Street · 4645 of 8,516 by permit count
Building permits on Production Dr, Scarborough
The City of Toronto has 28 building permits on record for Production Dr in Scarborough, going back to 2005. Declared construction value totals $3.5M. Half of the 21 permits issued here came through within 44 days of the application. The most recent permit was issued Mar 29, 2022 at 30 Production Dr.
- Permits on record
- 282005–2022
- Declared construction value
- $3.5Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 44 days17 days slower than the city
Permits issued per year
Zoning
- Most common zone
- E100.0% of permits · by-law 60.20
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 27of 28 on record
The zoning categories the permits on Production Dr fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M1H
Looking for one address on Production Dr? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Mar 29, 2022 | Sign Building Permit Related | To erect and display one first party, static, illuminated wall sign. Sign is located in Ward #24 Scarborough-Guildwood, and is subject to sign district E-Employment.SIGN DIMENSIONS:1.74m L x 19.21m W x 0.08m D x 4.94m H **Best Deal Graphics & Printing** | — | Closed |
| May 19, 2021 | Building Permit Related (DR) | Drain - Construct second floor office addition to existing industrial building. | — | Closed |
| May 19, 2021 | Building Permit Related(PS) | Plumbing - Construct second floor office addition to existing industrial building. | — | Closed |
| May 19, 2021 | Building Permit Related(MS) | HVAC - Construct second floor office addition to existing industrial building. | — | Closed |
| May 19, 2021 | Addition(s) | Construct second floor office addition to existing industrial building. | $2.0M | Closed |
| Mar 4, 2021 | Building Permit Related(MS) | Revision 01: changes to the hvac system | — | Closed |
| Apr 3, 2019 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to an exsting industrial building - UNIT 1 | — | Closed |
| Apr 3, 2019 | Interior Alterations | Proposal for interior alterations to an exsting industrial building - UNIT 1 | $8K | Closed |
| Jan 25, 2018 | Special Ventilation System | Installation of four spray paint booths and two makeup air units. | $160K | Closed |
| Jan 25, 2018 | Interior Alterations | Installation of four spray paint booths and two makeup air units. | $160K | Closed |
| Nov 15, 2016 | Backflow Prevention Devices (Water only) | Installation of a backflow prevention device | $2K | Closed |
| May 31, 2016 | Building Permit Related(PS) | Plumbing - construct addition at rear | — | Open |
| May 31, 2016 | Addition(s) | construct addition at rear | $300K | Open |
| May 30, 2016 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - construct addition at rear | — | Open |
| Apr 8, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a 3/4" DVCA back flow prevention device in the existing industrial building. | $3K | Closed |
| Apr 7, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a 1" DVCA back flow prevention device in the existing industrial building. | $3K | Closed |
| Nov 26, 2015 | Backflow Prevention Devices (Water only) | New testable back flow preventer | $2K | Closed |
| Nov 26, 2015 | Backflow Prevention Devices (Water only) | Install one DCVA back flow preventer | $1K | Closed |
| Jun 11, 2015 | Solar Collector | To install a solar collector array on roof of existing building | $350K | Closed |
| Aug 4, 2010 | Addition(s) | Pedestrian Walkway to connect 20 Production Dr to 30 Production Dr | $150K | Closed |
| Aug 4, 2010 | Addition(s) | Pedestrian Walkway to connect 20 Production Dr to 30 Production Dr | $150K | Open |
| Jul 16, 2010 | Backflow Prevention Devices (Water only) | install 1 backflow device | $4K | Closed |
| Jul 5, 2010 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - enclosed loading area addition to connect 20 Production Dr to 30 Production Dr | — | Open |
| Jul 5, 2010 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - enclosed loading area addition to connect 20 Production Dr to 30 Production Dr | — | Open |
| Jan 15, 2010 | Backflow Prevention Devices (Water only) | Install 1 backflow preventer | $3K | Closed |
| Sep 9, 2008 | Building Permit Related(MS) | HVAC - Warehouse addition at rear of building | — | Closed |
| Sep 9, 2008 | Addition(s) | Warehouse addition at rear of building | $200K | Open |
| Aug 24, 2005 | Special Ventilation System | INSTALLATION OF DUST COLLECTOR SYSTEM FOR WOOD WORKSHOP | $50K | Closed |
The 28 most recent of 28 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Production Dr with a permit on record · 10
- 20 Production Dr9 permits · to 2021
- 30 Production Dr8 permits · to 2022
- 40 Production Dr1 permit · to 2015
- 50 Production Dr1 permit · to 2015
- 51 Production Dr1 permit · to 2015
- 52 Production Dr1 permit · to 2015
- 60 Production Dr1 permit · to 2016
- 70 Production Dr2 permits · to 2010
- 80 Production Dr1 permit · to 2010
- 90 Production Dr5 permits · to 2019