Street · 1142 of 8,516 by permit count
Building permits on Wilmington Ave, North York
The City of Toronto has 166 building permits on record for Wilmington Ave in North York, going back to 1996. Those permits created 7 homes and removed 3, a net change of +4. Declared construction value totals $11.7M. Half of the 157 permits issued here came through within 25 days of the application. The most recent permit was issued Oct 21, 2026 at 221-245 WILMINGTON AVE.
- Permits on record
- 1661996–2026
- Declared construction value
- $11.7Mas filed, not adjusted
- Homes created
- 7dwelling units
- Homes removed
- 3net +4
- Typical wait
- 25 days2 days faster than the city
Permits issued per year
Zoning
- Most common zone
- RM56.7% of permits · by-law 10.80
- In detached-house zones
- 34.0%4.0% below the city’s 38.0%
- Permits with a zone
- 97of 166 on record
The zoning categories the permits on Wilmington Ave fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Minor variances at the Committee of Adjustment
- Applications on record
- 24since 2016
- Approved
- 100.0%9.2% above the city · 23 decided
Some projects on Wilmington Ave need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Other streets in M3H
Looking for one address on Wilmington Ave? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 21, 2026 | Building Permit Related(PS) | Plumbing - To construct a temporary sales office using modular prefabrication. The modular structure will be supported by block and pad supports at grade | — | Open |
| Oct 21, 2026 | Building Permit Related(MS) | HVAC - To construct a temporary sales office using modular prefabrication. The modular structure will be supported by block and pad supports at grade | — | Open |
| Oct 16, 2026 | New Building | To construct a temporary sales office using modular prefabrication. The modular structure will be supported by block and pad supports at grade | $250K | New build |
| Oct 14, 2026 | Building Permit Related(MS) | HVAC - Proposed interior alterations to legalize detached houseplex with 4 dwelling units | — | Open |
| Oct 14, 2026 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to legalize detached houseplex with 4 dwelling units | — | Open |
| Oct 7, 2026 | Interior Alterations | Proposed interior alterations to legalize detached houseplex with 4 dwelling units | $40K | Open |
| Sep 10, 2026 | Sign Building Permit Related | Revision for the structure of the A2.2 Campus Pylon sign ***HONEY & BARRY SHERMAN CAMPUS*** | — | Open |
| Jul 8, 2026 | Re-Roofing/Re-Cladding | Rev 01 - Proposed amendments to address deficiency letter dated march 2025.Siporex Deck Replacement on Roofs B1a and B3a. Roof Replacement on Roofs A, A1, B, B1, B1a, B2, B3, B3a, B4, D and D2. | — | Open |
| Mar 2, 2026 | Interior Alterations | Interior alterations to convert an existing semi-detached 3 unit (Triplex) to add a 4th unit (Fourplex). | $50K | Open |
| Dec 31, 2025 | Back Water Valve (Sewer only) | Proposal to install backwater valve. | — | Closed |
| Sep 10, 2025 | Building Permit Related(MS) | HVAC - Interior alterations to convert garage to a 4th unit to an existing 3 unit triplex. | — | Closed |
| Sep 10, 2025 | Building Permit Related(PS) | Plumbing - Interior alterations to convert garage to a 4th unit to an existing 3 unit triplex. | — | Open |
| May 7, 2025 | Backflow Prevention Devices (Water only) | Proposal to install new DCVA backflow preventer | $3K | Closed |
| Apr 11, 2024 | Multiple Projects | Interior alterations for new window, side below grade entrance and side deck | $50K | Closed |
| Apr 8, 2024 | Building Permit Related(PS) | Plumbing - Proposed 14 classroom addition to the existing CHAT Secondary School. | — | Closed |
| Mar 12, 2024 | Building Permit Related(PS) | Plumbing - proposed garden suite | — | Open |
| Mar 12, 2024 | New Laneway / Rear Yard Suite | proposed garden suite | $200K | Open |
| Mar 12, 2024 | Building Permit Related(MS) | HVAC - proposed garden suite | — | Open |
| Mar 7, 2024 | Building Permit Related(MS) | HVAC - Proposed 14 classroom addition to the existing CHAT Secondary School. | — | Closed |
| Mar 7, 2024 | Addition(s) | Proposed 14 classroom addition to the existing CHAT Secondary School. | $600K | Closed |
| Jul 13, 2023 | Partial Permit - Foundation | Conditional Permit - Part Permit - Proposed 14 classroom addition to the existing CHAT Secondary School. | — | Closed |
| Mar 1, 2023 | Back Water Valve (Sewer only) | Install back water valve | — | Closed |
| Jan 30, 2023 | Interior Alterations | REV 01: Multiple changes to initial permit. Proposal for flood damage repairs in the existing elementary school. | — | Closed |
