Neighbourhood · 102 of 158 by permit count
Building permits in Blake-Jones
The City of Toronto has 3,632 building permits on record for the Blake-Jones neighbourhood, going back to 1974. Those permits created 658 homes and removed 93, a net change of +565. Declared construction value totals $501.3M. Half of the 3,391 permits issued here came through within 14 days of the application. The most recent permit was issued Oct 28, 2026 at 497 Pape Ave.
- Permits on record
- 3,6321974–2026
- Declared construction value
- $501.3Mas filed, not adjusted
- Homes created
- 658dwelling units
- Homes removed
- 93net +565
- Typical wait
- 14 days13 days faster than the city
Permits issued per year
Zoning
- Most common zone
- R87.4% of permits · by-law 10.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 3,550of 3,632 on record
The zoning categories the permits in Blake-Jones fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Minor variances at the Committee of Adjustment
- Applications on record
- 192since 2016
- Approved
- 95.4%4.6% above the city · 175 decided
- Median time to a decision
- 155 days35 days slower than the city
Some projects in Blake-Jones need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. Back to back, that is about 169 days, not the 14 days the permit figure alone suggests. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Oct 28, 2026 | 497 Pape Ave | New Building | Construction of an Emergency Egress Building at 497 Pape Ave to support the Ontario Line. | $50.0M | New build |
| Oct 28, 2026 | 315 Bain Ave | Back Water Valve (Sewer only) | Back water valve installation | — | Open |
| Oct 28, 2026 | 400 Greenwood Ave | Other(BA) | Proposal for interior alterations (replacement of pump pit access hatch, localized concrete repairs, alterations and installation of pit ladders and pump control rework). | $200K | Open |
| Oct 28, 2026 | 17 Boothroyd Ave | New Building | Revision 01 - Revisin to add fifth-unit (fiveplex).---------------------------------------------------------Proposal to demolish existing triplex and construct a new three storey fourplex (garden suite proposed on site not in this review). | — | New build |
| Oct 27, 2026 | 400 Greenwood Ave | Building Permit Related(MS) | HVAC - Proposed replacement of the existing 3T bridge crane with a new 10T bridge crane addition within the TTC train maintenance facility, and all associated mechanical work. | — | Open |
| Oct 27, 2026 | 400 Greenwood Ave | Interior Alterations | Proposed replacement of the existing 3T bridge crane with a new 10T bridge crane addition within the TTC train maintenance facility, and all associated mechanical work. | $10.6M | Open |
| Oct 23, 2026 | 485 Jones Ave | Multiple Projects | Proposal for a new coverd deck, below grade entrance and new carport. | $25K | Closed |
| Oct 23, 2026 | 7 Dawson Ave | Carport | New carport canopy | $20K | Open |
| Oct 21, 2026 | 1015 Danforth Ave | Building Permit Related(MS) | HVAC - PROPOSED TO CONSTRUCT AN INTERIOR ALTERATION INCLUDING, RELOCATE KITCHEN, ADD 2 STORAGE ROOM IN BASEMENT, INFILL EXISTING OPENING AREA ON GROUND FLOOR | — | Open |
| Oct 21, 2026 | 83 Condor Ave | Back Water Valve (Sewer only) | Proposed installation of interior backwater valve in the basement of the house | — | Open |
| Oct 16, 2026 | 1063 Danforth Ave | Fire Damage | Fire damage repairs to the commercial/residential building. | — | Open |
| Oct 16, 2026 | 1177 Danforth Ave | Sign Building Permit Related | 9 Overhanging Structure Sign*****Canadian Blood Services***** | — | Open |
| Oct 14, 2026 | 110 Earl Grey Rd | Deck | Second floor balcony | $15K | Open |
| Oct 13, 2026 | 1015 Danforth Ave | Building Permit Related(PS) | Plumbing - PROPOSED TO CONSTRUCT AN INTERIOR ALTERATION INCLUDING, RELOCATE KITCHEN, ADD 2 STORAGE ROOM IN BASEMENT, INFILL EXISTING OPENING AREA ON GROUND FLOOR | — | Open |
| Oct 9, 2026 | 517 Jones Ave | Building Permit Related (DR) | Drain - Proposed interior alterations, underpinning and extension of porch | — | Open |
