Neighbourhood · 70 of 158 by permit count
Building permits in Bayview Village
The City of Toronto has 5,612 building permits on record for the Bayview Village neighbourhood, going back to 1985. Those permits created 7,635 homes and removed 333, a net change of +7,302. Declared construction value totals $3.8B. Half of the 5,287 permits issued here came through within 33 days of the application. The most recent permit was issued Oct 30, 2026 at 41 Viamede Cres.
- Permits on record
- 5,6121985–2026
- Declared construction value
- $3.8Bas filed, not adjusted
- Homes created
- 7,635dwelling units
- Homes removed
- 333net +7,302
- Typical wait
- 33 days6 days slower than the city
Permits issued per year
Zoning
- Most common zone
- RD62.0% of permits · by-law 10.20
- In detached-house zones
- 62.0%24.0% above the city’s 38.0%
- Permits with a zone
- 4,186of 5,612 on record
The zoning categories the permits in Bayview Village fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Minor variances at the Committee of Adjustment
- Applications on record
- 314since 2016
- Approved
- 91.6%0.7% above the city · 284 decided
- Median time to a decision
- 95 days25 days faster than the city
Some projects in Bayview Village need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. Back to back, that is about 128 days, not the 33 days the permit figure alone suggests. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Oct 30, 2026 | 41 Viamede Cres | Building Permit Related(PS) | Plumbing - Proposed new extension structure to house. A new 2 pc washroom and corridor. | — | Open |
| Oct 30, 2026 | 41 Viamede Cres | Addition(s) | Proposed new extension structure to house. A new 2 pc washroom and corridor. | $20K | Open |
| Oct 29, 2026 | 2901 Bayview Ave | Site Service | Site Services Permit related to development of a 23-storey mixed use building; two 8-storey mixed use buildings; and a retail addition to the existing Bayview Village Shopping Centre at the north east portion of the lot. (23_213502_BLD_00_NB - Building A; 23_213533_BLD_00_NB - BUILDING B; 23_213617_ | $565K | Open |
| Oct 28, 2026 | 40 Heathview Ave | Interior Alterations | Proposal for interior alteration (wall removal) | $20K | Open |
| Oct 27, 2026 | 34 Bessarion Rd | Back Water Valve (Sewer only) | Proposal to install a mainline back water valve | — | Closed |
| Oct 22, 2026 | 1110 Sheppard Ave E | Interior Alterations | Revision to the washroom layoutInterior alterations to an existing office - Unit 308 | — | Open |
| Oct 21, 2026 | 35 Knollview Cres | Demolition | Demolition of existing single-family dwelling and construction of a new two-story single-family dwelling | — | Demolition |
| Oct 20, 2026 | 28 Brucedale Cres | Building Permit Related(MS) | HVAC - Proposal to demolish and reconstruct sunroom (identical footprint), exterior repair work, walkway and patio resurfaced. See also 26-193984 ZAP 00 ZR. | — | Open |
| Oct 20, 2026 | 35 Knollview Cres | New Building | Proposal for detached 2 storey single family dwelling | $1.0M | New build |
| Oct 13, 2026 | 125 Citation Dr | Building Permit Related(MS) | HVAC - Proposal to demolish existing dwewlling and construct a new 2 storey single family dwelling with finished basement and integral garage | — | Open |
| Oct 9, 2026 | 41 Blithfield Ave | New Building | Proposal for demolishing the old single family dwelling and construct a new one | $35K | New build |
| Oct 8, 2026 | 116 Burbank Dr | Back Water Valve (Sewer only) | Install a new backwater valve | — | Closed |
| Oct 6, 2026 | 4001 Leslie St | Garage Repair/Reconstruction | localized concrete repairs to the precast and conventional concrete members and localized asphalt waterproofing replacement in portions of the conventional garage with expansion joint waterproofing replacement. | $1.3M | Open |
| Oct 6, 2026 | 2901 Bayview Ave | New Building | To construct an 8-storey ( Rental) mixed-use building - Building B (108 residential units) This is part of the overall development consisting of two 8-storey buildings, one 23-storey tower and a commercial addition to the existing shopping centre for a total gross floor area of 39,854 square metres | $50.0M | New build |
| Oct 6, 2026 | 2901 Bayview Ave | New Building | To construct an 8- storey (Rental) mixed-use building - Building A (108 residential units) This is part of the overall development consisting of two 8-storey buildings, one 23-storey tower and a commercial addition to the existing shopping centre for a total gross floor area of 39,854 square metres | $50.0M | New build |
| Oct 1, 2026 | 86 Esther Shiner Blvd | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to a hair salon | — | Open |
| Oct 1, 2026 | 86 Esther Shiner Blvd | Building Permit Related(MS) | HVAC - Proposal for interior alterations to a hair salon | — | Open |
