Building permits on Royal St, York

The City of Toronto has 60 building permits on record for Royal St in York, going back to 2000. Those permits created 3 homes and removed 0, a net change of +3. Declared construction value totals $780K. Half of the 52 permits issued here came through within 11 days of the application. The most recent permit was issued Oct 8, 2026 at 1 Royal St.

Permits on record
602000–2026
Declared construction value
$780Kas filed, not adjusted
Homes created
3dwelling units
Homes removed
0net +3
Typical wait
11 days16 days faster than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
RS70.0% of permits · by-law 10.40
In detached-house zones
0.0%38.0% below the city’s 38.0%
Permits with a zone
60of 60 on record
  • Residential60 · 100%

The zoning categories the permits on Royal St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Other streets in M6N

Blakley Ave62 permits
Bushey Ave61 permits
Rowntree Ave60 permits
Delemere Ave58 permits
Ford St56 permits
Bexley Cres53 permits
Pelham Ave53 permits

Looking for one address on Royal St? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Oct 8, 2026 Back Water Valve (Sewer only) Back water valve on sewer line — Closed
Aug 12, 2024 Building Permit Related (DR) Drain - Underpinning, lowering and alterations to the basement. — Closed
Aug 12, 2024 Multiple Projects Underpinning, lowering and alterations to the basement. $100K Closed
Aug 12, 2024 Building Permit Related(PS) Plumbing - Underpinning, lowering and alterations to the basement. — Closed
Aug 12, 2024 Party Wall Admin Permits Admin permit for the work at 6 Royal st. - see 24 178392 6 Royal St. — Open
Jun 13, 2024 Back Water Valve (Sewer only) Proposal to install a back water valve — Closed
Apr 6, 2023 Building Permit Related(PS) Plumbing - Basement underpinning — Open
Mar 27, 2023 Party Wall Admin Permits Party wall admin permit regarding 25 Royal St — Closed
Mar 27, 2023 Underpinning Basement underpinning $20K Open
Mar 27, 2023 Building Permit Related (DR) Drain - Basement underpinning — Open
Mar 6, 2023 Back Water Valve (Sewer only) Install back water valve — Closed
Aug 30, 2021 Back Water Valve (Sewer only) INSTALL BACKWATER VALVE ON SANITARY LINE — Closed
Apr 22, 2021 Addition(s) Proposed enlcose back entrance to connect existing house to existing storage room see existing permit = 19 - 151794. $2K Closed
Jan 15, 2021 Multiple Projects Proposal for rear and 3rd floor addition, interior alterations to all the existing and new secondary suite $200K Closed
Jan 15, 2021 Building Permit Related(PS) Plumbing - Proposal for rear and 3rd floor addition, interior alterations to all the existing and new secondary suite — Closed
Jan 15, 2021 Building Permit Related(MS) HVAC - Proposal for rear and 3rd floor addition, interior alterations to all the existing and new secondary suite — Closed
Jun 9, 2020 Canopy Proposal to construct a roof over the existing veranda $2K Open
Aug 22, 2019 Multiple Projects As built rear yard deck and canopy $10K Closed
Jul 11, 2019 Back Water Valve (Sewer only) Install one backwater valve. — Closed
Feb 11, 2019 Multiple Projects Proposal to construct a rear two-storey addition, interior alterations to basement to allow for secondary suite, new basement walkout, new wood deck. $100K Closed
Feb 11, 2019 Party Wall Admin Permits Admin permit related to work being completed 26 Royal St. See building permit #19-103201 BLD — Closed
Feb 11, 2019 Building Permit Related(PS) Plumbing - Proposal to construct a rear two-storey addition, interior alterations to basement to allow for secondary suite, new basement walkout, new wood deck. — Closed
Feb 11, 2019 Building Permit Related(MS) HVAC - Proposal to construct a rear two-storey addition, interior alterations to basement to allow for secondary suite, new basement walkout, new wood deck. — Closed
Jul 26, 2018 Back Water Valve (Sewer only) Proposal to install back water valve — Closed
Jan 31, 2018 Back Water Valve (Sewer only) Back Water Valve (Sewer only) and sump pump — Closed
Jan 31, 2018 Building Permit Related (DR) Drain - Proposal for underpinning for existing SFD- Semi Detached dwelling. — Closed
Jan 15, 2018 Party Wall Admin Permits Proposal for partywall for work being done at 9 Royal street — Closed
Nov 22, 2017 Underpinning Proposal for underpinning for existing SFD- Semi Detached dwelling. $20K Closed
Nov 22, 2017 Building Permit Related(PS) Plumbing - Proposal for underpinning for existing SFD- Semi Detached dwelling. — Closed
Oct 19, 2017 Back Water Valve (Sewer only) Proposal to install a back water valve — Closed
Sep 27, 2017 Other(SR) Roof repair to the existing one-storey portion at the rear of existing semi-detached SFD. $10K Closed
Jun 20, 2017 Multiple Projects Proposal for underpinning, construct rear deck and interior alterations to 1st floor of existing SFD- detached dwelling. $50K Closed
Jun 20, 2017 Building Permit Related(PS) Plumbing - Proposal for underpinning, construct rear deck and interior alterations to 1st floor of existing SFD- detached dwelling. — Closed
Apr 10, 2017 Back Water Valve (Sewer only) Back Water Valve (Sewer only) — Closed
Mar 15, 2017 Back Water Valve (Sewer only) Proposal to install a backwater valve on the sanitary line in an existing SFD-detached dwelling. — Closed
Nov 24, 2015 Party Wall Admin Permits Party Wall Admin Permit — Closed
Oct 15, 2015 Building Permit Related(MS) Revision 01 - Proposed revision to revise duct sizing. HVAC - Construct interior alterations to existing dwelling (72m2) and finished basement (32m2) — Closed
Aug 10, 2015 Building Permit Related(PS) Plumbing - Construct interior alterations to existing dwelling (72m2) and finished basement (32m2) — Closed
Aug 10, 2015 Building Permit Related (DR) Drain - Construct interior alterations to existing dwelling (72m2) and finished basement (32m2) — Closed
Jul 8, 2015 Fixtures/Roof Drains: SFD install laundry tub in basement $1K Closed

