Neighbourhood · 117 of 158 by permit count
Building permits in Oakridge
The City of Toronto has 3,113 building permits on record for the Oakridge neighbourhood, going back to 1993. Those permits created 1,175 homes and removed 110, a net change of +1,065. Declared construction value totals $383.6M. Half of the 2,839 permits issued here came through within 59 days of the application. The most recent permit was applied for Oct 29, 2026 at 57 Patterson Ave.
- Permits on record
- 3,1131993–2026
- Declared construction value
- $383.6Mas filed, not adjusted
- Homes created
- 1,175dwelling units
- Homes removed
- 110net +1,065
- Typical wait
- 59 days32 days slower than the city
Permits issued per year
Zoning
- Most common zone
- RS49.2% of permits · by-law 10.40
- In detached-house zones
- 17.1%20.9% below the city’s 38.0%
- Permits with a zone
- 2,701of 3,113 on record
The zoning categories the permits in Oakridge fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Minor variances at the Committee of Adjustment
- Applications on record
- 309since 2016
- Approved
- 95.7%4.9% above the city · 231 decided
- Median time to a decision
- 140 days20 days slower than the city
Some projects in Oakridge need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. Back to back, that is about 199 days, not the 59 days the permit figure alone suggests. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Oct 29, 2026 | 57 Patterson Ave | Solar Collector | Roof mounted solar panel installation | $14K | Open |
| Oct 23, 2026 | 20 Teesdale Pl | Garage Repair/Reconstruction | Proposal for underground garage repairs and waterproofing | $1.0M | Open |
| Oct 23, 2026 | 11 Macey Ave | Fire Damage | Proposal for fire damage restoration | — | Open |
| Oct 22, 2026 | 777 Victoria Park Ave | Building Permit Related(MS) | HVAC - Construction of a 12 storeys tower with 1 level of Underground Parking and a Child Care Centre on Ground Floor (Building B) | — | Open |
| Oct 21, 2026 | 3464 Danforth Ave | Other(BA) | Proposal for a basement walk out and canopy at the rear | $10K | Open |
| Oct 20, 2026 | 521 Warden Ave | Building Permit Related(PS) | Plumbing - Proposed Garden suite | — | Open |
| Oct 20, 2026 | 525 Warden Ave | Building Permit Related(PS) | Plumbing - Proposed Garden suiteConvenience address is 527 Warden Ave. | — | Open |
| Oct 20, 2026 | 521 Warden Ave | Building Permit Related (DR) | Drain - Proposed garden suite. | — | Open |
| Oct 20, 2026 | 521 Warden Ave | Building Permit Related(PS) | Plumbing - Proposed garden suite. | — | Open |
| Oct 20, 2026 | 521 Warden Ave | New Laneway / Rear Yard Suite | Proposed garden suite. | $800K | Open |
| Oct 20, 2026 | 521 Warden Ave | New Laneway / Rear Yard Suite | Proposed garden suite. | $800K | Open |
| Oct 20, 2026 | 521 Warden Ave | Building Permit Related (DR) | Drain - Proposed garden suite. | — | Open |
| Oct 20, 2026 | 521 Warden Ave | New Laneway / Rear Yard Suite | Proposed Garden suite | $800K | Open |
| Oct 20, 2026 | 521 Warden Ave | Building Permit Related(PS) | Plumbing - Proposed garden suite. | — | Open |
| Oct 20, 2026 | 525 Warden Ave | New Laneway / Rear Yard Suite | Proposed Garden suiteConvenience address is 527 Warden Ave. | $80K | Open |
| Oct 20, 2026 | 521 Warden Ave | Building Permit Related (DR) | Drain - Proposed Garden suite | — | Open |
| Oct 15, 2026 | 61 Milne Ave | Interior Alterations | Adding a new freezer (570.46m2) within an existing warehouse. | $600K | Open |
