Street · 643 of 8,516 by permit count
Building permits on Attwell Dr, Etobicoke
The City of Toronto has 271 building permits on record for Attwell Dr in Etobicoke, going back to 1996. Those permits created 0 homes and removed 1, a net change of -1. Declared construction value totals $40.1M. Half of the 253 permits issued here came through within 41 days of the application. The most recent permit was issued Oct 28, 2026 at 190 Attwell Dr.
- Permits on record
- 2711996–2026
- Declared construction value
- $40.1Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 1net -1
- Typical wait
- 41 days14 days slower than the city
Permits issued per year
Zoning
- Most common zone
- E95.9% of permits · by-law 60.20
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 147of 271 on record
The zoning categories the permits on Attwell Dr fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M9W
Looking for one address on Attwell Dr? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 28, 2026 | Sign Building Permit Related | 1 Roof Sign****CANCOM***** | — | Open |
| Oct 21, 2026 | Interior Alterations | Proposed interior alterations to convert existing two-storey office building to proposed 41-suite care facility with adult programs designed to serve individuals living with dementia. | $7.0M | Open |
| Oct 21, 2026 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to convert existing two-storey office building to proposed 41-suite care facility with adult programs designed to serve individuals living with dementia. | — | Open |
| Oct 21, 2026 | Building Permit Related(MS) | HVAC - Proposed interior alterations to convert existing two-storey office building to proposed 41-suite care facility with adult programs designed to serve individuals living with dementia. | — | Open |
| Aug 17, 2026 | Other(BA) | Construction of exterior façade assemblies(Demolition of the existing building is under a separate permit) | $1.0M | Open |
| Jul 30, 2026 | Sign Building Permit Related | 1 WALL SIGN**CANCOM** | — | Closed |
| Jan 26, 2026 | Sign Building Permit Related | 1 WALL SIGN**CANCOM** (located on mechanical penthouse) | — | Closed |
| Dec 16, 2025 | Sign Building Permit Related | 1 WALL SIGN **CANCOM** | — | Closed |
| Sep 16, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to an existing office suite for new tenant - "Barrier Ridge Capital" | — | Closed |
| Sep 16, 2025 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to an existing office suite for new tenant - "Barrier Ridge Capital". | — | Closed |
| Sep 4, 2025 | Interior Alterations | Proposal for interior alterations to an existing office suite for new tenant - "Barrier Ridge Capital" | $200K | Closed |
| Aug 1, 2025 | Building Permit Related(MS) | HVAC - Proposal for Interior Alteration - build a conference room, storage room, IT room, meeting room, 5 private offices and a staff room. | — | Closed |
| Jul 31, 2025 | Building Permit Related(PS) | Plumbing - Proposal for Interior Alteration - build a conference room, storage room, IT room, meeting room, 5 private offices and a staff room. | — | Closed |
| Jul 28, 2025 | Interior Alterations | Proposal for Interior Alteration - build a conference room, storage room, IT room, meeting room, 5 private offices and a staff room. | $200K | Closed |
| May 27, 2025 | Addition(s) | Proposal for putting a concrete pad down and erecting a pre made silo 58ft to help grow business and store material safely. | $300K | Closed |
| Dec 11, 2024 | Building Permit Related(MS) | HVAC - One storey addition to the existing cannabis production facility. | — | Open |
| Dec 11, 2024 | Building Permit Related(PS) | Plumbing - One storey addition to the existing cannabis production facility. | — | Open |
| Dec 11, 2024 | Addition(s) | One storey addition to the existing cannabis production facility. | $500K | Open |
| Nov 27, 2024 | Partial Permit - Foundation | Part Permit - One storey addition to the existing cannabis production facility. | — | Closed |
| Jun 17, 2024 | Building Permit Related(MS) | HVAC - Creation of a new enclosed office, HVAC, electrical lighting and sprinkler modifications | — | Closed |
| Jun 12, 2024 | Interior Alterations | Creation of a new enclosed office, HVAC, electrical lighting and sprinkler modifications | $15K | Closed |
| Mar 1, 2024 | Sign Building Permit Related | INSTALL 2 NEW WALL SIGNS FOR REBRAND FROM HSBC TO RBC.****RBC**** | — | Closed |
