Street · 3713 of 8,567 by permit count
Building permits on Westroyal Rd
The City of Toronto has 41 building permits on record for Westroyal Rd, going back to 1997. Those permits created 2 homes and removed 0, a net change of +2. Declared construction value totals $8.0M. The most recent permit was issued Jun 17, 2026 at 30 Westroyal Rd.
- Permits on record
- 411997–2026
- Declared construction value
- $8.0Mas filed, not adjusted
- Homes created
- 2dwelling units
- Homes removed
- 0net +2
Permits issued per year
20012026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jun 17, 2026 | Building Permit Related(PS) | Revision 01: Revision to permit, change to Boys WR #109A - removed one urinal fixture and provided 2 additional water closets. Chnage to Girls WR #131A - provided 3 additional water closetsPlumbing - Existing multi-purpose room to be converted to new learning commons & 2 new classrooms, interior alt | — | Open |
| Jun 17, 2026 | Building Permit Related(MS) | Revision 01: Revision to permit, change to Boys WR #109A - removed one urinal fixture and provided 2 additional water closets. Chnage to Girls WR #131A - provided 3 additional water closetsHVAC - Existing multi-purpose room to be converted to new learning commons & 2 new classrooms, interior alterat | — | Open |
| Jun 8, 2026 | Interior Alterations | Revision 01: Revision to permit, change to Boys WR #109A - removed one urinal fixture and provided 2 additional water closets. Chnage to Girls WR #131A - provided 3 additional water closetsExisting multi-purpose room to be converted to new learning commons & 2 new classrooms, interior alterations of | — | Open |
| Dec 18, 2025 | Certified Portables | Add one portable to the site, certified existing portable from another school site. | $100K | Open |
| Apr 22, 2025 | Building Permit Related(MS) | Revision: HVAC system works for new SFD residential dwelling | — | Open |
| Feb 24, 2025 | Building Permit Related(PS) | Plumbing - Proposal for second storey addition and interior alterations to the first floor of the existing dwelling. Updated: Includes front yard roof canopy and rear deck with pergola | — | Open |
| Dec 30, 2024 | Building Permit Related(MS) | HVAC - Proposal for second storey addition and interior alterations to the first floor of the existing dwelling. | — | Open |
| Dec 18, 2024 | Multiple Projects | Proposal for second storey addition and interior alterations to the first floor of the existing dwelling. Updated: Includes front yard roof canopy and rear deck with pergola | $45K | Open |
| May 28, 2024 | Interior Alterations | Proposed removal of load bearing wall on main floor only. | $5K | Closed |
| May 21, 2024 | Certified Portables | To add two portable classroom to site, certified existing portable transfer from another school | $100K | Open |
| Nov 24, 2023 | Multiple Projects | Proposal for a new full second storey addition over an existing bungalow and interior alterations | $400K | Open |
| Nov 24, 2023 | Building Permit Related(PS) | Plumbing - Proposal for a new full second storey addition over an existing bungalow. | — | Open |
| Jul 31, 2023 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to existing elementary school to convert library and library office on second floor to two classrooms (200m2). | — | Closed |
| Jul 31, 2023 | Interior Alterations | Proposal for interior alterations to existing elementary school to convert library and library office on second floor to two classrooms (200m2). | $300K | Closed |
| Aug 30, 2022 | Certified Portables | ADD TWO PORTABLE(S) TO SITE Certified existing Portable from another school site. | $100K | Open |
| Nov 18, 2021 | Walk-Out Stair | Proposal for basement walk out stairs. | $1K | Closed |
| Oct 5, 2020 | Inside and Outside Drains | Proposal for interior and exterior sanitary lateral replacement (4"), including floor drain, cleanouts, back water valve and sump pump. | $17K | Closed |
