The City of Toronto has 162 building permits on record for Park St in Scarborough, going back to 2000. Those permits created 20 homes and removed 10, a net change of +10. Declared construction value totals $5.8M. Half of the 154 permits issued here came through within 42 days of the application. The most recent permit was issued Oct 23, 2026 at 54 Park St.

Permits on record
1622000–2026
Declared construction value
$5.8Mas filed, not adjusted
Homes created
20dwelling units
Homes removed
10net +10
Typical wait
42 days15 days slower than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
RS61.7% of permits · by-law 10.40
In detached-house zones
38.3%in line with the city
Permits with a zone
162of 162 on record
  • Residential162 · 100%

The zoning categories the permits on Park St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Minor variances at the Committee of Adjustment

Applications on record
30since 2016
Approved
100.0%9.2% above the city · 29 decided
Median time to a decision
215 days95 days slower than the city

Some projects on Park St need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. Back to back, that is about 257 days, not the 42 days the permit figure alone suggests. How variances work, and the approval rates.

Other streets in M1N

Heale Ave179 permits
Sandown Ave171 permits
Atlee Ave168 permits
Kalmar Ave162 permits
Harding Blvd160 permits
Natal Ave156 permits
Dunington Dr155 permits
Red Deer Ave152 permits

Looking for one address on Park St? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Oct 23, 2026 Building Permit Related(PS) Plumbing - Proposal to demolish the existing one-storey detached single family dwelling and construct a new two-storey detached two unit dwelling. Part 2 — Open
Oct 23, 2026 Building Permit Related (DR) Drain - Proposal to demolish the existing one-storey detached single family dwelling and construct a new two-storey detached two unit dwelling. Part 2 — Open
Oct 22, 2026 Building Permit Related(PS) Plumbing - Proposal to construct a duplex on Part 1 Lot. — Open
Oct 22, 2026 Demolition Proposal to demolish the existing one-storey detached single family dwelling. — Demolition
Oct 22, 2026 New Building Proposal to demolish the existing one-storey detached single family dwelling and construct a new two-storey detached two unit dwelling. Part 2 $600K New build
Oct 22, 2026 New Building Proposal to construct a duplex on Part 1 Lot. $700K New build
Oct 2, 2026 Building Permit Related(PS) Plumbing - Proposed 2nd unit to the existing basement — Open
Oct 1, 2026 Second Suite (New) Proposed 2nd unit to the existing basement $30K Open
Sep 18, 2026 Solar Collector Installing solar PV on residential rooftop $25K Open
Sep 11, 2026 Second Suite (New) Proposed 2nd unit to the existing basement $30K Closed
Aug 11, 2026 Building Permit Related(PS) Plumbing - SEVER LOT INTO TWO AND BUILD NEW SINGLE FAMILY DWELLING. — Open
Aug 11, 2026 Building Permit Related(MS) HVAC - SEVER LOT INTO TWO AND BUILD NEW SINGLE FAMILY DWELLING. — Open
Aug 11, 2026 Building Permit Related (DR) Drain - SEVER LOT INTO TWO AND BUILD NEW SINGLE FAMILY DWELLING. — Open
Aug 11, 2026 Building Permit Related (DR) Drain - SEVER LOT INTO TWO AND BUILD NEW SINGLE FAMILY DWELLING. — Open
Aug 11, 2026 Demolition To demolish the existing detached house — Demolition
Aug 11, 2026 New Building SEVER LOT INTO TWO AND BUILD NEW SINGLE FAMILY DWELLING. $405K New build
Jul 29, 2026 Building Permit Related(MS) HVAC - PROP. SECOND DWELLING UNIT AT BASEMENT LEVEL — Open
Jul 23, 2026 Second Suite (New) PROP. SECOND DWELLING UNIT AT BASEMENT LEVEL $40K Open
Jul 23, 2026 Building Permit Related(PS) Plumbing - PROP. SECOND DWELLING UNIT AT BASEMENT LEVEL — Open
Jul 23, 2026 Building Permit Related (DR) Drain - PROP. SECOND DWELLING UNIT AT BASEMENT LEVEL — Open
Jul 17, 2026 Building Permit Related(MS) HVAC - SEVER LOT INTO TWO AND BUILD NEW SINGLE FAMILY DWELLING. — Open
Jul 17, 2026 Building Permit Related(PS) Plumbing - SEVER LOT INTO TWO AND BUILD NEW SINGLE FAMILY DWELLING. — Open
Jul 17, 2026 New Building SEVER LOT INTO TWO AND BUILD NEW SINGLE FAMILY DWELLING. $400K New build
Apr 29, 2026 Demolition Proposal to demolish the existing one-storey detached single family dwelling and construct a new two-storey detached two unit dwelling. Part 2 — Demolition
Sep 25, 2025 New Building Rev 02: To remove secondary suite in basement.Rev 01- Revision to convert the basement as a secondary suite and addition of a second floor front balcony.LOT B - West LotProposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 22 230592 DEM, — New build
Aug 26, 2025 Porch Proposed porch extension with existing guide wall and walkway renovation $80K Closed
Apr 22, 2025 Building Permit Related(PS) Revision 01: proposal to create secondary suite in basementPlumbing - LOT A - East LotProposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 22 230592 DEM, 20 168431 ZZC and 20 208748 MV. — Closed
Feb 25, 2025 Building Permit Related(PS) Plumbing - Removal of two load bearing walls on the ground floor. Relocation of supply and return ductwork form the ground floor. — Open
Nov 21, 2024 Building Permit Related(PS) Plumbing Rev 01- Revision to convert the basement as a secondary suite and addition of a second floor front balcony.- LOT B - West LotProposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 22 230592 DEM, 20 168462 ZZC and 20 208762 MV. — Closed
Nov 7, 2024 Building Permit Related(MS) HVAC - Removal of two load bearing walls on the ground floor. Relocation of supply and return ductwork form the ground floor. — Open
Oct 18, 2024 New Building Revision 01: proposal to interior alteration in basementLOT A - East LotProposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 22 230592 DEM, 20 168431 ZZC and 20 208748 MV. — New build
Aug 30, 2024 Interior Alterations Removal of two load bearing walls on the ground floor. Relocation of supply and return ductwork form the ground floor. $10K Open
Aug 12, 2024 Interior Alterations Proposed removal of two load bearing walls on the ground floor and relocation of supply and return ductwork from the ground floor. $10K Closed
Sep 13, 2023 Demolition Demolish existing house for new custom house — Demolition
Aug 18, 2023 Building Permit Related (DR) Drain - Demolish existing house for new custom house — Closed
Aug 18, 2023 New Building Demolish existing house for new custom house $600K New build
Aug 18, 2023 Building Permit Related(PS) Plumbing - Demolish existing house for new custom house — Closed
Aug 18, 2023 Building Permit Related(MS) HVAC - Demolish existing house for new custom house — Closed
Jul 26, 2023 New Building Revision 01. Proposal to demolish the existing house, sever the lot in two, and construct a new two storey stucco frame single family dwelling with finished basement, and integral garage. — New build
Jul 20, 2023 Multiple Projects REVISION#2: 2nd floor addition (remove rear addition part)REVISION#1: SECOND FLOOR ATTIC ADDITION (37.34SQ.M)Proposal for interior alterations, a 2 storey rear addition and a 2nd floor balcony to an existing 1 storey SFD-detached dwelling. — Open