| Oct 27, 2023 | Site Service | REV0!: Proposed revision to change on site noticed existing pipe in front of building is a 450mm pvc instead of the 1050 concrete pipe. Redesign shows a replacement of concrete pipe with smaller pvc pipe and 2 new manholes. All inlets from neighboring properties to be disconnected.Proposal for const | — | Closed |
| Oct 23, 2023 | Building Permit Related(PS) | propose to construct single storey steel frame addition | — | Closed |
| Oct 23, 2023 | Building Permit Related(MS) | propose to construct single storey steel frame addition | — | Closed |
| Oct 23, 2023 | Addition(s) | propose to construct single storey steel frame addition | $828K | Closed |
| Sep 27, 2023 | Interior Alterations | Revision #01 - Changes to interior floor layout.(Install Racking system).Proposal for Cannabis Grow Warehouse. | — | Closed |
| Aug 29, 2023 | Building Permit Related(MS) | HVAC - Proposal for Cannabis Grow Warehouse. | — | Closed |
| Aug 29, 2023 | Building Permit Related(PS) | Plumbing - Proposal for Cannabis Grow Warehouse. | — | Open |
| Aug 14, 2023 | Building Permit Related(PS) | Plumbing - Reworking of doors and washroom facility to create barrier free openings and universal washroom | — | Closed |
| Mar 23, 2023 | Building Permit Related(MS) | HVAC - Reworking of doors and washroom facility to create barrier free openings and universal washroom | — | Closed |
| Jan 6, 2023 | Interior Alterations | Reworking of doors and washroom facility to create barrier free openings and universal washroom | $189K | Closed |
| Oct 7, 2022 | Solar Collector | Construction of a 40 KW rooftop, ballasted solar photovoltaic generator | $120K | Open |
| Aug 5, 2022 | Building Permit Related(PS) | Plumbing - Proposed interior renovations to existing office space in suite 400 | — | Closed |
| Aug 5, 2022 | Building Permit Related(MS) | HVAC - Proposed interior renovations to existing office space in suite 400 | — | Closed |
| Aug 5, 2022 | Interior Alterations | Proposed interior renovations to existing office space in suite 400 | $10K | Closed |
| Apr 13, 2022 | Building Permit Related(PS) | REV 01-REVISE LAYOUTPlumbing - interior alterations, install drive thru doors. Change of Use from office to Vehicle Service and Repair Shop | — | Closed |
| Jun 16, 2021 | Building Permit Related(MS) | HVAC - interior alterations, install drive thru doors. Change of Use from office to Vehicle Service and Repair Shop | — | Closed |
| Jun 16, 2021 | Sign Building Permit Related | To erect and display two non illuminated directional ground signs and two non illuminated wall signs***ROWLAND EMERGENCY AND SPECIALITY VEHICLES*** | — | Closed |
| Jun 1, 2021 | Backflow Prevention Devices (Water only) | PROPOSED: INSTALLING RP BACKFLOW ON PREMISE | $2K | Closed |
The 40 most recent of 271 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Attwell Dr with a permit on record · 42
- 165 Attwell Dr6 permits · to 2026
- 170 Attwell Dr26 permits · to 2025
- 180 Attwell Dr35 permits · to 2026
- 190 Attwell Dr30 permits · to 2026
- 191 Attwell Dr8 permits · to 2017
- 220 Attwell Dr18 permits · to 2024
- 234 Attwell Dr7 permits · to 2018
- 240 Attwell Dr16 permits · to 2022
- 246 Attwell Dr4 permits · to 2015
- 251 Attwell Dr14 permits · to 2026
- 252 Attwell Dr14 permits · to 2026
- 253 Attwell Dr14 permits · to 2026
- 254 Attwell Dr21 permits · to 2026
- 255 Attwell Dr14 permits · to 2026
- 258 Attwell Dr1 permit · to 1996
- 264 Attwell Dr1 permit · to 2010
- 268 Attwell Dr5 permits · to 2007
- 271 Attwell Dr10 permits · to 2020
- 272 Attwell Dr9 permits · to 2020
- 280 Attwell Dr2 permits · to 2015
- 285 Attwell Dr3 permits · to 2016
- 286 Attwell Dr1 permit · to 2016
- 310 Attwell Dr7 permits · to 2023
- 315 Attwell Dr5 permits · to 2020
- 317 Attwell Dr9 permits · to 2015
- 320 Attwell Dr1 permit · to 2013
- 355 Attwell Dr9 permits · to 2019
- 361 Attwell Dr5 permits · to 2023
- 369 Attwell Dr1 permit · to 2017
- 400 Attwell Dr3 permits · to 2012
- 402 Attwell Dr1 permit · to 1998
- 404 Attwell Dr1 permit · to 2016
- 414 Attwell Dr1 permit · to 2012
- 419 Attwell Dr8 permits · to 2024
- 425 Attwell Dr1 permit · to 2022
- 429 Attwell Dr6 permits · to 2025
- 444 Attwell Dr1 permit · to 2009
- 449 Attwell Dr1 permit · to 2012
- 451 Attwell Dr3 permits · to 2018
- 452 Attwell Dr1 permit · to 2016
- 462 Attwell Dr1 permit · to 2002
- 474 Attwell Dr3 permits · to 2013