The 40 most recent of 60 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Royal St with a permit on record · 28

  • 1 Royal St1 permit · to 2026
  • 2 Royal St2 permits · to 2019
  • 4 Royal St1 permit · to 2024
  • 5 Royal St1 permit · to 2019
  • 6 Royal St3 permits · to 2024
  • 7 Royal St2 permits · to 2018
  • 8 Royal St3 permits · to 2017
  • 9 Royal St5 permits · to 2018
  • 10 Royal St1 permit · to 2023
  • 14 Royal St1 permit · to 2018
  • 15 Royal St1 permit · to 2021
  • 20 Royal St1 permit · to 2015
  • 21 Royal St5 permits · to 2017
  • 23 Royal St1 permit · to 2023
  • 24 Royal St4 permits · to 2019
  • 25 Royal St3 permits · to 2023
  • 26 Royal St3 permits · to 2019
  • 28 Royal St1 permit · to 2010
  • 30 Royal St1 permit · to 2017
  • 31 Royal St1 permit · to 2024
  • 33 Royal St1 permit · to 2004
  • 35 Royal St1 permit · to 2015
  • 38 Royal St3 permits · to 2002
  • 39 Royal St1 permit · to 2001
  • 42 Royal St2 permits · to 2021
  • 44 Royal St3 permits · to 2012
  • 46 Royal St7 permits · to 2021
  • 47 Royal St1 permit · to 2017
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
60
Data through
2026-10-23
Refresh
Daily from the City
Sheet
STR-223