Street · 3640 of 8,516 by permit count
Building permits on Rippleton Rd, North York
The City of Toronto has 43 building permits on record for Rippleton Rd in North York, going back to 1990. Those permits created 2 homes and removed 2, a net change of +0. Declared construction value totals $1.6M. Half of the 39 permits issued here came through within 24 days of the application. The most recent permit was issued Aug 22, 2023 at 37 Rippleton Rd.
- Permits on record
- 431990–2023
- Declared construction value
- $1.6Mas filed, not adjusted
- Homes created
- 2dwelling units
- Homes removed
- 2net +0
- Typical wait
- 24 days3 days faster than the city
Permits issued per year
Zoning
- Most common zone
- RD100.0% of permits · by-law 10.20
- In detached-house zones
- 100.0%62.0% above the city’s 38.0%
- Permits with a zone
- 27of 43 on record
The zoning categories the permits on Rippleton Rd fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M3B
Looking for one address on Rippleton Rd? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 22, 2023 | Building Permit Related(MS) | HVAC - Interior alterations throughout the dwelling, basement walkout and rear deck. | — | Closed |
| Jul 26, 2023 | Multiple Projects | Rev 01Interior alterations throughout the dwelling, basement walkout and rear deck. | — | Closed |
| Jun 20, 2023 | Building Permit Related (DR) | Drain - Interior alterations throughout the dwelling, basement walkout and rear deck. | — | Closed |
| Jun 20, 2023 | Building Permit Related(PS) | Plumbing - Interior alterations throughout the dwelling, basement walkout and rear deck. | — | Closed |
| Dec 23, 2021 | Back Water Valve (Sewer only) | installation backwater valve | — | Closed |
| Nov 5, 2021 | Building Permit Related(MS) | HVAC - Proposal to construct a new 2 storey single family dwelling with finished basement and integral garage. | — | Closed |
| Jan 27, 2021 | Demolition | Proposal to demolish the existing single family dwelling and construct new dwelling. | — | Demolition |
| Jan 27, 2021 | Building Permit Related (DR) | Drain - Proposal to construct a new 2 storey single family dwelling with finished basement and integral garage. | — | Closed |
| Jan 27, 2021 | New Building | Proposal to construct a new 2 storey single family dwelling with finished basement and integral garage. | $500K | New build |
| Jan 27, 2021 | Building Permit Related(PS) | Plumbing - Proposal to construct a new 2 storey single family dwelling with finished basement and integral garage. | — | Closed |
| Apr 14, 2020 | Interior Alterations | PROPOSAL TO REPLACE STORAGE ROOM CEILING SLAB | $150K | Closed |
| Oct 8, 2019 | New Building | Revision 01: changes regarding the size of the rear yard deck. Proposal to demolish 1-storey existing sfd-detached and construct new 2-storey sfd-detached with integral garage. | — | New build |
| Apr 10, 2018 | Interior Alterations | Revision 01: Revision to the roof structure, ground floor framing and replacement of the beam in the master bedroomInterior alterations to ground floor | — | Closed |
| Dec 1, 2017 | Building Permit Related(MS) | HVAC - Proposal to demolish 1-storey existing sfd-detached and construct new 2-storey sfd-detached with integral garage. | — | Closed |
| Sep 8, 2017 | Demolition | Proposal to demolish 1-storey existing sfd-detached and construct new 2-storey sfd-detached with integral garage. See 17 206589NH. | — | Demolition |
| Sep 8, 2017 | Building Permit Related (DR) | Drain - Proposal to demolish 1-storey existing sfd-detached and construct new 2-storey sfd-detached with integral garage. | — | Closed |
