Street · 7078 of 8,565 by permit count
Building permits on Turntable Cres
The City of Toronto has 9 building permits on record for Turntable Cres, going back to 2010. Declared construction value totals $1.1M. The most recent permit was issued Apr 8, 2026 at 0 TURNTABLE CRES.
- Permits on record
- 92010–2026
- Declared construction value
- $1.1Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20102026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Apr 8, 2026 | Other(DS) | Proposal for a Designated Structure - a three level switchback ramp providing connection from Davenport Diamond Greenway Multi-Use Path to Pedestrian CP Bridge crossing. | $750K | Open |
| Oct 9, 2025 | Other(DS) | Proposal for Designated Structure - single ramp providing connection of Davenport Diamond Greenway Multi-Use Path to Davenport Road. | $105K | Open |
| Oct 8, 2025 | Retaining Wall | Proposal for Retaining wall built to provide acceptable slopes for adjacent Multi-use Path at the Davenport Diamond Greenway. | $105K | Open |
| Sep 27, 2018 | Other(SR) | REV01: changes to include unit#126 in scope of repairProposal to repair and restore balcony parapet wall and sister balcony floor joists to original condition post fire damage. | — | Closed |
| Jun 23, 2017 | Interior Alterations | Proposal for interior alterations to existing Part 9 condo building, Unit 62. | $50K | Closed |
| Nov 23, 2016 | Interior Alterations | Construct a mechanical room on the loft level (mechanical use room only) | $5K | Closed |
| Oct 11, 2016 | Other(SR) | Applicant proposed to extend the mezzanine area over the open to below space creating a complete 2nd floor area in the existing townhouse unit. | $5K | Closed |
| Jun 16, 2014 | Other(SR) | 3rd floor rooftop deck repair with some minor structural work on TH 51 and TH 78 of TSCC 1824 (Condo Common Elements) | $45K | Open |
| Mar 12, 2010 | Backflow Prevention Devices (Water only) | To install one backflow prevention device. | $9K | Open |
The 9 most recent of 9 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.