| Oct 15, 2026 | 61 Milne Ave | Building Permit Related(PS) | Plumbing - Adding a new freezer (570.46m2) within an existing warehouse. | — | Open |
| Oct 15, 2026 | 61 Milne Ave | Building Permit Related(MS) | HVAC - Adding a new freezer (570.46m2) within an existing warehouse. | — | Open |
| Oct 14, 2026 | 61 Milne Ave | Building Permit Related(PS) | Plumbing - Proposal for built new walk-in cooler | — | Open |
| Oct 14, 2026 | 61 Milne Ave | Interior Alterations | Proposal for built new walk-in cooler | $100K | Open |
| Oct 14, 2026 | 61 Milne Ave | Building Permit Related(MS) | HVAC - Proposal for built new walk-in cooler | — | Open |
| Oct 13, 2026 | 1 Coventry St | Fire Damage | Structural & mechanical - plumbing fire damage restoration. | — | Open |
| Oct 13, 2026 | 1 Coventry St | Building Permit Related(PS) | Plumbing - Structural & mechanical - plumbing fire damage restoration. | — | Open |
| Oct 9, 2026 | 521 Warden Ave | New Laneway / Rear Yard Suite | Proposed Garden suite | $800K | Open |
| Oct 9, 2026 | 521 Warden Ave | Building Permit Related(PS) | Plumbing - Proposed Garden suite | — | Open |
| Oct 9, 2026 | 521 Warden Ave | Building Permit Related (DR) | Drain - Proposed Garden suite | — | Open |
| Oct 8, 2026 | 521 Warden Ave | New Building | REVISION - Rear wall type changesProposed new 3-storey fourplex. | — | New build |
| Sep 30, 2026 | 57 Medford Ave | Multiple Projects | Proposed interior alterations for internal demolition and modification in the basement and converting the existing basement as an additional dwelling unit. | $40K | Open |
| Sep 29, 2026 | 3268 Danforth Ave | Building Permit Related(MS) | Revision to permit 20 102060 to revise interior layouts.HVAC - PROPOSED: CONSTRUCT A THREE STOREY REAR ADDITION AND A 1 STOREY ADDITION OVER EXISTING TWO STOREY BUILDING INCLUDING HEATING, PLUMBING AND ELECTRICAL. | — | Open |
| Sep 29, 2026 | 3268 Danforth Ave | Building Permit Related(PS) | Revision to permit 20 102060 to revise interior layouts.Plumbing - PROPOSED: CONSTRUCT A THREE STOREY REAR ADDITION AND A 1 STOREY ADDITION OVER EXISTING TWO STOREY BUILDING INCLUDING HEATING, PLUMBING AND ELECTRICAL. | — | Open |
| Sep 29, 2026 | 23 Leyton Ave | New Building | New home construction (Multiplex - 5 units). | $85K | New build |
| Sep 21, 2026 | 77 Prairie Dr | Second Suite (New) | Proposal to convert second floor to secondary suite | $20K | Open |
| Sep 21, 2026 | 521 Warden Ave | New Building | REVISION - Rear wall type changesProposed new 3-storey fourplex. | — | New build |
| Sep 21, 2026 | 521 Warden Ave | New Building | REVISION - Rear wall type changesProposal to demolish existing SFD and construct a new 3-storey fourplex. | — | New build |
| Sep 21, 2026 | 77 Prairie Dr | Building Permit Related(PS) | Plumbing - Proposal to convert second floor to secondary suite | — | Open |
| Sep 18, 2026 | 3340 Danforth Ave | Addition(s) | Proposed side addition | $90K | Open |
| Sep 18, 2026 | 3 Balford Ave | Building Permit Related(MS) | HVAC - CONSTRUCT 2 STOREY GARDEN SUITE | — | Open |
| Sep 18, 2026 | 152 Byng Ave | Back Water Valve (Sewer only) | Proposal to install one backwater valve on the existing sanitary building drain and one backwater valve on the existing storm building drain serving the existing single-family dwelling. | — | Open |
| Sep 16, 2026 | 25 Madelaine Ave | Demolition | Proposal to demolish the existing 1 storey SFD-detached dwelling. | — | Demolition |
The 40 most recent of 3,113 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.