| Oct 1, 2026 | 28 Brucedale Cres | Multiple Projects | Proposal to demolish and reconstruct sunroom (identical footprint) with heated crawl space, interior and exterior alteration to ground floor, exterior repair work, walkway and patio resurfaced.See also 26-193984 ZAP 00 ZR. | $200K | Open |
| Oct 1, 2026 | 28 Brucedale Cres | Building Permit Related (DR) | Drain - Proposal to demolish and reconstruct sunroom (identical footprint), exterior repair work, walkway and patio resurfaced. See also 26-193984 ZAP 00 ZR. | — | Open |
| Oct 1, 2026 | 2901 Bayview Ave | Garage Repair/Reconstruction | South parking garage ramp rehabilitation | $500K | Open |
| Oct 1, 2026 | 28 Brucedale Cres | Building Permit Related(PS) | Plumbing - Proposal to demolish and reconstruct sunroom (identical footprint), exterior repair work, walkway and patio resurfaced. See also 26-193984 ZAP 00 ZR. | — | Open |
| Oct 1, 2026 | 53 Millgate Cres | Building Permit Related(MS) | REVISION - The window sizes have been updatedHVAC - Proposal to construct a new two storey dwelling complete with a rear yard deck, balcony and basement walkout. | — | Open |
| Sep 30, 2026 | 31 Clarinda Dr | Other(BA) | PROPOSED EXTERIOR STAIRS | $80K | Open |
| Sep 30, 2026 | 15 Hi Mount Dr | Building Permit Related(MS) | HVAC Revision 01 - Revision to change the hvac system in basement from funance to heat pump---------------------------------------------------------------HVAC - Two build a new two storey dwelling with a secondary unit in basement | — | Open |
| Sep 29, 2026 | 1110 Sheppard Ave E | Building Permit Related(PS) | Plumbing - Interior alterations to an existing office - Unit 308 | — | Open |
| Sep 29, 2026 | 1110 Sheppard Ave E | Building Permit Related(MS) | HVAC - Interior alterations to an existing office - Unit 308 | — | Open |
| Sep 24, 2026 | 86 Esther Shiner Blvd | Interior Alterations | Proposal for interior alterations to a hair salon | $240K | Open |
| Sep 23, 2026 | 2901 Bayview Ave | Multiple Projects | Underground Parking (3 Levels and additions to existing Mall). This is part of the overall development consisting of two 8-storey buildings, one 23-storey tower and a commercial addition to the existing shopping centre for a total gross floor area of 39,854 square metres (32,313 residential gross fl | $70.0M | Open |
| Sep 22, 2026 | 25 Canary Cres | Back Water Valve (Sewer only) | Back water valve installation to prevent flooding | — | Closed |
| Sep 22, 2026 | 621 Sheppard Ave E | Sign Building Permit Related | 2 overhanging strucuture wall.***F45*** | — | Open |
| Sep 21, 2026 | 640 Sheppard Ave E | Interior Alterations | Proposal to convert existing common area into new 1 bedroom unit. | $10K | Open |
| Sep 21, 2026 | 640 Sheppard Ave E | Building Permit Related(PS) | Plumbing - Proposal to convert existing common area into new 1 bedroom unit. | — | Open |
| Sep 21, 2026 | 640 Sheppard Ave E | Building Permit Related(MS) | HVAC - Proposal to convert existing common area into new 1 bedroom unit. | — | Open |
| Sep 18, 2026 | 4001 Leslie St | Electromagnetic Locks | Proposed installation of magnetic locks (maglocks) on the 4th Floor (West). | $250K | Open |
| Sep 18, 2026 | 621 Sheppard Ave E | Sign Building Permit Related | First party overhanging structure sign fitness studio **FS8** | — | Open |
| Sep 17, 2026 | 2901 Bayview Ave | Building Permit Related(MS) | HVAC - Underground Parking (3 Levels and additions to existing Mall). This is part of the overall development consisting of two 8-storey buildings, one 23-storey tower and a commercial addition to the existing shopping centre for a total gross floor area of 39,854 square metres (32,313 residential g | — | Open |
| Sep 11, 2026 | 87 Esther Shiner Blvd | Interior Alterations | Proposal for converting a existing group E (pop-up store) to a group E (bubble tea take out). | $60K | Open |
| Sep 11, 2026 | 87 Esther Shiner Blvd | Building Permit Related(PS) | Plumbing - Proposal for converting a existing group E (pop-up store) to a group E (bubble tea take out). | — | Open |
| Sep 11, 2026 | 87 Esther Shiner Blvd | Building Permit Related(MS) | HVAC - Proposal for converting a existing group E (pop-up store) to a group E (bubble tea take out). | — | Open |
| Sep 10, 2026 | 1200 Sheppard Ave E | New Building | Phase 2 - Build 2nd tower (Tower 3A) and part of associated podium and U/G parking garage with 393 units, 31 storeys plus mechanical penthouse. Development is for creation of a mixed use development comprised of an existing office development, and three new mixed use buildings with 5 new residential | $118.0M | New build |
The 40 most recent of 5,612 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.