The 40 most recent of 162 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Park St with a permit on record · 35

  • 3 Park St4 permits · to 2022
  • 6 Park St5 permits · to 2023
  • 11 Park St1 permit · to 2018
  • 14 Park St4 permits · to 2023
  • 20 Park St7 permits · to 2006
  • 22 Park St4 permits · to 2017
  • 24 Park St1 permit · to 2015
  • 25 Park St3 permits · to 2016
  • 37 Park St1 permit · to 2022
  • 38 Park St3 permits · to 2013
  • 40 Park St2 permits · to 2018
  • 41 Park St1 permit · to 2015
  • 43 Park St9 permits · to 2018
  • 47 Park St3 permits · to 2022
  • 54 Park St7 permits · to 2026
  • 57 Park St5 permits · to 2010
  • 64 Park St2 permits · to 2000
  • 68 Park St1 permit · to 2016
  • 70 Park St10 permits · to 2018
  • 89 Park St1 permit · to 2010
  • 92 Park St1 permit · to 2006
  • 95 Park St1 permit · to 2020
  • 96 Park St9 permits · to 2020
  • 100 Park St4 permits · to 2011
  • 106 Park St13 permits · to 2026
  • 117 Park St3 permits · to 2026
  • 121 Park St11 permits · to 2023
  • 124 Park St9 permits · to 2014
  • 126 Park St9 permits · to 2021
  • 130 Park St6 permits · to 2026
  • 131 Park St1 permit · to 2006
  • 133 Park St9 permits · to 2012
  • 139 Park St9 permits · to 2026
  • 164 Park St1 permit · to 2015
  • 166 Park St2 permits · to 2012
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
162
Data through
2026-10-23
Refresh
Daily from the City
Sheet
STR-228