Building permits on Power St

The City of Toronto has 51 building permits on record for Power St, going back to 1994. Those permits created 0 homes and removed 2, a net change of -2. Declared construction value totals $9.3M. Half of the 42 permits issued here came through within 42 days of the application. The most recent permit was issued Mar 7, 2025 at 48 Power St.

Permits on record
511994–2025
Declared construction value
$9.3Mas filed, not adjusted
Homes created
0dwelling units
Homes removed
2net -2
Typical wait
42 days15 days slower than the city

Permits issued per year

20002025 (part year)

Zoning

Most common zone
CR86.3% of permits · by-law 40.10
In detached-house zones
0.0%38.0% below the city’s 38.0%
Permits with a zone
51of 51 on record
  • Commercial Residential44 · 86%
  • Residential7 · 14%

The zoning categories the permits on Power St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Other streets in M5A

Scadding Ave61 permits
Wascana Ave55 permits
St David St53 permits
Britain St49 permits
Henry Lane Ter49 permits
Polson St47 permits

Looking for one address on Power St? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Mar 7, 2025 Building Permit Related(PS) Plumbing - Proposed minor revisions to permits issued for the builld out of a retail space. Base building was submitted and approved under BP 17 250873, and currently closed. — Closed
Mar 7, 2025 Building Permit Related(MS) HVAC - Proposed minor revisions to permits issued for the builld out of a retail space. Base building was submitted and approved under BP 17 250873, and currently closed. — Closed
Mar 7, 2025 Interior Alterations Proposed minor revisions to permits issued for the builld out of a retail space. Base building was submitted and approved under BP 17 250873, and currently is closed. $2.0M Closed
Jan 26, 2024 Sign Building Permit Related 1 wall sign illuminated — Closed
Dec 20, 2023 Sign Building Permit Related To erect and display seven wall signs, with one face displaying static copy, with the following details:Sign S3 is an illuminated sign, measuring 2.13m vertically by 5.49m horizontally, at the height of 5.73m on the west elevation;Sign S4 is an illuminated sign, measuring 0.94m vertically by 7.81m h — Closed
Dec 15, 2023 Building Permit Related(PS) Plumbing - Proposed Interior Fit-out of ground floor and second floor Retail space for MUST Societe Toronto, located at 48 Power St, Toronto, ON. Base building was submitted and approved under BP 17 250873 — Open
Dec 13, 2023 Sign Building Permit Related Install 1 first party wall sign**Aisle** — Closed
Dec 6, 2023 Sign Building Permit Related Install 1 first party wall sign**Aisle Market** — Closed
Sep 26, 2023 Building Permit Related(PS) Plumbing - Proposed minor revisions to permits issued for the builld out of a retail space. Base building was submitted and approved under BP 17 250873, and currently closed. — Closed
Sep 26, 2023 Building Permit Related(MS) HVAC - Proposed minor revisions to permits issued for the builld out of a retail space. Base building was submitted and approved under BP 17 250873, and currently closed. — Closed
Sep 26, 2023 Interior Alterations Proposed minor revisions to permits issued for the builld out of a retail space. Base building was submitted and approved under BP 17 250873, and currently closed. — Closed
Feb 24, 2023 Building Permit Related(PS) Plumbing - Interior alterations to retail space unit 110 — Closed
Feb 3, 2023 Building Permit Related(MS) HVAC - Interior alterations to retail space unit 110 — Closed
Jan 17, 2023 Interior Alterations Interior alterations to retail space unit 110 $80K Closed
Jan 5, 2023 Building Permit Related(MS) HVAC - Proposed Interior Fit-out of ground floor and second floor Retail space for MUST Societe Toronto, located at 48 Power St, Toronto, ON. Base building was submitted and approved under BP 17 250873 — Closed
Jan 5, 2023 Interior Alterations Proposed Interior Fit-out of ground floor and second floor Retail space for MUST Societe Toronto, located at 48 Power St, Toronto, ON. Base building was submitted and approved under BP 17 250873 $5.0M Open
Dec 12, 2022 New Building REV 01: revision to base building retail area re: washrooms and escalators — New build
Dec 9, 2022 Building Permit Related(PS) Rev 01: revision to base building retail area re: washrooms and escalators — Closed
Dec 9, 2022 Building Permit Related(MS) rev 01: revisions to base building retail area re: washrooms and escalators — Closed
May 25, 2022 Backflow Prevention Devices (Water only) Installation of 1" backflow preventer $2K Closed
