interior alterations to the ground floor $250K Closed
Nov 8, 2017 Building Permit Related(PS) Plumbing - Proposal to construct a two storey addition and interior alterations to the ground floor — Closed
Aug 8, 2017 Walk-Out Stair Proposal to construct a basement walk-out by removing a existing basement window creating a new door exiting to the rear yard of the property. $20K Closed
Jul 14, 2017 Building Permit Related(MS) HVAC - Construction of a 1 storey front addition including new garage (existing garage to be converted to floor area), conversion of existing solarium to new living room and interior alterations in basement and main floor — Closed
Jun 7, 2017 Multiple Projects Construction of a 1 storey front addition including new garage (existing garage to be converted to floor area), conversion of existing solarium to new living room and interior alterations in basement and main floor $200K Closed
Jun 7, 2017 Building Permit Related(PS) Plumbing - Construction of a 1 storey front addition including new garage (existing garage to be converted to floor area), conversion of existing solarium to new living room and interior alterations in basement and main floor — Closed
Oct 5, 2015 Demolition Demolish existing dwelling to construct a new two storey single family dwelling — Demolition
Aug 20, 2015 Building Permit Related(MS) HVAC - Construct a new two storey single (600.23m2) with attached garage and finished baement (265.32m2) Demolish existing one storey dwelling — Closed
Aug 5, 2015 Building Permit Related(PS) Plumbing - Construct a new two storey single (600.23m2) with attached garage and finished baement (265.32m2) Demolish existing one storey dwelling — Closed
Aug 5, 2015 Building Permit Related (DR) Drain - Construct a new two storey single (600.23m2) with attached garage and finished baement (265.32m2) Demolish existing one storey dwelling — Closed
Aug 5, 2015 New Building Construct a new two storey single (600.23m2) with attached garage and finished baement (265.32m2) Demolish existing one storey dwelling $1.5M New build
Aug 7, 2014 Building Permit Related(MS) HVAC - One storey front and rear additions, interior alterations, rear deck — Closed
Jun 25, 2014 Building Permit Related (DR) Drain - One storey front and rear additions, interior alterations, rear deck — Closed
Jun 6, 2014 Building Permit Related(PS) Plumbing - One storey front and rear additions, interior alterations, rear deck — Closed
Jun 6, 2014 Multiple Projects One storey front and rear additions, interior alterations, rear deck $500K Closed
Feb 21, 2013 Other(PS) Installation of 4" full port backwater valve on main line $8K Closed
Oct 21, 2008 Building Permit Related(MS) HVAC - Proposed two storey building - SFD. — Closed
Oct 15, 2008 Building Permit Related(PS) Plumbing - Proposed two storey building - SFD. — Closed
Oct 15, 2008 Building Permit Related (DR) Drain - Proposed two storey building - SFD. — Closed
Jun 25, 2008 Demolition 1-Storey sfd — Demolition
Jun 25, 2008 New Building Proposed two storey building - SFD. $700K New build

The 40 most recent of 51 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Blaine Dr with a permit on record · 10

  • 1 Blaine Dr7 permits · to 2017
  • 3 Blaine Dr1 permit · to 2021
  • 6 Blaine Dr7 permits · to 2018
  • 7 Blaine Dr5 permits · to 2014
  • 8 Blaine Dr5 permits · to 2021
  • 10 Blaine Dr5 permits · to 2023
  • 11 Blaine Dr5 permits · to 2008
  • 14 Blaine Dr6 permits · to 2007
  • 15 Blaine Dr5 permits · to 2019
  • 18 Blaine Dr5 permits · to 2015
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
51
Data through
2026-08-11
Refresh
Daily from the City
Sheet
STR-570