Street · 309 of 8,516 by permit count
Building permits on Robert St
The City of Toronto has 467 building permits on record for Robert St, going back to 1992. Those permits created 18 homes and removed 4, a net change of +14. Declared construction value totals $15.3M. Half of the 444 permits issued here came through within 16 days of the application. The most recent permit was issued Oct 30, 2026 at 8 Robert St.
- Permits on record
- 4671992–2026
- Declared construction value
- $15.3Mas filed, not adjusted
- Homes created
- 18dwelling units
- Homes removed
- 4net +14
- Typical wait
- 16 days11 days faster than the city
Permits issued per year
Zoning
- Most common zone
- R85.5% of permits · by-law 10.10
- In detached-house zones
- 13.9%24.1% below the city’s 38.0%
- Permits with a zone
- 461of 467 on record
The zoning categories the permits on Robert St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Minor variances at the Committee of Adjustment
- Applications on record
- 26since 2016
- Approved
- 87.0%3.8% below the city · 23 decided
- Median time to a decision
- 146 days26 days slower than the city
Some projects on Robert St need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. Back to back, that is about 162 days, not the 16 days the permit figure alone suggests. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Where this street runs
Other streets in M5S
Looking for one address on Robert St? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 30, 2026 | Building Permit Related(PS) | Plumbing - Proposal for multiple projects (conversion of place of worship to 4 unit dwelling, addition, interior alterations and change of use). | — | Open |
| Oct 30, 2026 | Building Permit Related(MS) | HVAC - Proposal for multiple projects (conversion of place of worship to 4 unit dwelling, addition, interior alterations and change of use). | — | Open |
| Oct 30, 2026 | Multiple Projects | Proposal for multiple projects (conversion of place of worship to 4 unit dwelling, addition, interior alterations and change of use). | $1.8M | Open |
| Oct 23, 2026 | Multiple Projects | Revision to Update on Revision 01 by Examiner( AS PER CONFIRMED BY HOME OWNER) The basement secondary suite proposed in main application has been taken from the scope of work ( Updated on 06/17/2024) REVISION - interior layout changesProposal to construct third-storey addition and interior alteratio | — | Open |
| Aug 28, 2026 | New Building | REV02: Proposed revision for updated site planRevision 01: Revision to drawings. Proposal to demolish existing dwelling and construct a new 3 storey fourplex. | — | New build |
| Jul 21, 2026 | New Laneway / Rear Yard Suite | Revision 01; Proposal to revise basement walkout, second floor balcony and interior layout.Proposed two storey laneway suite. | — | Open |
| Jun 17, 2026 | Multiple Projects | REVISION - structural changes as per the drawingsProposal to convert existing single family townhouse to a duplex with separate entrance/exit. | — | Open |
| Jun 10, 2026 | Interior Alterations | Proposal for rear ground floor interior renovation to kitchen and powder room. Scope inlcudes new windows and door in kitchen area. No exterior work except rear window/door openings. No alterations to character defining elements of designated part V single family home. | $125K | Open |
| Jun 10, 2026 | Building Permit Related(PS) | Plumbing - Proposal for rear ground floor interior renovation to kitchen and powder room. Scope inlcudes new windows and door in kitchen area. No exterior work except rear window/door openings. No alterations to character defining elements of designated part V single family home. | — | Open |
| May 25, 2026 | Back Water Valve (Sewer only) | Proposal to install a back water valve installation | — | Closed |
| May 15, 2026 | Party Wall Admin Permits | Proposal for a party wall admin permit related to 144 Robert St | $1K | Open |
| May 6, 2026 | Building Permit Related(MS) | HVAC - Proposal to convert existing single family townhouse to three residential dwelling units with separate entrance/exit. | — | Open |
| May 6, 2026 | Building Permit Related(PS) | Plumbing - Proposal to convert existing single family townhouse to three residential dwelling units with separate entrance/exit. | — | Open |
| Apr 28, 2026 | Building Permit Related (DR) | Drain - Proposal to demolish existing dwelling and construct a new 3 storey fourplex. | — | Open |
| Apr 28, 2026 | Building Permit Related(PS) | Plumbing - Proposal to demolish existing dwelling and construct a new 3 storey fourplex. | — | Open |