Jul 26, 2021 Electromagnetic Locks INSTALL 3 MAGLOCKS, LOCATIONS:1. DWG. E-302, GRID H, 22. DWG. E-304, NEAR GRID C, 73. DWG. E-304, NEAR GRID D, 6 $2K Closed
Jul 13, 2021 Garage Repair/Reconstruction Construct repairs to detached garage due to vehicle impact at 83 Power St - St Paul's Basilica $7K Open
Jun 11, 2021 Sign Building Permit Related To erect and display two illuminated wall signs, displaying static copy at the uppermost storeys on the west and east elevations. — Closed
Dec 7, 2020 Alternative Solution Alternative Solution Application to use type 304/304L stainless steel piping (4" pipe diameter and above) with Victaulic Stainless Steel fitting for domestic cold and hot water in place of copper pipes for portions of the domestic cold water distribution system at 48 Power St project as per. — Open
Oct 23, 2019 Partial Permit - Structural Framing Conditional Permit - Part Permit - Proposal to to construct a 19 and 22-storey mixed-use building consisting of a 5-storey podium and 2 towers, with retail uses on the first 2 storeys and residential uses above - 520 dwelling units in total, 3 levels of underground parking and 15 existing rental uni — Closed
Feb 19, 2019 Partial Permit - Foundation Conditional Permit - Part Permit - Proposal to to construct a 19 and 22-storey mixed-use building consisting of a 5-storey podium and 2 towers, with retail uses on the first 2 storeys and residential uses above - 520 dwelling units in total, 3 levels of underground parking and 15 existing rental uni — Closed
Oct 1, 2018 Building Permit Related (DR) Drain - Proposal to to construct a 19 and 22-storey mixed-use building consisting of a 5-storey podium and 2 towers, with retail uses on the first 2 storeys and residential uses above - 520 dwelling units, 3 levels of underground parking and 15 existing rental units are proposed to be replaced withi — Closed
Jul 19, 2018 Alternative Solution Alternative solution for a rooftop pool and deck - 3 sided — Closed
Jul 19, 2018 Alternative Solution Alternative solution for standpipe — Closed
Jun 12, 2018 Partial Permit - Shoring Conditional Permit - Part Permit - Proposal to to construct a 19 and 22-storey mixed-use building consisting of a 5-storey podium and 2 towers, with retail uses on the first 2 storeys and residential uses above - 520 dwelling units, 3 levels of underground parking and 15 existing rental units are pr — Closed
May 30, 2018 Demolition Proposal to demolish existing semi-detached dwelling. — Demolition
May 30, 2018 Demolition Proposal to demolish existing semi-detached dwelling. — Demolition
Aug 22, 2017 Demolition Proposal to demolish existing condo sales office. — Demolition
Aug 3, 2017 Re-Roofing/Re-Cladding Proposal for re-cladding in existing 2 storey office building. $9K Closed
Mar 28, 2017 Sign Building Permit Related In conjunction with a two storey building on the premises, proposal to erect and display three development wall signs and two identification wall signs on the north and east elevations. The proposed development wall signs on the north elevation are 3.42 metres vertically by 4.25 metres horizontally — Closed
Aug 16, 2016 Building Permit Related(MS) Revision # 01- To the stair/lift to access ramp at west end of the ground floor, revised washroom layout. HVAC - Proposal for interior alterations on the ground floor of an existing sales centre for future condo development - 48 Power Sales Centre — Closed
Aug 15, 2016 Interior Alterations Revision # 01- To the stair/lift to access ramp at west end of the ground floor, revised washroom layout.Proposal for interior alterations on the ground floor of an existing sales centre for future condo development - 48 Power Sales Centre — Closed
Jul 8, 2016 Building Permit Related(PS) Plumbing - Proposal for interior alterations on the ground floor of an existing sales centre for future condo development - 48 Power Sales Centre — Closed
Dec 7, 2015 Demolition Proposal to demolish existing 3 storey printing plant. — Demolition
Nov 22, 2010 Backflow Prevention Devices (Water only) Proposal to install a back flow preventor. Convenience address - 46 Power St. $3K Closed

The 40 most recent of 51 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Power St with a permit on record · 7

  • 48 Power St29 permits · to 2025
  • 50 Power St1 permit · to 2018
  • 52 Power St1 permit · to 2018
  • 54 Power St12 permits · to 2024
  • 83 Power St1 permit · to 2022
  • 93 Power St6 permits · to 2021
  • 94 Power St1 permit · to 1998