Street · 1832 of 8,567 by permit count
Building permits on Toynbee Trl
The City of Toronto has 105 building permits on record for Toynbee Trl, going back to 2000. Those permits created 6 homes and removed 0, a net change of +6. Declared construction value totals $2.0M. The most recent permit was issued Aug 11, 2026 at 35 Toynbee Trl.
- Permits on record
- 1052000–2026
- Declared construction value
- $2.0Mas filed, not adjusted
- Homes created
- 6dwelling units
- Homes removed
- 0net +6
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 11, 2026 | Addition(s) | Proposed second storey addition to create second unit | $100K | Open |
| Aug 11, 2026 | Building Permit Related(PS) | Plumbing - Proposed second storey addtion to existing one storey dwelling | — | Open |
| Sep 3, 2025 | Building Permit Related(MS) | HVAC - Proposed second storey addtion to existing one storey dwelling | — | Open |
| May 5, 2025 | Interior Alterations | Proposal to construct interior alterations to remove a load bearing wall | $10K | Closed |
| Jan 30, 2025 | Interior Alterations | Proposal for interior alterations. | $20K | Open |
| Nov 20, 2024 | Carport | REVISION 1: increase width of carport from 12ft to 13ftAttached carport | — | Closed |
| Sep 13, 2024 | Interior Alterations | Proposal for structural alterations | $25K | Closed |
| Apr 12, 2024 | Multiple Projects | Proposal to create a new dwelling unit within addition at the rear side and above the garage. existing shed to be demolish to accomodate addition. | $337K | Closed |
| Apr 12, 2024 | Building Permit Related(PS) | Plumbing - Proposal to create a new dwelling unit within addition at the rear side and above the garage. existing shed to be demolish to accomodate addition. | — | Closed |
| Mar 22, 2024 | Deck | Rear wood deck | $20K | Closed |
| Mar 4, 2024 | Deck | Rear wood deck | $20K | Closed |
| Nov 7, 2023 | Back Water Valve (Sewer only) | bwv installation | — | Closed |
| Aug 28, 2023 | Fire Damage | REPAIR TO REAR DECK OF SFD DUE TO FIRE DAMAGE. | — | Open |
| Aug 18, 2023 | Building Permit Related(MS) | HVAC - NEW BASEMENT SECONDARY SUITE TO EXISTING SFD | — | Closed |
| Aug 10, 2023 | Deck | REPAIR TO REAR DECK OF SFD DUE TO FIRE DAMAGE. | $10K | Closed |
| Jul 14, 2023 | Building Permit Related(PS) | Plumbing - NEW BASEMENT SECONDARY SUITE TO EXISTING SFD | — | Closed |
| Jun 29, 2023 | Interior Alterations | removal of load bearing wall | $40K | Closed |
| Jun 13, 2023 | Second Suite (New) | NEW BASEMENT SECONDARY SUITE TO EXISTING SFD | $30K | Closed |
| Mar 23, 2023 | Deck | REPAIR TO REAR DECK OF SFD DUE TO FIRE DAMAGE. | $10K | Closed |
| Mar 15, 2023 | Second Suite (New) | Convert the existing basement to a second dwelling unit, two enlarged windows and one new egress window in the basement | $78K | Closed |
| Mar 6, 2023 | Building Permit Related (DR) | Drain - Convert the existing basement to a second dwelling unit, two enlarged windows and one new egress window in the basement | — | Closed |
| Mar 6, 2023 | Building Permit Related(PS) | Plumbing - Convert the existing basement to a second dwelling unit, two enlarged windows and one new egress window in the basement | — | Closed |
| Mar 6, 2023 | Building Permit Related(MS) | HVAC - Convert the existing basement to a second dwelling unit, two enlarged windows and one new egress window in the basement | — | Closed |
| Feb 25, 2023 | Interior Alterations | Revised application for the following items: proposed interior on the main floor including load bearing removals for the living area with changing the roof or ceiling. | — | Closed |
| Jan 25, 2023 | Building Permit Related (DR) | Drain - Proposed interior alterations to the main floor including load bearing removals and a cathedral ceiling. A second unit in the basement and a carport on the west side of the building, and modified front porch. | — | Closed |
| Jan 25, 2023 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to the main floor including load bearing removals and a cathedral ceiling. A second unit in the basement and a carport on the west side of the building, and modified front porch. | — | Closed |
| Dec 6, 2022 | Back Water Valve (Sewer only) | Proposal to install a back water valve | — | Closed |
| Jul 28, 2022 | Building Permit Related (DR) | Drain - 1. Change of use from sfd to tud (as-built).2. 1- enlarge window in level-1. | — | Closed |
| Jul 28, 2022 | Interior Alterations | 1. Change of use from sfd to tud (as-built).2. 1- enlarge window in level-1. | $65K | Closed |
| Jul 28, 2022 | Building Permit Related(PS) | Plumbing - 1. Change of use from sfd to 2 unit dwelling (as-built).2. 1- enlarge window in level-1. | — | Closed |
| May 17, 2022 | Carport | Construct attached carport | $15K | Open |
| May 9, 2022 | Garage | Demolish existing garage, proposed garage with driveway new curb cut. | $60K | Open |
| Nov 9, 2021 | Back Water Valve (Sewer only) | BACKWATER VALVE INSTALLATION | — | Open |
| Sep 22, 2020 | Back Water Valve (Sewer only) | Proposed Back Water Valve (Sewer only) | — | Closed |
| Aug 27, 2019 | Back Water Valve (Sewer only) | install back water valve | — | Closed |
| Aug 22, 2019 | Back Water Valve (Sewer only) | Proposal to install back water valve. | — | Closed |
| Apr 26, 2019 | Back Water Valve (Sewer only) | Proposal to install back water valve. | — | Closed |
| Mar 28, 2019 | Interior Alterations | interior alterations | $10K | Closed |
| Mar 28, 2019 | Building Permit Related(PS) | Plumbing - interior alterations | — | Closed |
| Feb 26, 2019 | Back Water Valve (Sewer only) | Proposal to install back water valve. | — | Closed |
The 40 most recent of 105 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.