Street · 3758 of 8,516 by permit count
Building permits on Pegasus Trl, Scarborough
The City of Toronto has 40 building permits on record for Pegasus Trl in Scarborough, going back to 2000. Those permits created 1 homes and removed 1, a net change of +0. Declared construction value totals $1.0M. Half of the 39 permits issued here came through within 14 days of the application. The most recent permit was issued Oct 19, 2026 at 60 Pegasus Trl.
- Permits on record
- 402000–2026
- Declared construction value
- $1.0Mas filed, not adjusted
- Homes created
- 1dwelling units
- Homes removed
- 1net +0
- Typical wait
- 14 days13 days faster than the city
Permits issued per year
Zoning
- Most common zone
- RD100.0% of permits · by-law 10.20
- In detached-house zones
- 100.0%62.0% above the city’s 38.0%
- Permits with a zone
- 40of 40 on record
The zoning categories the permits on Pegasus Trl fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M1G
Looking for one address on Pegasus Trl? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 19, 2026 | Canopy | Proposal for existing patio cover roof to be approved. This is already constructed patio cover, no new construction required, the purpose of this application to get reviewed and approved by Toronto Building. | $10K | Open |
| Sep 22, 2026 | Back Water Valve (Sewer only) | Back water valve installation outside | — | Closed |
| Nov 10, 2025 | Inside and Outside Drains | PROPOSAL TO INCREASE THE WATER SERVICE PIPE INCREASE TO 1" | $4K | Open |
| Jul 3, 2025 | Accessory Building(s) | Proposal for side yard shed | $10K | Closed |
| May 28, 2025 | Carport | Proposed side yard shed/carport for a single family detached, one-storey dwelling. | $10K | Closed |
| Mar 17, 2025 | Interior Alterations | REVISION 01: 2 layers of type x drywall - fire rated 45 min.3 Units (1 family dwelling in the first floor and 2 family dwellings in the basmenet. | — | Closed |
| Feb 12, 2025 | New Building | Revision 02 - The only change is orientation and location of washroom in owner side and laundry in tenenat side and adding a door between two units.Revision 01 - Proposed interior alterations to convert basement into second suite of existing family dwelling. Proposal to construct a new 2 storey SFD. | — | New build |
| Jan 27, 2025 | Building Permit Related(MS) | HVAC - Rev - Proposed interior alterations to convert basement into second suite of existing family dwelling. Proposal to construct a new 2 storey SFD. | — | Closed |
| Feb 29, 2024 | Building Permit Related (DR) | Drain - 3 Units (1 family dwelling in the first floor and 2 family dwellings in the basmenet. | — | Closed |
| Feb 29, 2024 | Building Permit Related(PS) | Plumbing - 3 Units (1 family dwelling in the first floor and 2 family dwellings in the basmenet. | — | Closed |
| Feb 29, 2024 | Building Permit Related(MS) | HVAC - 3 Units (1 family dwelling in the first floor and 2 family dwellings in the basmenet. | — | Closed |
| Feb 23, 2023 | Demolition | Proposal to demolish an existing one storey SFD and construct a new two storey home. | — | Demolition |
| Feb 14, 2023 | Building Permit Related(PS) | Plumbing - Proposal to construct a new 2 storey SFD. | — | Closed |
| Feb 14, 2023 | Building Permit Related (DR) | Drain - Proposal to construct a new 2 storey SFD. | — | Open |
| Feb 1, 2021 | Building Permit Related (DR) | Drain - Proposed second suite in basement. | — | Closed |
| Feb 1, 2021 | Building Permit Related(PS) | Plumbing - Proposed second suite in basement. | — | Closed |
| Nov 2, 2020 | Second Suite (New) | Revision to the layout designProposed second suite in basement. | — | Closed |
| May 29, 2020 | Multiple Projects | Proposed 1-storey addition and new deck in the rear yard of the existing single family detached dwelling. | $200K | Closed |
