Street · 862 of 8,516 by permit count
Building permits on Scarboro Cres, Scarborough
The City of Toronto has 211 building permits on record for Scarboro Cres in Scarborough, going back to 1999. Those permits created 12 homes and removed 7, a net change of +5. Declared construction value totals $8.1M. Half of the 201 permits issued here came through within 35 days of the application. The most recent permit was issued May 26, 2026 at 149 Scarboro Cres.
- Permits on record
- 2111999–2026
- Declared construction value
- $8.1Mas filed, not adjusted
- Homes created
- 12dwelling units
- Homes removed
- 7net +5
- Typical wait
- 35 days8 days slower than the city
Permits issued per year
Zoning
- Most common zone
- RD100.0% of permits · by-law 10.20
- In detached-house zones
- 100.0%62.0% above the city’s 38.0%
- Permits with a zone
- 211of 211 on record
The zoning categories the permits on Scarboro Cres fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M1M
Looking for one address on Scarboro Cres? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| May 26, 2026 | Deck | Proposed reconstruction of the pre-existing deck at the south side of house 149 Scarboro crescent. utilizing the original foundation posts/footers but replacing all the rotted wood elsewhere. | $6K | Open |
| May 8, 2026 | Deck | Proposed rebuild of the pre-existing deck with new pressure treated pine limber of the respective dimensions added in replacement of deck boards, railing guards, shade walls, columns, beams, stairs, and joists, excluding foundation. The current deck is in need of replacement of some structural compo | $6K | Closed |
| Oct 31, 2024 | New Building | REVISION TO PERMIT #22 206823 - DECK SIZE INCREASED | — | New build |
| Mar 21, 2024 | Back Water Valve (Sewer only) | Mainline backwater valve on the main sewer line | — | Closed |
| Nov 23, 2023 | Building Permit Related(MS) | HVAC - Construction of a new 2 Storey Dwelling including plumbing and drain | — | Closed |
| Oct 12, 2023 | Heat/Ventilation: SFD/Semi/TH | Proposed stand-alone HVAC permit for existing detached SFD. | — | Closed |
| Jun 27, 2023 | Multiple Projects | Proposal for rear addition and interior alterations | $200K | Closed |
| Jun 27, 2023 | Building Permit Related(PS) | Plumbing - Proposal for rear addition and interior alterations | — | Closed |
| Jun 2, 2023 | Other(SR) | Proposal to install a solar panel system on the rooftop of an existing SFD-detached dwelling. | $19K | Closed |
| May 11, 2023 | Back Water Valve (Sewer only) | Installation of a backwater valve | — | Open |
| Feb 13, 2023 | Deck | Proposed construction of rear deck with stairs | $200K | Closed |
| Jan 26, 2023 | Demolition | Demolition of a 1.5 Storey brick SFD | — | Demolition |
| Dec 14, 2022 | Building Permit Related (DR) | Drain - Construction of a new 2 Storey Dwelling including plumbing and drain | — | Closed |
| Dec 14, 2022 | Building Permit Related(PS) | Plumbing - Construction of a new 2 Storey Dwelling including plumbing and drain | — | Closed |
| Oct 7, 2022 | Building Permit Related(MS) | HVAC - Proposed interior alterations to all floors, and alterations to North, west and South elevations. | — | Closed |
| Sep 22, 2022 | Backflow Prevention Devices (Water only) | install backflow preventor | $3K | Closed |
| Aug 31, 2022 | Addition(s) | Proposal to construct a 3 season unheated sunroom and exit landing. | $119K | Closed |
| Jul 11, 2022 | Deck | Proposal for deck enlargement | $16K | Closed |
| Jul 7, 2022 | Interior Alterations | Proposed interior alterations to all floors, and alterations to North, west and South elevations. | $200K | Closed |
| Jul 7, 2022 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to all floors, and alterations to North, west and South elevations. | — | Closed |
| Sep 3, 2021 | Back Water Valve (Sewer only) | Full port main line back water valve | — | Closed |
| Jul 30, 2021 | Building Permit Related(PS) | Plumbing - Proposal for an addition and alterations to existing dwelling. | — | Open |
| Jul 30, 2021 | Multiple Projects | Proposal for an addition and alterations to existing dwelling. | $250K | Open |
| Dec 23, 2020 | New Building | REVISION 2 - revise insulation design in the basementTo demolish existing dwelling and construct new two storey dwelling with rear detached garage | — | New build |