| Apr 27, 2026 | Multiple Projects | Revision 01 as per bubbled drawings.Proposal for 2 storey rear addition, interior alterations and new deck.**See Related Party Wall Permits** | — | Open |
| Apr 15, 2026 | Building Permit Related(PS) | Plumbing - Proposed minor interior basement renovation, new bathroom. | — | Open |
| Apr 15, 2026 | Second Suite (New) | Proposed minor interior basement renovation, new bathroom to an Existing Townhouse, and an addition of a new unit. | $5K | Open |
| Apr 2, 2026 | New Laneway / Rear Yard Suite | Rev 01: changes to layouts and walk-out stairsProposal for 2 storey laneway suite with basement. | — | Open |
| Mar 11, 2026 | Building Permit Related(PS) | Plumbing - Proposed two storey garden suite with basement in the rear yard. | — | Open |
| Mar 11, 2026 | Building Permit Related (DR) | Drain - Proposed two storey garden suite with basement in the rear yard. | — | Open |
| Aug 8, 2025 | Building Permit Related (DR) | Drain - Proposal for 2 storey laneway suite with basement. | — | Open |
| Aug 8, 2025 | Building Permit Related(PS) | Plumbing - Proposal for 2 storey laneway suite with basement. | — | Open |
| Jun 24, 2025 | Demolition | Proposal to demolish existing dwelling and construct a new 3 storey fourplex. | — | Demolition |
| Jun 17, 2025 | Garage | Proposed rear yard, detached garage and driveway for a single family dwelling townhouse. | $50K | Closed |
| Mar 24, 2025 | Building Permit Related(MS) | HVAC - Proposed second storey addition and interior alterations and a new rear patio. | — | Closed |
| Mar 4, 2025 | Building Permit Related(PS) | REVISION 01 : reduce the size of the previousy approved rear third storey addition Plumbing - Rear third storey addition (39m2) to include new bedroom and ensuite, interior alterations to the existing second and third floor levels (49m2), basement underpinning (42 lin.m), basement finishing (65m2), | — | Closed |
| Feb 27, 2025 | Building Permit Related(MS) | Rev 01 - Proposal to relocate the ground floor utility room to second floor.HVAC - Proposal for interior layout modification, second floor and third floor addition in side/rear yard, rear 2nd floor balcony, and basement secondary unit. | — | Closed |
| Feb 24, 2025 | Multiple Projects | REVISION 01 : reduce the size of the previousy approved rear third storey addition, with no cantilever over the existing second floor. The previously identified ensuite bathroom will now be a three piece bathroom within the existing third floor area. The revision also includes a proposed rooftop bal | — | Closed |
| Feb 19, 2025 | Building Permit Related(PS) | REV01: Revision to 24 155596 BLD 00 SR and 24 155596 PLB 00 PSinterior updates to third floor, updated stairs from second to third floorPlumbing - To construct a third floor addition to existing dwelling | — | Closed |
| Feb 18, 2025 | Addition(s) | REV01: Revision to 24 155596 BLD 00 SR and 24 155596 PLB 00 PSinterior updates to third floor, updated stairs from second to third floorTo construct a third floor addition to existing dwelling | — | Closed |
| Jan 31, 2025 | Building Permit Related(MS) | HVAC - To construct a third floor addition to existing dwelling | — | Closed |
| Jan 10, 2025 | Multiple Projects | Proposed second storey addition and interior alterations and a new rear patio. | $900K | Closed |
| Jan 10, 2025 | Building Permit Related(PS) | Plumbing - Proposed second storey addition and new basement unit, interior alterations and a new rear patio. | — | Closed |
| Dec 18, 2024 | Building Permit Related (DR) | Drain - Proposal for a laneway suite. | — | Closed |
| Dec 18, 2024 | New Laneway / Rear Yard Suite | Proposal for a laneway suite. | $400K | Closed |
| Dec 18, 2024 | Building Permit Related(PS) | Plumbing - Proposal for a laneway suite. | — | Closed |
| Nov 22, 2024 | Building Permit Related (DR) | Drain - Proposed underpinning of an Existing Single Family Dwelling Townhouse. | — | Closed |
| Nov 22, 2024 | Building Permit Related(PS) | Plumbing - Proposed underpinning of an Existing Single Family Dwelling Townhouse. | — | Closed |
| Oct 31, 2024 | Interior Alterations | Proposal for interior alterations, increasing bedrooms and washrooms to the existing single family dwelling. | $100K | Closed |
The 40 most recent of 467 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Robert St with a permit on record · 134
- 2 Robert St1 permit · to 2002
- 6 Robert St4 permits · to 2026