| Oct 9, 2026 | 517 Jones Ave | Building Permit Related(PS) | Plumbing - Proposed interior alterations, underpinning and extension of porch | — | Open |
| Oct 9, 2026 | 517 Jones Ave | Multiple Projects | Proposed 2 storey front addition and underpinning | $100K | Open |
| Oct 9, 2026 | 400 Greenwood Ave | Interior Alterations | Proposal for non-structural roofing replacement for the Boiler Building at TTC¿s Greenwood Yard Complex, 400 Greenwood Avenue. | $500K | Open |
| Oct 9, 2026 | 519 Jones Ave | Party Wall Admin Permits | Proposed party wall admin permit | — | Open |
| Oct 8, 2026 | 1015 Danforth Ave | Interior Alterations | PROPOSED TO CONSTRUCT AN INTERIOR ALTERATION INCLUDING, RELOCATE KITCHEN, ADD 2 STORAGE ROOM IN BASEMENT, INFILL EXISTING OPENING AREA ON GROUND FLOOR | $120K | Open |
| Oct 8, 2026 | 27 Shudell Ave | Building Permit Related(MS) | HVAC - Proposal for new house by renovation | — | Open |
| Oct 8, 2026 | 27 Shudell Ave | Building Permit Related (DR) | Drain - Proposal for new house by renovation | — | Open |
| Oct 8, 2026 | 27 Shudell Ave | New Building - By Renovation | Proposal for new house by renovation | $500K | New build |
| Oct 8, 2026 | 27 Shudell Ave | Demolition | New house by renovation | — | Demolition |
| Oct 8, 2026 | 27 Shudell Ave | Building Permit Related(PS) | Plumbing - Proposal for new house by renovation | — | Open |
| Oct 5, 2026 | 491 Pape Ave | Building Permit Related(PS) | Plumbing - Proposed interior alterations on second-floor and new addition in attic. | — | Open |
| Oct 5, 2026 | 1 Queen Victoria St | Building Permit Related(MS) | HVAC - Proposed interior alterations to existing basement for interior finishes and walls. | — | Open |
| Oct 5, 2026 | 400 Greenwood Ave | Interior Alterations | Proposal for structural rehabilitation of the Hostler Platform at Greenwood Yard. Note that a hostler platform is a platform that is used only by internal TTC forces to access subway trains. | $127K | Open |
| Oct 5, 2026 | 491 Pape Ave | Multiple Projects | Proposed interior alterations on second-floor and new addition in attic. | $15K | Open |
| Oct 2, 2026 | 467 Jones Ave | Back Water Valve (Sewer only) | Proposed supply and install backwater valve | — | Closed |
| Oct 2, 2026 | 1 Queen Victoria St | Building Permit Related(PS) | Plumbing - Proposed interior alterations to existing basement for interior finishes and walls. | — | Open |
| Sep 29, 2026 | 1 Queen Victoria St | Interior Alterations | Proposed interior alterations to existing basement for interior finishes and walls. | $60K | Open |
| Sep 25, 2026 | 27 Shudell Ave | New Building - By Renovation | 2 storey addition above the existing 1 storey detached house and new detached garagePLEASE NOTE: THIS IS AN APPLICATION FOR REVISION TO EXISTING PERMIT 26 134829 | $500K | New build |
| Sep 24, 2026 | 52 Earl Grey Rd | Porch | Revision 02: three seasons room added on porchRevision 01: Revision to permit to update porch construction (includes cold room) | — | Open |
| Sep 24, 2026 | 61 Harcourt Ave | Building Permit Related(MS) | HVAC - Proposal for third floor addition. | — | Open |
| Sep 23, 2026 | 1111 Danforth Ave | Partial Permit - Structural Framing | Part Permit - Proposal to construct a 13-storey mixed use purpose-built rental residential building with 297 units and non-res use. | — | Open |
| Sep 22, 2026 | 20 Egan Ave | Back Water Valve (Sewer only) | install backwater valve | — | Closed |
| Sep 18, 2026 | 7 Dawson Ave | Accessory Building(s) | New carport canopy | $20K | Closed |
| Sep 14, 2026 | 45 Harcourt Ave | Back Water Valve (Sewer only) | Supply and install main sanitary back water valve | — | Open |
| Sep 14, 2026 | 31 Shudell Ave | New Laneway / Rear Yard Suite | REVISION 01: Change to stair location, post and beam, and recess corner.Proposal to construct a new two storey rear yard Laneway Suite. | — | Open |
The 40 most recent of 3,632 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.