| Sep 29, 2022 | Site Service | Site service - connection of new water main to street - flood damage repairs - Wilmington Elementary School | $15K | Closed |
| Sep 14, 2022 | Building Permit Related(PS) | Plumbing - Proposal for flood damage repairs in the existing elementary school. | — | Closed |
| Sep 14, 2022 | Building Permit Related(MS) | HVAC - Proposal for flood damage repairs in the existing elementary school. | — | Closed |
| Mar 29, 2022 | Back Water Valve (Sewer only) | Proposal for Backwater Valve. | — | Closed |
| Feb 4, 2022 | Building Permit Related(MS) | HVAC - Structural dunnage for new Rooftop Units, HVAC upgrade, partial re-roofing | — | Closed |
| Feb 4, 2022 | Multiple Projects | Structural dunnage for new Rooftop Units, HVAC upgrade, partial re-roofing | $484K | Closed |
| Apr 26, 2021 | Second Suite (New) | Proposal for secondary apartment in basement of existing sfd | $10K | Closed |
| Apr 26, 2021 | Building Permit Related(PS) | Plumbing - Proposal for secondary apartment in basement of existing sfd | — | Closed |
| Apr 1, 2021 | Balcony/Guard Repairs | Balcony Concrete Repairs and Railing Replacement - 30 Balconies - 720 Ln.Ft (219 Ln. M) | $180K | Closed |
| Mar 5, 2021 | New Building | Revision 02 - Revision on total building height accepted by C of AConstruct new two storey SFD-Semi Detached (156.31m2) | — | New build |
| Mar 5, 2021 | New Building - Lead | Revision 02 - Revision to overall building hight approved by C of AConstruct new two storey SFD-Semi Detached (156.31m2) | — | New build |
| Jun 30, 2020 | Building Permit Related(MS) | HVAC - Proposal for interior renovations to existing classrooms in the Community Hebrew Academy of Toronto. | — | Closed |
| Jun 23, 2020 | Interior Alterations | Proposal for interior renovations to existing classrooms in the Community Hebrew Academy of Toronto. | $200K | Closed |
| Jan 16, 2020 | Fire Alarm | Proposed fire alarm control panel replacement | $80K | Open |
| Jul 3, 2019 | New Building | Revision 02. Changes to the existing two window's sizes. | — | New build |
| Jun 20, 2019 | Building Permit Related(PS) | Plumbing - Proposal for interior alteration converting a class room into a meeting area. | — | Closed |
| Jun 20, 2019 | Building Permit Related(MS) | HVAC - Proposal for interior alteration converting a class room into a meeting area. | — | Closed |
The 40 most recent of 166 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Wilmington Ave with a permit on record · 52
- 1 Wilmington Ave3 permits · to 2002
- 10 Wilmington Ave1 permit · to 2021
- 15 Wilmington Ave4 permits · to 2025
- 20 Wilmington Ave1 permit · to 2001
- 24 Wilmington Ave1 permit · to 2014
- 26 Wilmington Ave1 permit · to 2014
- 31 Wilmington Ave13 permits · to 2021
- 33 Wilmington Ave17 permits · to 2018
- 35 Wilmington Ave9 permits · to 2018
- 66 Wilmington Ave10 permits · to 2021
- 68 Wilmington Ave2 permits · to 2017
- 115 Wilmington Ave5 permits · to 2010
- 121 Wilmington Ave4 permits · to 2014
- 123 Wilmington Ave7 permits · to 2018
- 141 Wilmington Ave1 permit · to 2011
- 200 Wilmington Ave35 permits · to 2026
- 205 Wilmington Ave1 permit · to 2018
- 219 Wilmington Ave1 permit · to 2016
- 221 Wilmington Ave10 permits · to 2026
- 222 Wilmington Ave9 permits · to 2026
- 223 Wilmington Ave9 permits · to 2026
- 224 Wilmington Ave9 permits · to 2026
- 225 Wilmington Ave9 permits · to 2026
- 226 Wilmington Ave9 permits · to 2026
- 227 Wilmington Ave9 permits · to 2026
- 228 Wilmington Ave9 permits · to 2026
- 229 Wilmington Ave9 permits · to 2026
- 230 Wilmington Ave9 permits · to 2026
- 231 Wilmington Ave9 permits · to 2026
- 232 Wilmington Ave10 permits · to 2026
- 233 Wilmington Ave9 permits · to 2026
- 234 Wilmington Ave12 permits · to 2026
- 235 Wilmington Ave9 permits · to 2026
- 236 Wilmington Ave9 permits · to 2026
- 237 Wilmington Ave9 permits · to 2026
- 238 Wilmington Ave9 permits · to 2026
- 239 Wilmington Ave9 permits · to 2026
- 240 Wilmington Ave9 permits · to 2026
- 241 Wilmington Ave9 permits · to 2026
- 242 Wilmington Ave9 permits · to 2026
- 243 Wilmington Ave9 permits · to 2026
- 244 Wilmington Ave13 permits · to 2026
- 245 Wilmington Ave9 permits · to 2026
- 249 Wilmington Ave1 permit · to 2008
- 250 Wilmington Ave3 permits · to 2024
- 269 Wilmington Ave2 permits · to 2015
- 282 Wilmington Ave1 permit · to 2022
- 285 Wilmington Ave8 permits · to 2026
- 327 Wilmington Ave1 permit · to 2025
- 330 Wilmington Ave14 permits · to 2023
- 339 Wilmington Ave1 permit · to 2017
- 345 Wilmington Ave1 permit · to 2023