Street · 796 of 8,516 by permit count

Building permits on Adra Villaway

The City of Toronto has 227 building permits on record for Adra Villaway, going back to 2017. Those permits created 523 homes and removed 115, a net change of +408. Declared construction value totals $150.5M. Half of the 223 permits issued here came through within 203 days of the application. The most recent permit was issued Aug 18, 2022 at 1 ADRA VILLAWAY.

Permits on record
2272017–2022
Declared construction value
$150.5Mas filed, not adjusted
Homes created
523dwelling units
Homes removed
115net +408
Typical wait
203 days176 days slower than the city

Permits issued per year

20172022 (part year)

Other streets in M2J

Allenbury Gdns289 permits
Forest Manor Rd255 permits
Lansing Sq239 permits
Buchan Crt208 permits
Fairview Mall Dr168 permits
Alamosa Dr116 permits

Looking for one address on Adra Villaway? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Aug 18, 2022 Electromagnetic Locks Proposal to install two magnetic locks in total. First on 6th floor suite 311 to corridorand second on main door by North overhead garage dooor - parking level 1 $4K Closed
Dec 6, 2021 Electromagnetic Locks Proposal to add one electromagnetic lock to 1 existing door.30 Okra Tomar Cres (Block C) $4K Closed
Jan 8, 2021 New Building REVISION 02- Revised permit submission for Block C amenity space. The upper amenity space for the Block C apartment building is being changed from the previously approved amenity space to a ¿HUB¿ space (an administrative space) for Toronto Community Housing staff. BLOCK C - Construct a new 4 storey — New build
Dec 17, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 17, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 17, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 17, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 17, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 17, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 17, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 17, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 17, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building - Lead REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building MODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Dec 16, 2020 New Building REVISION - as per attched letter including minor adjustments to the grades of the adjacent sidewalksMODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — New build
Aug 18, 2020 New Building Construct a new 17 storey residential building with 499 units (not TCHC) $100.0M New build
Aug 6, 2020 New Building Construct a 3 level underground parking garage for a new 17 storey residential building with 498 units (not TCHC) $43.0M New build
Jul 16, 2020 Special Ventilation System Proposed new Construction of a commercial kitchen Special Ventilation System kitchen hood. $60K Closed
Jun 16, 2020 Building Permit Related(MS) Construct a new 17 storey residential building with 498 units (not TCHC) — Closed
May 20, 2020 Building Permit Related(PS) Construct a new 17 storey residential building with 498 units (not TCHC) — Closed
Mar 9, 2020 Building Permit Related(MS) HVAC - Construct a 3 level underground parking garage for a new 17 storey residential building with 498 units (not TCHC) — Closed
Jan 9, 2020 Building Permit Related(PS) Plumbing - Construct a 3 level underground parking garage for a new 17 storey residential building with 498 units (not TCHC) — Closed
Jan 6, 2020 Building Permit Related(MS) HVAC - BLOCK C - Construct a new 4 storey residential building with 67units for TCHC with a 1 1/2 underground parking garage at 1-69 Adra Villaway, 1-53 Grado Villaway and 1-29 Tomar Villaway — Closed
Dec 11, 2019 Alternative Solution For all floor levels, it is proposed to design a standpipe system in a manner that standpipe risers provided with hose connections will be located in the existing stair enclosures in lieu of providing fire hose cabinets in the floor areas. Additional fire hose connections will be provided to provide — Closed
Dec 11, 2019 Alternative Solution This submission summarizes the Alternative Solution Proposal for the design of the indoor pool deck on Level 00 (Ground Floor) and the outdoor pool deck on Level 05 of the Scala Block D project to be constructed in Toronto, Ontario. The overall project consists of an 17-storey residential building w — Closed
Nov 14, 2019 Building Permit Related (DR) Drain - MODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — Closed
Nov 14, 2019 Building Permit Related (DR) Drain - MODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — Closed
Nov 14, 2019 Building Permit Related (DR) Drain - MODEL # "" BLOCK B - Construction of 24 three-storey back to back townhouses)Vehicular parking is provided in neighbouring development (Block C). — Closed

The 40 most recent of 227 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Adra Villaway with a permit on record · 2

  • 1 Adra Villaway226 permits · to 2022
  • 41 Adra Villaway1 permit · to 2019
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
227
Data through
2026-07-09