| Sep 8, 2017 | Building Permit Related(PS) | Plumbing - Proposal to demolish 1-storey existing sfd-detached and construct new 2-storey sfd-detached with integral garage. | — | Closed |
| Jul 31, 2017 | Building Permit Related(PS) | Plumbing - Interior alterations to ground floor | — | Closed |
| Sep 6, 2016 | Solar Collector | Proposal to install a photovoltaic array on the rooftop of an existing elementary school - Rippleton Public School | $16K | Closed |
| Sep 10, 2015 | Non-Certified Portables | Proposal to relocate 1 portable. Rippleton Public School. | $50K | Closed |
| Jul 4, 2013 | Building Permit Related(PS) | Plumbing - Interior Alterations to Toronto District School Board Elementary Rippleton School for kindergarten classrooms no after school childcare programs in room 106 & 107. | — | Closed |
| Jul 4, 2013 | Building Permit Related(MS) | HVAC - Interior Alterations to Toronto District School Board Elementary Rippleton School for kindergarten classrooms no after school childcare programs in room 106 & 107 | — | Closed |
| Jun 14, 2013 | Interior Alterations | Interior Alterations to Toronto District School Board Elementary Rippleton School for kindergarten classrooms no after school childcare programs in room 106 & 107 | $100K | Closed |
| Mar 22, 2013 | Inside and Outside Drains | Drain - Rippleton Public School - Modular Classroom addition and Interior alteration to existing kindergarten | $50K | Closed |
| Mar 22, 2013 | Building Permit Related(PS) | Plumbing - Rippleton Public School - Modular Classroom addition and Interior alteration to existing kindergarten | — | Closed |
| Mar 22, 2013 | Building Permit Related(MS) | HVAC - Rippleton Public School - Modular Classroom addition and Interior alteration to existing kindergarten | — | Closed |
| Mar 22, 2013 | Multiple Projects | Rippleton Public School - Modular Classroom addition and Interior alteration to existing kindergarten | $350K | Closed |
| Dec 3, 2012 | Backflow Prevention Devices (Water only) | Installation of a premise isolation 3" backflow preventor on main line | $15K | Closed |
| Nov 26, 2012 | New Building | Revision to make rear deck smaller | — | New build |
| Oct 14, 2011 | Building Permit Related(PS) | Plumbing - two storey dwelling with intergral garage. | — | Closed |
| Oct 14, 2011 | Building Permit Related (DR) | Drain - two storey dwelling with intergral garage. | — | Closed |
| Sep 28, 2011 | Building Permit Related(MS) | HVAC - two storey dwelling with intergral garage. | — | Closed |
| Aug 25, 2011 | Demolition | Demolish one storey dwelling. | — | Demolition |
| Apr 3, 2006 | Pool Fence Enclosure | Construct Pool Fence Enclosure for inground swimming pool. | $6K | Closed |
| Feb 27, 2003 | Building Permit Related(MS) | REVISION TO HVAC | — | Closed |
| Nov 14, 2002 | Building Permit Related(PS) | Plumbing - TO CONSTRUCT A TWO STOREY DWELLING ON A VACANT LOT. - New Building | — | Closed |
| Aug 16, 2002 | Building Permit Related(PS) | PROPOSED NEW UNDER GROUND DRAIN TO ORIG. PERMIT NO 02-136071 | — | Closed |
| Jul 16, 2002 | New Building | TO CONSTRUCT A TWO STOREY DWELLING ON A VACANT LOT. | $386K | New build |
| Mar 23, 1999 | Alteration to Existing Building | REV:B9803737 | — | Closed |
| Feb 1, 1999 | HVAC: SFD/Semi/TH | A PERMIT-HVAC | — | Closed |
The 40 most recent of 43 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Rippleton Rd with a permit on record · 10
- 16 Rippleton Rd5 permits · to 2006
- 21 Rippleton Rd11 permits · to 2020
- 26 Rippleton Rd4 permits · to 1999
- 28 Rippleton Rd1 permit · to 1990
- 32 Rippleton Rd5 permits · to 2019
- 37 Rippleton Rd4 permits · to 2023
- 38 Rippleton Rd5 permits · to 2012
- 39 Rippleton Rd5 permits · to 2021
- 44 Rippleton Rd2 permits · to 2018
- 52 Rippleton Rd1 permit · to 2021