Street · 1765 of 8,516 by permit count
Building permits on Shannon St
The City of Toronto has 110 building permits on record for Shannon St, going back to 1989. Those permits created 9 homes and removed 0, a net change of +9. Declared construction value totals $2.8M. Half of the 105 permits issued here came through within 7 days of the application. The most recent permit was issued Jun 4, 2026 at 76 Shannon St.
- Permits on record
- 1101989–2026
- Declared construction value
- $2.8Mas filed, not adjusted
- Homes created
- 9dwelling units
- Homes removed
- 0net +9
- Typical wait
- 7 days20 days faster than the city
Permits issued per year
Zoning
- Most common zone
- R100.0% of permits · by-law 10.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 110of 110 on record
The zoning categories the permits on Shannon St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M6J
Looking for one address on Shannon St? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jun 4, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to existing SFD semi-detached. | — | Open |
| Jun 4, 2026 | Interior Alterations | Proposal for interior alterations to existing SFD semi-detached. | $100K | Open |
| Sep 30, 2025 | Building Permit Related(MS) | HVAC - Proposed demolition of an existing garage to build a new two storey laneway suite.Ancillary to a two-unit, semi-detached dwelling. | — | Closed |
| Aug 6, 2025 | Building Permit Related (DR) | Drain - Proposed demolition of an exisiting garage to build a new laneway suite.Ancillary to a two-unit, semi-detached dwelling. | — | Closed |
| Aug 6, 2025 | New Laneway / Rear Yard Suite | Proposed demolition of an existing garage to build a new two storey laneway suite.Ancillary to a two-unit, semi-detached dwelling. | $150K | Closed |
| Aug 6, 2025 | Building Permit Related(PS) | Plumbing - Proposed demolition of an exisiting garage to build a new laneway suite.Ancillary to a two-unit, semi-detached dwelling. | — | Closed |
| Feb 13, 2025 | Building Permit Related(MS) | HVAC - Proposal to construct multiple projects (second suite, interior alterations, second/third floor addition and rear yard deck). | — | Closed |
| Jan 16, 2025 | Building Permit Related (DR) | Drain - Proposal to construct multiple projects (second suite, interior alterations, second/third floor addition and rear yard deck). | — | Closed |
| Jan 16, 2025 | Building Permit Related(PS) | Plumbing - Proposal to construct multiple projects (second suite, interior alterations, second/third floor addition and rear yard deck). | — | Closed |
| Jan 15, 2025 | Multiple Projects | Proposal to construct multiple projects (second suite, interior alterations, second/third floor addition and rear yard deck). | $400K | Closed |
| Aug 23, 2024 | Building Permit Related (DR) | Drain - Proposal for a new Garden Suite | — | Closed |
| Aug 23, 2024 | New Laneway / Rear Yard Suite | Proposal for a new Garden Suite | $50K | Closed |
| Aug 23, 2024 | Building Permit Related(PS) | Plumbing - Proposal for a new Garden Suite | — | Closed |
| Aug 23, 2024 | Building Permit Related(MS) | HVAC - Proposal for a new Garden Suite | — | Closed |
| Mar 3, 2023 | Building Permit Related(MS) | HVAC - Proposal for interior alterations for a new secondary suite in the basement and benching. | — | Open |
| Dec 15, 2022 | Building Permit Related(PS) | Plumbing - PROPOSED INTERIOR ALTERATIONS THROUGHOUT | — | Closed |
| Nov 15, 2022 | Interior Alterations | PROPOSED INTERIOR ALTERATIONS THROUGHOUT | $75K | Closed |
| Jun 21, 2022 | Other(SR) | Replace existing rear balcony with new | $30K | Closed |
| Feb 3, 2022 | Other(SR) | install rooftop solar panels | $25K | Closed |
| Nov 12, 2021 | Interior Alterations | Proposal for interior alterations for a new secondary suite in the basement and benching. | $200K | Open |
| Nov 12, 2021 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations for a new secondary suite in the basement and benching. | — | Open |
| Aug 30, 2021 | Multiple Projects | Interior alterations, removal and replacement of the existing rear addition, underpinning, demolish and replace the third storey, a new rear deck, front porch/walkout and a detached garage | $500K | Closed |
| Aug 30, 2021 | Building Permit Related(PS) | Plumbing - Interior alterations, removal and replacement of the existing rear addition, underpinning, demolish and replace the third storey, a new rear deck, front porch/walkout and a detached garage | — | Closed |
| Aug 30, 2021 | Building Permit Related(MS) | HVAC - Interior alterations, removal and replacement of the existing rear addition, underpinning, demolish and replace the third storey, a new rear deck, front porch/walkout and a detached garage | — | Closed |
| Aug 5, 2021 | Interior Alterations | Proposal for interior alteration including removal of a loadbearing wall and including reinuskated exterior wall and new millwork, plumbing fixtures and appliances replaced in place. | $85K | Closed |