| May 29, 2020 | Building Permit Related(MS) | HVAC - Proposed 1-storey addition and new deck in the rear yard of the existing single family detached dwelling. | — | Closed |
| Dec 4, 2019 | Building Permit Related(PS) | Plumbing - Proposed second storey addition over existing garage to existing two storey single family dwelling. | — | Closed |
| Nov 8, 2019 | Addition(s) | REVISION #1: ADDITIONAL EXTENSION OVER GARAGEProposed second storey addition over existing garage to existing two storey single family dwelling. | — | Open |
| Nov 23, 2017 | Interior Alterations | Proposed removal of load bearing wall, to be replaced with new beam. | $10K | Closed |
| Apr 6, 2017 | Back Water Valve (Sewer only) | install 1 back water valve and sump pump | — | Closed |
| Jun 13, 2016 | Building Permit Related (DR) | Drain - underpin existing basement, add 3 new windows | — | Closed |
| Jun 13, 2016 | Multiple Projects | underpin existing basement, add 3 new windows | $10K | Closed |
| Jul 22, 2014 | Interior Alterations | Rev # 1 - Revision to bathroom on the ground floor and basement walk out interior alterations to main floor & basement, new furnace and ductwork, rough in for bathroom in basement | — | Closed |
| Jul 9, 2014 | Back Water Valve (Sewer only) | Full port main line back water valve | — | Closed |
| Jun 23, 2014 | Building Permit Related(MS) | HVAC - interior alterations to main floor & basement, new furnace and ductwork, rough in for bathroom in basement | — | Closed |
| Jun 17, 2014 | Building Permit Related(PS) | Plumbing - interior alterations to main floor & basement, new furnace and ductwork, rough in for bathroom in basement | — | Closed |
| Feb 4, 2014 | Multiple Projects | Interior alteration to existing basement and ground floor and installation of a single door to exsiting garage | $5K | Closed |
| Feb 4, 2014 | Building Permit Related(PS) | Plumbing - Interior alteration to exisitng basement and ground floor and installation of a single door to exsiting garage | — | Closed |
| Feb 4, 2014 | Building Permit Related(MS) | HVAC - Interior alteration to exisitng basement and ground floor and installation of a single door to exsiting garage | — | Closed |
| Jul 17, 2013 | Back Water Valve (Sewer only) | install two 4" MAINLINE backwater vavles | $2K | Closed |
| Aug 7, 2012 | Building Permit Related(MS) | HVAC - second floor addition to existing, two storey rear addition, interior alterations and basement walkout | — | Closed |
| May 9, 2012 | Backflow Prevention Devices (Water only) | backwater valve | $2K | Closed |
| Apr 12, 2012 | Multiple Projects | Reconstruct existing ground floor and second floor addition, finished basement and basement walkout | $690K | Closed |
| Apr 12, 2012 | Building Permit Related(PS) | Plumbing - second floor addition to existing, two storey rear addition, interior alterations and basement walkout | — | Closed |
| Sep 1, 2011 | Underpinning | Underpin existing basement wall. | $20K | Closed |
| Jun 3, 2011 | Pool Fence Enclosure | replace existing pool fence enclosure | $3K | Closed |
| Dec 13, 2000 | Addition to Existing Building | UNHEATED SUNROOM ON PIERS | $24K | Closed |
The 40 most recent of 40 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Pegasus Trl with a permit on record · 16
- 1 Pegasus Trl1 permit · to 2011
- 15 Pegasus Trl1 permit · to 2025
- 19 Pegasus Trl1 permit · to 2017
- 26 Pegasus Trl1 permit · to 2026
- 47 Pegasus Trl5 permits · to 2025
- 56 Pegasus Trl2 permits · to 2020
- 59 Pegasus Trl1 permit · to 2013
- 60 Pegasus Trl5 permits · to 2026
- 61 Pegasus Trl1 permit · to 2014
- 98 Pegasus Trl1 permit · to 2017
- 104 Pegasus Trl1 permit · to 2000
- 121 Pegasus Trl2 permits · to 2019
- 124 Pegasus Trl5 permits · to 2025
- 126 Pegasus Trl10 permits · to 2021
- 133 Pegasus Trl2 permits · to 2016
- 139 Pegasus Trl1 permit · to 2012