| Sep 28, 2020 | Certified Tents | Proposed 1 certified temporary tent, 6m x 12m Sierra frame tent (Cert # 14 251082) anchored with steel stakes. Installed from September 28th to October 28 28th, 2020 for St. Eugene Catholic School. | — | Closed |
| Sep 24, 2020 | Multiple Projects | proposal of an attached awning to a single detached house, a rear addition, a covered bar and a gazebo. | $20K | Open |
| Oct 10, 2019 | Back Water Valve (Sewer only) | Back Water Valve (Sewer only) and sump pump | — | Closed |
| Jul 30, 2019 | Back Water Valve (Sewer only) | Back Water Valve (Sewer only) | — | Closed |
| Oct 12, 2018 | Multiple Projects | Proposal for a rear second storey addition and interior alterations to existing two-storey single detached dwelling. | $30K | Closed |
| Oct 12, 2018 | Building Permit Related(PS) | Plumbing - Proposal for a rear second storey addition and interior alterations to existing two-storey single detached dwelling. | — | Closed |
| Oct 12, 2018 | Building Permit Related(MS) | HVAC - Proposal for a rear second storey addition and interior alterations to existing two-storey single detached dwelling. | — | Closed |
| Jun 14, 2018 | Other(SR) | ROOFTOP PV SOLAR PANEL INSTALLATION | $32K | Open |
| Sep 22, 2017 | Back Water Valve (Sewer only) | Back Water Valve (Sewer only) | — | Closed |
| Jan 15, 2016 | Inside and Outside Drains | Drain - Proposal for a 2 storey addition to an existing elementary school - providing 3 FDK classrooms + 9 standard classrooms + general purpose room with a stage + boys & girls change rooms and two universal washrooms. Scope of work also includes interior alterations to existingstaff room with M/F | — | Closed |
| Jan 14, 2016 | Building Permit Related(PS) | Plumbing - Proposal for a 2 storey addition to an existing elementary school - providing 3 FDK classrooms + 9 standard classrooms + general purpose room with a stage + boys & girls change rooms and two universal washrooms. Scope of work also includes interior alterations to existingstaff room with M | — | Closed |
| Jan 14, 2016 | Building Permit Related(MS) | HVAC - Proposal for a 2 storey addition to an existing elementary school - providing 3 FDK classrooms + 9 standard classrooms + general purpose room with a stage + boys & girls change rooms and two universal washrooms. Scope of work also includes interior alterations to existingstaff room with M/F W | — | Closed |
| Jan 14, 2016 | Multiple Projects | Proposal for a 2 storey addition to an existing elementary school - providing 3 FDK classrooms + 9 standard classrooms + general purpose room with a stage + boys & girls change rooms and two universal washrooms. Scope of work also includes interior alterations to existingstaff room with M/F Washroom | $6.5M | Closed |
| Oct 20, 2015 | Back Water Valve (Sewer only) | Proposal to install a 4" full port backwater valve on the main line | — | Closed |
| Jul 16, 2015 | Certified Portables | Relocate three portables on site at St Eugene Catholic School | $10K | Closed |
| Feb 17, 2015 | Back Water Valve (Sewer only) | To install 1 Back Water Valve (Sewer only). | — | Closed |
| Oct 9, 2012 | Backflow Prevention Devices (Water only) | Installation of one backflow prevention device - St. Eugene Catholic School | $6K | Closed |
| Aug 31, 2011 | Non-Certified Portables | replacement of six portable classrooms | $60K | Closed |
| Aug 22, 2011 | Pool Fence Enclosure | Proposed pool fence enclosure in rear yard of existing detached dwelling. | $40K | Closed |
| Jun 2, 2011 | Demolition | Demolition of four (4) portable classrooms. | — | Demolition |
| Jun 17, 2005 | Pool Fence Enclosure | Pool fence enclosure to inground pool | $40K | Closed |
| Feb 23, 2001 | New Building | New Single Family Dwelling with attached garage. Plumbing included. HVAC to follow A114 (area) ISSUED BUILDING & PLUMBING ON MARCH 23/00 | $180K | New build |
| Jul 21, 1999 | Unknown | DEMO 5 PORTABLES & CONSTRUCT 4 PORTABLES | — | Closed |
The 40 most recent of 41 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.