- 8 Robert St4 permits · to 2026
- 12 Robert St2 permits · to 2004
- 13 Robert St7 permits · to 2020
- 18 Robert St2 permits · to 2000
- 22 Robert St1 permit · to 2011
- 26 Robert St8 permits · to 2022
- 27 Robert St1 permit · to 2020
- 28 Robert St1 permit · to 2016
- 29 Robert St1 permit · to 1992
- 30 Robert St1 permit · to 2019
- 31 Robert St4 permits · to 2004
- 32 Robert St6 permits · to 2016
- 33 Robert St6 permits · to 2017
- 34 Robert St3 permits · to 2008
- 36 Robert St6 permits · to 2022
- 37 Robert St1 permit · to 2015
- 38 Robert St3 permits · to 2018
- 39 Robert St3 permits · to 2011
- 40 Robert St5 permits · to 2026
- 42 Robert St2 permits · to 2018
- 43 Robert St1 permit · to 2002
- 44 Robert St4 permits · to 2010
- 46 Robert St3 permits · to 2026
- 49 Robert St3 permits · to 2015
- 50 Robert St4 permits · to 2013
- 52 Robert St3 permits · to 2013
- 54 Robert St5 permits · to 2024
- 56 Robert St5 permits · to 2026
- 59 Robert St2 permits · to 2018
- 60 Robert St1 permit · to 2011
- 61 Robert St1 permit · to 2017
- 62 Robert St1 permit · to 2011
- 64 Robert St1 permit · to 2011
- 65 Robert St1 permit · to 2018
- 66 Robert St5 permits · to 2024
- 68 Robert St8 permits · to 2024
- 69 Robert St1 permit · to 1999
- 71 Robert St7 permits · to 2025
- 72 Robert St4 permits · to 2012
- 73 Robert St3 permits · to 2010
- 74 Robert St1 permit · to 2016
- 77 Robert St6 permits · to 2026
- 79 Robert St7 permits · to 2026
- 81 Robert St1 permit · to 2004
- 82 Robert St4 permits · to 2011
- 84 Robert St2 permits · to 2009
- 86 Robert St4 permits · to 2009
- 88 Robert St1 permit · to 2008
- 92 Robert St3 permits · to 2021
- 98 Robert St5 permits · to 2020
- 99 Robert St1 permit · to 2019
- 101 Robert St4 permits · to 2020
- 102 Robert St6 permits · to 2019
- 103 Robert St11 permits · to 2012
- 104 Robert St3 permits · to 2019
- 105 Robert St4 permits · to 2021
- 106 Robert St1 permit · to 2018
- 111 Robert St4 permits · to 2011
- 113 Robert St7 permits · to 2024
- 117 Robert St3 permits · to 2022
- 118 Robert St4 permits · to 2023
- 120 Robert St2 permits · to 2022
- 121 Robert St4 permits · to 2019
- 124 Robert St5 permits · to 2026
- 126 Robert St4 permits · to 2023
- 127 Robert St6 permits · to 2019
- 128 Robert St4 permits · to 2023
- 134 Robert St2 permits · to 2013
- 138 Robert St2 permits · to 2024
- 144 Robert St3 permits · to 2026
- 145 Robert St5 permits · to 2018
- 146 Robert St4 permits · to 2026
- 147 Robert St1 permit · to 2012
- 148 Robert St5 permits · to 2025
- 149 Robert St3 permits · to 2013
- 151 Robert St3 permits · to 2017
- 153 Robert St5 permits · to 2017
- 154 Robert St1 permit · to 2008
- 156 Robert St3 permits · to 2008
- 158 Robert St2 permits · to 2008
- 160 Robert St4 permits · to 2004
- 161 Robert St11 permits · to 2024
- 163 Robert St9 permits · to 2024
- 164 Robert St1 permit · to 2007
- 168 Robert St3 permits · to 2009
- 169 Robert St6 permits · to 2019
- 170 Robert St3 permits · to 2013
- 171 Robert St2 permits · to 2006
- 172 Robert St1 permit · to 2013
- 174 Robert St4 permits · to 2011
- 180 Robert St4 permits · to 2017
- 196 Robert St3 permits · to 2015
- 200 Robert St2 permits · to 2024
- 202 Robert St6 permits · to 2025
- 204 Robert St5 permits · to 2024
- 206 Robert St4 permits · to 2011
- 208 Robert St3 permits · to 2018
- 210 Robert St1 permit · to 2017
- 212 Robert St5 permits · to 2005
- 216 Robert St4 permits · to 2014
- 218 Robert St3 permits · to 2017
- 220 Robert St7 permits · to 2018
- 224 Robert St3 permits · to 2019
- 226 Robert St4 permits · to 2018
- 228 Robert St4 permits · to 2005
- 238 Robert St1 permit · to 2008
- 240 Robert St1 permit · to 2014
- 242 Robert St5 permits · to 2017
- 246 Robert St1 permit · to 2021
- 250 Robert St3 permits · to 2013
- 252 Robert St3 permits · to 2015
- 254 Robert St5 permits · to 2021
- 256 Robert St8 permits · to 2023
- 258 Robert St4 permits · to 2023
- 264 Robert St1 permit · to 2018
- 268 Robert St1 permit · to 2013
- 270 Robert St1 permit · to 2016
- 274 Robert St2 permits · to 2005
- 276 Robert St1 permit · to 2026
- 282 Robert St1 permit · to 2009
- 284 Robert St4 permits · to 2022
- 286 Robert St2 permits · to 2016
- 292 Robert St9 permits · to 2016
- 294 Robert St1 permit · to 2015
- 304 Robert St5 permits · to 2017
- 306 Robert St3 permits · to 2012
- 308 Robert St2 permits · to 2008
- 310 Robert St7 permits · to 2021
- 312 Robert St4 permits · to 2020
- 314 Robert St6 permits · to 2023
- 316 Robert St2 permits · to 2018
- 318 Robert St1 permit · to 2023