| Dec 1, 2020 | Finishing Basements | Proposal to finish the basement of an existing SFD-detached dwelling. | $20K | Closed |
| Dec 1, 2020 | Building Permit Related(PS) | Plumbing - Proposal to finish the basement of an existing SFD-detached dwelling. | — | Closed |
| Oct 23, 2020 | Deck | Construct a cabana and deck | $40K | Closed |
| Sep 16, 2020 | Back Water Valve (Sewer only) | Proposal to install backwater valve for existing sfd | — | Closed |
| Jul 28, 2020 | Pool Fence Enclosure | Pool fence enclosure for an inground swimming pool | $40K | Closed |
| May 10, 2020 | Deck | Proposal for an extension to the existing rear deck of the detached dwelling | $4K | Closed |
| Sep 24, 2019 | Pool Fence Enclosure | Proposed installation of a new pool fence enclosure in the rear yard of an existing single family detached dwelling. | $5K | Closed |
| Sep 6, 2019 | Deck | Proposal to reconstruct the rear wood deck | $6K | Closed |
| Jun 3, 2019 | Building Permit Related(MS) | HVAC - To demolish existing dwelling and construct new two storey dwelling with rear detached garage | — | Closed |
| May 29, 2019 | Demolition | To demolish existing dwelling and a new two storey dwelling with rear detached garage | — | Demolition |
| May 29, 2019 | Building Permit Related (DR) | Drain - To demolish existing dwelling and construct new two storey dwelling with rear detached garage | — | Closed |
| May 29, 2019 | Building Permit Related(PS) | Plumbing - To demolish existing dwelling and construct new two storey dwelling with rear detached garage | — | Closed |
| May 13, 2019 | Porch | Proposed reconstruction of a porch in the front yard of the existing single family detached dwelling. | $18K | Closed |
| Jan 29, 2019 | Deck | Proposal to construct a rear yard deck | $5K | Closed |
| Nov 22, 2018 | Back Water Valve (Sewer only) | Proposal to install a back water valve | — | Closed |
| Aug 24, 2018 | Garage | Proposal to construct a detached garage in the rear yard of the existing single family dwelling. | $50K | Open |
The 40 most recent of 211 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Scarboro Cres with a permit on record · 53
- 4 Scarboro Cres3 permits · to 2008
- 12 Scarboro Cres7 permits · to 2020
- 21 Scarboro Cres5 permits · to 2015
- 36 Scarboro Cres4 permits · to 2022
- 38 Scarboro Cres2 permits · to 2021
- 42 Scarboro Cres2 permits · to 2017
- 44 Scarboro Cres9 permits · to 2019
- 46 Scarboro Cres2 permits · to 2004
- 48 Scarboro Cres1 permit · to 2003
- 50 Scarboro Cres1 permit · to 1999
- 52 Scarboro Cres3 permits · to 2014
- 58 Scarboro Cres9 permits · to 2014
- 118 Scarboro Cres8 permits · to 2018
- 120 Scarboro Cres3 permits · to 2009
- 122 Scarboro Cres4 permits · to 2008
- 124 Scarboro Cres3 permits · to 2016
- 126 Scarboro Cres1 permit · to 2015
- 128 Scarboro Cres6 permits · to 2012
- 135 Scarboro Cres4 permits · to 2015
- 136 Scarboro Cres6 permits · to 2023
- 139 Scarboro Cres1 permit · to 2012
- 142 Scarboro Cres4 permits · to 2018
- 148 Scarboro Cres2 permits · to 2020
- 149 Scarboro Cres6 permits · to 2026
- 151 Scarboro Cres3 permits · to 2007
- 154 Scarboro Cres6 permits · to 2023
- 160 Scarboro Cres2 permits · to 2023
- 168 Scarboro Cres2 permits · to 2016
- 174 Scarboro Cres4 permits · to 2004
- 177 Scarboro Cres4 permits · to 2003
- 178 Scarboro Cres3 permits · to 2011
- 181 Scarboro Cres5 permits · to 2018
- 186 Scarboro Cres3 permits · to 2008
- 188 Scarboro Cres1 permit · to 2013
- 189 Scarboro Cres7 permits · to 2012
- 194 Scarboro Cres1 permit · to 2021
- 198 Scarboro Cres6 permits · to 2018
- 199 Scarboro Cres1 permit · to 2006
- 202 Scarboro Cres1 permit · to 2014
- 203 Scarboro Cres7 permits · to 2024
- 213 Scarboro Cres3 permits · to 2015
- 215 Scarboro Cres2 permits · to 2008
- 224 Scarboro Cres5 permits · to 2011
- 225 Scarboro Cres6 permits · to 2012
- 226 Scarboro Cres1 permit · to 2000
- 227 Scarboro Cres5 permits · to 2016
- 264 Scarboro Cres4 permits · to 2020
- 265 Scarboro Cres5 permits · to 2020
- 266 Scarboro Cres7 permits · to 2019
- 268 Scarboro Cres5 permits · to 2024
- 270 Scarboro Cres8 permits · to 2017
- 272 Scarboro Cres3 permits · to 2014
- 276 Scarboro Cres5 permits · to 2016