| Aug 5, 2021 | Multiple Projects | REVISION#2: WOOD BEAMS TO STEEL BEAMS ON GROUND FLOOR PLAN ONLY.Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 2 storey side addition, a new 3rd floor addition, interior alterations, a 3rd floor balcony and a rear deck. | — | Closed |
| Aug 5, 2021 | Building Permit Related(PS) | Plumbing - Proposal for interior alteration including removal of a loadbearing wall and including reinuskated exterior wall and new millwork, plumbing fixtures and appliances replaced in place. | — | Closed |
| Jul 7, 2021 | Building Permit Related(PS) | Revision 01 - to add laundry facilities on second floor Plumbing - Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 2 storey side addition, a new 3rd floor addition, interior alterations, a 3rd floor balcony and a rear deck. | — | Closed |
| Jul 6, 2021 | Building Permit Related(MS) | Revision 01 - as per bubbled areas on drawingsHVAC - Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 2 storey side addition, a new 3rd floor addition, interior alterations, a 3rd floor balcony and a rear deck. | — | Closed |
| Jul 2, 2021 | Building Permit Related (DR) | Drain - Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 2 storey side addition, a new 3rd floor addition, interior alterations, a 3rd floor balcony and a rear deck. | — | Closed |
| Aug 17, 2020 | Back Water Valve (Sewer only) | Proposal to install a back water valve. | — | Closed |
| Jul 11, 2019 | Building Permit Related(MS) | HVAC - Proposal for underpinning and beam column replacement in existing basement that will remain unfinished. Work includes a rear yard basement walkout. | — | Closed |
| Jun 26, 2019 | Back Water Valve (Sewer only) | Proposal to install back water valve. | — | Closed |
| May 23, 2019 | Building Permit Related(MS) | HVAC - Proposal for a rear 2 storey addition, interior alterations to all floors, new rear basement walkout, and 3 rear decks. Scope of work includes converting from a semi-detached single family dwelling into a converted house with 2 dwelling units. | — | Closed |
| May 14, 2019 | Building Permit Related (DR) | Drain - Proposal for underpinning and beam column replacement in existing basement that will remain unfinished. Work includes a rear yard basement walkout. | — | Closed |
| May 14, 2019 | Multiple Projects | Proposal for underpinning and beam column replacement in existing basement that will remain unfinished. Work includes a rear yard basement walkout. | $20K | Closed |
| Mar 28, 2019 | Multiple Projects | Revision 3: Revision rear walkout stairs, rear deck/cold room and basement interior alterations.Revision 2: to basement walkout as per bubbled drawingsRevision 1: to underpin the basementProposal for a rear 2 storey addition, interior alterations to all floors, new rear basement walkout, and 3 rear | — | Closed |
| Jan 9, 2019 | Building Permit Related(PS) | REV -01 For additional fixtures.Plumbing - Proposal for a rear 2 storey addition, interior alterations to all floors, new rear basement walkout, and 3 rear decks. Scope of work includes converting from a semi-detached single family dwelling into a converted house with 2 dwelling units. | — | Closed |
| Jan 3, 2018 | Multiple Projects | Proposed 1 storey rear addition to existing single family semi-detached dwelling and new deck at rear. | $250K | Open |
| Jun 7, 2017 | Building Permit Related(PS) | Plumbing - Proposal for bench footing, interior alterations. and rear deck with cold storage below in existing semi-detached single family dwelling. | — | Open |
The 40 most recent of 110 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Shannon St with a permit on record · 41
- 6 Shannon St2 permits · to 2019
- 8 Shannon St3 permits · to 2011
- 9 Shannon St2 permits · to 2016
- 10 Shannon St3 permits · to 2011
- 11 Shannon St3 permits · to 2016
- 12 Shannon St3 permits · to 2019
- 14 Shannon St9 permits · to 2013
- 18 Shannon St3 permits · to 2018
- 20 Shannon St2 permits · to 2022
- 22 Shannon St3 permits · to 2021
- 24 Shannon St1 permit · to 1996
- 33 Shannon St1 permit · to 2002
- 35 Shannon St2 permits · to 2016
- 36 Shannon St1 permit · to 2016
- 39 Shannon St1 permit · to 2015
- 41 Shannon St1 permit · to 2013
- 42 Shannon St1 permit · to 2013
- 43 Shannon St5 permits · to 2022
- 44 Shannon St2 permits · to 2009
- 45 Shannon St2 permits · to 2012
- 47 Shannon St1 permit · to 2000
- 49 Shannon St1 permit · to 2007
- 51 Shannon St2 permits · to 2012
- 54 Shannon St3 permits · to 2012
- 58 Shannon St3 permits · to 2002
- 59 Shannon St1 permit · to 1996
- 60 Shannon St5 permits · to 2013
- 61 Shannon St8 permits · to 2024
- 63 Shannon St4 permits · to 2025
- 65 Shannon St1 permit · to 2011
- 66 Shannon St3 permits · to 2017
- 67 Shannon St3 permits · to 2023
- 68 Shannon St7 permits · to 2025
- 70 Shannon St1 permit · to 2013
- 72 Shannon St1 permit · to 2013
- 73 Shannon St4 permits · to 2022
- 74 Shannon St1 permit · to 2020
- 76 Shannon St2 permits · to 2026
- 78 Shannon St2 permits · to 2007
- 80 Shannon St3 permits · to 2016
- 84 Shannon St4 permits · to 2016